L-88-230, Forwards Select Sys Assessment Progress Summary Rept for Apr 1988
| ML17345A164 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/13/1988 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| L-88-230, NUDOCS 8805230070 | |
| Download: ML17345A164 (6) | |
Text
," ACCELERATED IIIRIBUTJON DEMONSTPHON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8805230070 DOC.DATE: 88/05/13 NOTARIZED: NO DOCKET g
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Florida Power
& Light. Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards select sys assessment progress summary rept for Apr 1988.
DISTRIBUTION CODE: A001D COPIES RECEIVED LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES 8
I RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 N
GC - BSTRACT EG L
01 EXTERNAL LPDR NSIC COPIES LTTR ENCL 1
0 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPXENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E
'RR/PMAS/ILRB12 OGC 15-B-18 RES/DE/EIB NRC PDR COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 D
9 S
D' A
9 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 19 L
c I
I C
t)
P OX 14000, JUNO BEACH, FL 33408-0420
+N/@
~~re%~
NAY, 1 3 j988 L-88-23 0 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Select S stem Assessment Pro ress Summar Attached please find the April 1988 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours,
/ W. F.
Senio nway ice President Nuclear WFC/SDF/gp Attachment cc:
Dr. J.
Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant SDF.SS 8805230070 880513 PDR ADOCK 05000250 R
nCD an FPL Group company
0
SELECT SYSTEM REV1EW APRIL 1988 PROGRESS DESIGN BASIS RECONSTITUTION Work continues on a risk based assessment of historic Plant Changes/Modifications.
Reconstitution of design bases for Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Coolers continues in accordance with the Integrated Schedule.
Issuance of the draft is scheduled for November 1988.
Design Basis Verification activities for the original fifteen Select Systems continues in accordance with the Integrated Schedule.
Completion of the activity is scheduled for May 1988.
SAFETY ENGINEERING GROUP SEG The SEG is continuing to review the Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Cooling Systems to identify those items appropriate for punchlisting and further review and action.
Items for Normal Containment Cooling have been submitted to the System Engineer for evaluation and action.
WALKDOWNS Preparations continue toward performing Small Bore Piping and Tubing and P&ID walkdowns of outside containment portions of the Area Radiation Monitoring, Process Radiation Monitoring and Normal Containment Cooling systems.
These activities will proceed in accordance with the Integrated Schedule.
Completion is scheduled for February 1989 and August.
- 1988, respectively.