Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20180545, Design Certification Review Discussions + (00:35:27, 6 January 2025)
- ML18152B833 + (00:35:28, 6 January 2025)
- ML18152B832 + (00:35:29, 6 January 2025)
- RIS 2018-03, National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material + (00:35:30, 6 January 2025)
- 05000280/LER-1998-008, :on 980228,auxiliary Ventilation Fans Were Noted in Condition Outside of Design Basis.Caused by Failure to Recognize Potential Impact of Certain Design Basis Accident Scenarios.No Corrective Actions Needed + (00:35:32, 6 January 2025)
- PNO-II-98-027, on 980520,licensee Identified That non- Isolable Leak Existed on 2-inch Isolation Valve for a Reactor Coolant Loop Stop Valve Bypass Flow Instrument. Licensee Currently Developing Plans to Replace Valve + (00:35:35, 6 January 2025)
- ML18152B819 + (00:35:36, 6 January 2025)
- IR 05000280/1998201 + (00:35:37, 6 January 2025)
- ML18152B817 + (00:35:39, 6 January 2025)
- ML18152B816 + (00:35:40, 6 January 2025)
- ML18152B814 + (00:35:43, 6 January 2025)
- ML18152B812 + (00:35:44, 6 January 2025)
- ML18152B810 + (00:35:45, 6 January 2025)
- PNO-II-98-026, on 980509,licensee Identified non-isolable Leak Existed on Seal Injection Line to Unit 1 C RCP Pump. Licensee Making Preparations to Drain C Reactor Coolant Loop & Effect Repairs.Unit Will Be Shutdown for More than 72 H + (00:35:47, 6 January 2025)
- ML18152B808 + (00:35:48, 6 January 2025)
- ML18152B807 + (00:35:48, 6 January 2025)
- ML18152B806 + (00:35:49, 6 January 2025)
- ML18152B803 + (00:35:50, 6 January 2025)
- ML18152B802 + (00:35:51, 6 January 2025)
- TAC:MA0657 + (00:35:52, 6 January 2025)
- ML18152B801 + (00:35:52, 6 January 2025)
- ML18152B799 + (00:35:54, 6 January 2025)
- TAC:M99905 + (00:35:54, 6 January 2025)
- ML18152B797 + (00:35:55, 6 January 2025)
- ML18152B796 + (00:35:56, 6 January 2025)
- 05000280/LER-1998-007, :on 980330,radiation Monitors Were Declared Inoperable.Caused by Change in Operating Temperature Range. Preplanned Alternate Method of Monitoring Was Initiated IAW TS Table 3.7-6 + (00:35:57, 6 January 2025)
- IR 05000280/1998099 + (00:36:00, 6 January 2025)
- ML18152B790 + (00:36:01, 6 January 2025)
- TAC:MA1277 + (00:36:03, 6 January 2025)
- ML18152B788 + (00:36:03, 6 January 2025)
- ML18152B786 + (00:36:04, 6 January 2025)
- ML18152B785 + (00:36:05, 6 January 2025)
- ML18152B783 + (00:36:06, 6 January 2025)
- ML18152B784 + (00:36:06, 6 January 2025)
- 05000280/LER-1998-010, :on 980715,low Intake Canal Level Instrument Channel I Was Declared Inoperable to Allow Testing of Intake Canal Level Probe 1-CW-LE-102.Subject Probe Was Cleaned by Diver,Tested & Channel I Was Returned to Operable Status + (00:36:08, 6 January 2025)
- ML18152B778 + (00:36:13, 6 January 2025)
- ML18152B777 + (00:36:17, 6 January 2025)
- ML18152B776 + (00:36:18, 6 January 2025)
- ML18152B775 + (00:36:19, 6 January 2025)
- ML18152B769 + (00:36:20, 6 January 2025)
- ML18152B766 + (00:36:21, 6 January 2025)
- ML18152B764 + (00:36:22, 6 January 2025)
- ML18152B765 + (00:36:22, 6 January 2025)
- ML18152B763 + (00:36:23, 6 January 2025)
- ML18152B762 + (00:36:24, 6 January 2025)
- ML18152B760 + (00:36:24, 6 January 2025)
- ML18152B757 + (00:36:25, 6 January 2025)
- ML18152B758 + (00:36:25, 6 January 2025)
- ML18152B755 + (00:36:26, 6 January 2025)
- ML18152B754 + (00:36:27, 6 January 2025)
- ML18152B753 + (00:36:28, 6 January 2025)