Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20261F382  + (Ductline Plan & Details. Sheet 4.Revision Date Illegible)
  • ML20261F386  + (Ductline Plan & Dets. Sheet 3.Revision Date Illegible)
  • ML20261F391  + (Ductline Plan Security System - South Yard. Sheet 2. Revision Date Illegible)
  • ML20261F307  + (Ductline Sections Security System. Sheet 6.Revision Date Illegible)
  • ML22145A245  + (Dudekm-t3-bio)
  • ML22145A241  + (Dudesl-w15-bio)
  • ML22145A260  + (Dudesl-w18-bio)
  • NOC-AE-08002287, Due Date Extension for Three-Month Response to Generic Letter 2008-01  + (Due Date Extension for Three-Month Response to Generic Letter 2008-01)
  • ML081050250  + (Due Date Extension for Three-Month Response to Generic Letter 2008-01)
  • ML25274A003  + (Due Date Extension to Ria Responses to EPRI Report 3002023895, ML25142A157,Material Reliability Program Xlpr Estimation for PWR Loss-of-Coolant Accident Frequencies (MPR-480))
  • ML19207B941  + (Due to Anticipated Delays in Const Schedule,Requests Extension of CP to 871201.Forwards Bar Chart of Anticipated Const Program)
  • ML19281A566  + (Due to Conflict of Schedule,Requests That Control Bldg Prehearing Conference Be Moved to 790320.In Response to ASLB ,Requests ASLB Consider Extending Deadline for Filing Interrogatories Beyond 790328)
  • ML19206B175  + (Due to Delays in Applicants Submittal of Requested Info, QA Branch Will Be Unable to Provide SER Input for Chapter 14 Until 750825)
  • ML20062G232  + (Due to Delays in GEs Analysis of Reactor Protec Sys Pwr Supplies,Cpl Will Be Unable to Respond to as Previously Committed to in .Estimates Response by 790301)
  • 05000335/LER-2076-048, Due to Faulty Switch on Operators Console an Interrupt Signal Was Sent to Central Processing Unit Causing Digital Data Processor to Halt  + (Due to Faulty Switch on Operators Console an Interrupt Signal Was Sent to Central Processing Unit Causing Digital Data Processor to Halt)
  • ML20062G225  + (Due to Incomplete Resolution of Insvc Prog for Unit 1, Submittal of Rev Tech Specs Has Been Postponed Until After Details of Unit 3 Insvc Inspecc Prog Are Resolved)
  • ML20062C279  + (Due to Interlocutory Nature of 781027 Order by Aslb,Aslab Will Not Review Matters Considered in It Until ASLB Rules on Remaining Issues Re Constr Permit for Subj Facil.Thus 10 Day Period for Filing of Exceptions to 781027 Order Is Tolled)
  • ML18230A030  + (Due to Pagination Error, Sending Corrected Copies of the Transcript, Dated June 16, 1977, Letter Requesting to Use New Copy in Place of One Previously Received)
  • 05000416/LER-1983-080-03, Due to Problems W/Hvac Sys,Temp in Control Room Exceeded Required Limit Several Times.Caused by Malfunctioning Condenser Cooling Water Flow Control Valve.Limit Switch Adjusted  + (Due to Problems W/Hvac Sys,Temp in Control Room Exceeded Required Limit Several Times.Caused by Malfunctioning Condenser Cooling Water Flow Control Valve.Limit Switch Adjusted)
  • ML19263D748  + (Due to Resignation of M Mynczak on 781128,E Reeves Is Reassigned as Lead Engineer to Task B-24, Containment Purge During Normal Plant Operation)
  • ML20147F176  + (Due to Urgency of Requirement,Lic for Sweeney Mfg Co to Export Tritium to Hong Kong & Greece Was Granted W/O a 15-day Waiting Period)
  • ML19294A523  + (Due to Urgent Requirement of Proposed Export,License Was Issued to Applied Health Physics Inc to Export Source Matl to West Germany W/O 15-day Waiting Period)
  • ML19294A518  + (Due to Urgent Requirement of Proposed Export,License Was Issued to Edlow Intl to Export Nuclear Equip to Japan W/O 15-day Waiting Period)
  • ML19274E883  + (Due to Urgent Requirement of Proposed Export & Small Quantity of Matl Involved,License Has Been Issued to Westinghouse W/O Customary 15-day Waiting Period)
  • ML17159A331  + (Duiscusses Completion of Licensing Action for NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment, Dtd 960411,)