Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- WEC Energy Group + (01:03:16, 17 April 2020)
- ML20085F603 + (01:43:37, 17 April 2020)
- Southern Nuclear + (02:41:42, 17 April 2020)
- EPID:L-2020-LRM-0011 + (01:43:55, 18 April 2020)
- EPID:L-2020-LLA-0023 + (03:40:35, 18 April 2020)
- EPID:L-2020-LLS-0000 + (03:54:42, 18 April 2020)
- 05000413/LER-1995-001, Forwards LER 95-001 Re TS 3.0.3 Entry Due to Both Trains of CR Ventilation Inoperable + (10:27:11, 18 April 2020)
- ML20083K704 + (00:19:48, 19 April 2020)
- ML20083K703 + (00:19:54, 19 April 2020)
- ML20083K445 + (00:45:07, 19 April 2020)
- ML20083K386 + (00:49:50, 19 April 2020)
- EPID:L-2020-LLR-0036 + (02:32:08, 19 April 2020)
- ML20083J324 + (02:44:19, 19 April 2020)
- ML20083H167 + (04:31:05, 19 April 2020)
- ML20083H165 + (04:31:52, 19 April 2020)
- ML20083H152 + (04:36:57, 19 April 2020)
- M200043, Annual Statement of Non-availability of Federal Government Funding for Conversion from HEU to Leu for Vnc Nuclear Test Reactor (Ntr) + (07:10:06, 19 April 2020)
- 05000327/LER-1995-004, Forwards LER 95-004 Re Identification That SR for Source Range Instruments in Both Units Auxiliary CRs Was Not Being Performed as Required by TS 3.3.3.5 + (14:50:07, 19 April 2020)
- 05000339/LER-1995-001, Forwards LER 95-001 Re Main Steam & Pressurizer Safety Valve Setpoints Out of Tolerance Due to Setpoint Drift + (15:56:59, 19 April 2020)
- 05000266/LER-1995-003, Forwards LER 95-003 Re Inadvertent EDG Start + (00:01:24, 20 April 2020)
- 05000289/LER-1995-001, Forwards LER 95-001 Re Rc Leak Caused by Failure of Parker Hannifin Instrument Tube Compression Fitting That Was Found Inadequately Tightened + (10:26:34, 20 April 2020)
- RCU + (13:06:55, 20 April 2020)
- 05000301/LER-1995-001, Forwards LER 95-001 Re Inadvertent EDG Start.Rept Describes Situation That Caused Normal Power Supply Breaker for Unit 2 Train A,4160 Volt Safeguards Bus to Open + (15:44:10, 20 April 2020)
- Georgia Radioactive Material Program + (12:50:53, 21 April 2020)
- Property:License number + (12:55:26, 21 April 2020)
- California Radiation Control Program + (12:57:31, 21 April 2020)
- ML20080L637 + (21:05:49, 21 April 2020)
- EPID:L-2019-LLR-0035 + (04:21:39, 22 April 2020)
- ML20080G828 + (05:05:17, 22 April 2020)
- ML20080F893 + (06:55:13, 22 April 2020)
- NOC-AE-20003719, Operator Licensing Examination Schedule + (00:48:56, 23 April 2020)
- ML20079K185 + (03:18:43, 23 April 2020)
- NUHOMS + (12:02:45, 23 April 2020)
- ML20077J287 + (20:45:33, 25 April 2020)
- J. J. Barton + (02:16:34, 26 April 2020)
- FirstEnergy + (02:27:15, 26 April 2020)
- EPID:L-2017-TOP-0035 + (23:23:19, 26 April 2020)
- ML20076D313 + (23:23:27, 26 April 2020)
- EPID:L-2019-LLA-0255 + (01:39:55, 27 April 2020)
- EPID:L-2020-LLR-0033 + (03:16:09, 27 April 2020)
- ML20073P274 + (11:40:49, 27 April 2020)
- EPID:L-2020-LRM-0026 + (04:26:26, 28 April 2020)
- EPID:L-2020-LLE-0015 + (04:26:46, 28 April 2020)
- EPID:L-2020-LLA-0011 + (04:29:30, 28 April 2020)
- EPID:L-2020-NEW-0000 + (04:45:05, 28 April 2020)
- EPID:L-2020-LLA-0045 + (04:47:07, 28 April 2020)
- EPID:L-2020-LLE-0019 + (05:02:09, 28 April 2020)
- EPID:L-2020-LLE-0025 + (05:03:33, 28 April 2020)
- EPID:L-2020-LLA-0078 + (05:15:50, 28 April 2020)
- EPID:L-2020-LLA-0051 + (05:19:18, 28 April 2020)
- EPID:L-2020-LLA-0055 + (05:55:09, 28 April 2020)