Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000250/1988010 + (16:47:25, 7 January 2025)
- ML17345A205 + (16:47:27, 7 January 2025)
- L-88-232, Forwards mgt-on-shift Weekly Summary Rept for Wk Starting 880509 + (16:47:28, 7 January 2025)
- ML17345A202 + (16:47:30, 7 January 2025)
- ML17345A201 + (16:47:32, 7 January 2025)
- TAC:59153 + (16:47:32, 7 January 2025)
- ML17345A199 + (16:47:34, 7 January 2025)
- ML17345A197 + (16:47:35, 7 January 2025)
- ML17345A196 + (16:47:37, 7 January 2025)
- 05000251/LER-1988-005-01, :on 880425,calibr of Nuclear Instrumentation Sys Power Range Detectors Performed Late.Caused by Personnel Error.Digital Data Processing Sys Repaired & Group Responsible for Performance Discussed Event + (16:47:42, 7 January 2025)
- ML17345A194 + (16:47:43, 7 January 2025)
- ML17345A192 + (16:47:45, 7 January 2025)
- IR 05000250/1988009 + (16:47:46, 7 January 2025)
- ML17345A189 + (16:47:48, 7 January 2025)
- L-88-234, Responds to Violations Noted in Insp Repts 50-250/88-07 & 50-251/88-07.Corrective Actions:Plant Change/Mods Implemented to Provide Seismic Gauges Which Will Remain Valved in at All Times + (16:47:49, 7 January 2025)
- ML17345A186 + (16:47:52, 7 January 2025)
- L-88-237, Responds to Generic Ltr 88-03, Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps. Procedural Controls Will Be Identified in Plant Procedures as NRC Commitments,To Ensure That Controls Maintained + (16:47:53, 7 January 2025)
- 05000250/LER-1988-006, :on 880408,surveillance of Hydrogen & Oxygen Concentration of Inservice Gas Decay Tank Missed.Caused by Personnel Error.Surveillance Incorporated Into Chemistry Primary Daily Worksheet & Personnel Counseled + (16:47:57, 7 January 2025)
- 05000251/LER-1988-004, Forwards Corrected LER 88-004,correcting Event Date in Block 5 of Rept Form as Submitted W/Util + (16:47:59, 7 January 2025)
- 05000251/LER-1988-004-03, :on 880408,Tech Spec 3.5-2,Item 3.2.b Exceeded. Caused by Failure of Relays in Undervoltage Protection Scheme.Relays Replaced & Satisfactorily Tested Before Unit Shutdown Commenced + (16:48:01, 7 January 2025)
- L-88-224, Responds to Violations Noted in Insp Repts 50-250/88-02 & 50-251/88-02.Corrective Actions:Ltr Issued Discussing Event & Importance of Procedural Compliance W/Administrative Procedure 0103.41, Caution Tag Clearance Procedure + (16:48:02, 7 January 2025)
- ML17345A177 + (16:48:05, 7 January 2025)
- ML17345A175 + (16:48:06, 7 January 2025)
- L-88-216, Advises That Util Implemented Organization Change in Nuclear Energy Dept.Author Assumed Position of Vice President. Changes Made Under Provisions of 10CFR50.54(a)(3) in That Changes Do Not Reduce Commitments to QA + (16:48:08, 7 January 2025)
- ML17345A172 + (16:48:08, 7 January 2025)
- L-88-219, Forwards Suggested Changes,In Form of marked-up Pages,To Draft Radioactive Effluent Info for 1986 + (16:48:11, 7 January 2025)
- L-88-230, Forwards Select Sys Assessment Progress Summary Rept for Apr 1988 + (16:48:12, 7 January 2025)
- 05000250/LER-1988-005, :on 880415,loss of Flowpath from Boric Acid Storage Tanks to RCS Occurred.Caused by Loose Screw in Motor/Pump Coupling.Boric Acid Transfer Pump 4A Realigned to Provide Boric Acid Flow Path to Unit 3 + (16:48:15, 7 January 2025)
- L-88-222, Monthly Operating Repts for Apr 1988 + (16:48:17, 7 January 2025)
- ML17345A156 + (16:48:19, 7 January 2025)
- PNO-II-88-030, on 880506,plant Security Officer Reportedly Exchanged Gunfire W/Unknown Persons on Owner Property.Metro Police Dept Conducting Investigation in Conjuction W/ Licensee.Fbi Also Notified & Agents Dispatched to Site + (16:48:23, 7 January 2025)
- ML17345A151 + (16:48:28, 7 January 2025)
- NLS2017095, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RI-21, Revision 1 + (16:48:29, 7 January 2025)
- ML17345A141 + (16:48:30, 7 January 2025)
- TAC:67436 + (16:48:32, 7 January 2025)
- ML17345A140 + (16:48:32, 7 January 2025)
- ML17345A138 + (16:48:34, 7 January 2025)
- L-88-190, Rev 1 to Turkey Point Plant Unit 3 Cycle XI Startup Rept + (16:48:35, 7 January 2025)
- 05000251/LER-1988-004-02, :on 880408,Tech Spec Table 3.5-2 Requirements Exceeded.Caused by Failure of Relays 327TX/4A2 & 327TX/4A2 in Undervoltage Protection Scheme for 4A 480 Volt Load Ctr. Relays Replaced & Tested + (16:48:38, 7 January 2025)
- L-88-127, Requests Extension of Issuance of Revised Engineering Evaluation for Unit 3 to 2 Months Following 4 Month Performance Test of Component Cooling Water HX Continuous Tube Cleaning Sys + (16:48:39, 7 January 2025)
- ML17345A134 + (16:48:41, 7 January 2025)
- L-88-207, Responds to NRC 871030 Request for Licensee Plan for Complying w/10CFR50,App G,Section V.C Re Fracture Toughness Requirements & Recommendations That Util Surveillance Program Revised & Integrated Analysis Provided + (16:48:42, 7 January 2025)
- L-88-203, Special Rept:Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Caused by Implementation of Plant Mods & Equipment Malfunction. Compensatory Measures Implemented as Applicable + (16:48:44, 7 January 2025)
- ML17345A130 + (16:48:47, 7 January 2025)
- ML17345A127 + (16:48:48, 7 January 2025)
- L-88-192, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/87-54 & 50-251/87-54.Corrective Actions:Gauges to Be in Svc During Off Normal/Emergency Condition Instead of Being Isolated & Procedure Onop 0208.11 Revised + (16:48:49, 7 January 2025)
- IR 05000250/1988005 + (16:48:56, 7 January 2025)
- ML17345A091 + (16:49:00, 7 January 2025)
- ML17345A055 + (16:49:02, 7 January 2025)
- ML17345A052 + (16:49:03, 7 January 2025)
- EPID:L-2017-LLR-0141 + (16:49:05, 7 January 2025)