Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-88-221, Provides Util Work Plan & Schedule for Proposed Enhancement of Existing Onsite Power Distribution Sys.Util Will Give Presentation on Emergency Power Sys Enhancement in Near Future + (16:46:43, 7 January 2025)
- 05000250/LER-1988-007, :on 880427,3A Intake Cooling Water (Icw) Pump out-of-svc Due to Discharge Pressure Gauge Piping Failure. Caused by Corrosion of Coupling Attaching Pressure Gauge Piping to Icw Discharge Pipe.Piping Repaired + (16:46:47, 7 January 2025)
- L-88-200, Forwards Summary Rept of Integrated Schedule Generated for Apr 1988,per Integrated Schedule Plan + (16:46:48, 7 January 2025)
- L-88-242, Requests That Remaining Portions of Project 1,Task 5.1, Remove Temporary Facilities, Be Terminated,Per Section IV of NRC 860812 Confirmatory Order.Only 16 of 56 Trailers Occupied & Not Accounted for in Original Scope of Project + (16:46:55, 7 January 2025)
- ML17345A229 + (16:46:58, 7 January 2025)
- ML17345A227 + (16:47:00, 7 January 2025)
- L-88-239, Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. Program Implemented to Monitor,Identify,Evaluate & Correct Small Primary Coolant Leaks + (16:47:01, 7 January 2025)
- ML17345A223 + (16:47:04, 7 January 2025)
- ML17345A222 + (16:47:06, 7 January 2025)
- IR 05000250/1988008 + (16:47:15, 7 January 2025)
- ML17345A219 + (16:47:16, 7 January 2025)
- ML17345A216 + (16:47:18, 7 January 2025)
- ML17345A214 + (16:47:19, 7 January 2025)
- L-88-240, Forwards mgt-on-shift Weekly Repts,Per NRC 871019 Order + (16:47:20, 7 January 2025)
- ML17345A212 + (16:47:23, 7 January 2025)
- ML17345A210 + (16:47:24, 7 January 2025)
- IR 05000250/1988010 + (16:47:25, 7 January 2025)
- ML17345A205 + (16:47:27, 7 January 2025)
- L-88-232, Forwards mgt-on-shift Weekly Summary Rept for Wk Starting 880509 + (16:47:28, 7 January 2025)
- ML17345A202 + (16:47:30, 7 January 2025)
- ML17345A201 + (16:47:32, 7 January 2025)
- TAC:59153 + (16:47:32, 7 January 2025)
- ML17345A199 + (16:47:34, 7 January 2025)
- ML17345A197 + (16:47:35, 7 January 2025)
- ML17345A196 + (16:47:37, 7 January 2025)
- 05000251/LER-1988-005-01, :on 880425,calibr of Nuclear Instrumentation Sys Power Range Detectors Performed Late.Caused by Personnel Error.Digital Data Processing Sys Repaired & Group Responsible for Performance Discussed Event + (16:47:42, 7 January 2025)
- ML17345A194 + (16:47:43, 7 January 2025)
- ML17345A192 + (16:47:45, 7 January 2025)
- IR 05000250/1988009 + (16:47:46, 7 January 2025)
- ML17345A189 + (16:47:48, 7 January 2025)
- L-88-234, Responds to Violations Noted in Insp Repts 50-250/88-07 & 50-251/88-07.Corrective Actions:Plant Change/Mods Implemented to Provide Seismic Gauges Which Will Remain Valved in at All Times + (16:47:49, 7 January 2025)
- ML17345A186 + (16:47:52, 7 January 2025)
- L-88-237, Responds to Generic Ltr 88-03, Resolution of Generic Safety Issue 93, Steam Binding of Auxiliary Feedwater Pumps. Procedural Controls Will Be Identified in Plant Procedures as NRC Commitments,To Ensure That Controls Maintained + (16:47:53, 7 January 2025)
- 05000250/LER-1988-006, :on 880408,surveillance of Hydrogen & Oxygen Concentration of Inservice Gas Decay Tank Missed.Caused by Personnel Error.Surveillance Incorporated Into Chemistry Primary Daily Worksheet & Personnel Counseled + (16:47:57, 7 January 2025)
- 05000251/LER-1988-004, Forwards Corrected LER 88-004,correcting Event Date in Block 5 of Rept Form as Submitted W/Util + (16:47:59, 7 January 2025)
- 05000251/LER-1988-004-03, :on 880408,Tech Spec 3.5-2,Item 3.2.b Exceeded. Caused by Failure of Relays in Undervoltage Protection Scheme.Relays Replaced & Satisfactorily Tested Before Unit Shutdown Commenced + (16:48:01, 7 January 2025)
- L-88-224, Responds to Violations Noted in Insp Repts 50-250/88-02 & 50-251/88-02.Corrective Actions:Ltr Issued Discussing Event & Importance of Procedural Compliance W/Administrative Procedure 0103.41, Caution Tag Clearance Procedure + (16:48:02, 7 January 2025)
- ML17345A177 + (16:48:05, 7 January 2025)
- ML17345A175 + (16:48:06, 7 January 2025)
- L-88-216, Advises That Util Implemented Organization Change in Nuclear Energy Dept.Author Assumed Position of Vice President. Changes Made Under Provisions of 10CFR50.54(a)(3) in That Changes Do Not Reduce Commitments to QA + (16:48:08, 7 January 2025)
- ML17345A172 + (16:48:08, 7 January 2025)
- L-88-219, Forwards Suggested Changes,In Form of marked-up Pages,To Draft Radioactive Effluent Info for 1986 + (16:48:11, 7 January 2025)
- L-88-230, Forwards Select Sys Assessment Progress Summary Rept for Apr 1988 + (16:48:12, 7 January 2025)
- 05000250/LER-1988-005, :on 880415,loss of Flowpath from Boric Acid Storage Tanks to RCS Occurred.Caused by Loose Screw in Motor/Pump Coupling.Boric Acid Transfer Pump 4A Realigned to Provide Boric Acid Flow Path to Unit 3 + (16:48:15, 7 January 2025)
- L-88-222, Monthly Operating Repts for Apr 1988 + (16:48:17, 7 January 2025)
- ML17345A156 + (16:48:19, 7 January 2025)
- PNO-II-88-030, on 880506,plant Security Officer Reportedly Exchanged Gunfire W/Unknown Persons on Owner Property.Metro Police Dept Conducting Investigation in Conjuction W/ Licensee.Fbi Also Notified & Agents Dispatched to Site + (16:48:23, 7 January 2025)
- ML17345A151 + (16:48:28, 7 January 2025)
- NLS2017095, Response to Nuclear Regulatory Commission Request for Additional Information for Relief Request RI-21, Revision 1 + (16:48:29, 7 January 2025)
- ML17345A141 + (16:48:30, 7 January 2025)
- TAC:67436 + (16:48:32, 7 January 2025)