Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20220862, Preapplication Meeting with SMR, LLC (a Holtec International Company) Regarding a Potential Exemption Related to Closed System Isolation Valves to Support the Construction Permit for the SMR-160 Design + (23:08:45, 15 September 2025)
- PMNS20220861, Preapplication Meeting with SMR, LLC (a Holtec International Company) Regarding a Potential Exemption to Containment Heat Removal Testing to Support the Construction Permit for the SMR-160 Design + (23:08:47, 15 September 2025)
- ML22259A064 + (23:08:50, 15 September 2025)
- ML22259A001 + (23:08:55, 15 September 2025)
- ML22258A282 + (23:09:00, 15 September 2025)
- ML22258A280 + (23:09:01, 15 September 2025)
- ML22258A061 + (23:09:42, 15 September 2025)
- ML22258A059 + (23:09:45, 15 September 2025)
- ML22258A055 + (23:09:47, 15 September 2025)
- ML22257A252 + (23:09:52, 15 September 2025)
- ML22257A250 + (23:09:53, 15 September 2025)
- ML22257A245 + (23:09:55, 15 September 2025)
- ML22257A188 + (23:10:07, 15 September 2025)
- ML22257A180 + (23:10:09, 15 September 2025)
- PMNS20220902, Partially Closed Meeting with the Nuclear Regulatory Commission and Framatome Inc. to Discuss Degraded Piping Solution + (23:10:12, 15 September 2025)
- ML22256A329 + (23:10:45, 15 September 2025)
- EPID:L-2022-LLA-0011 + (23:10:53, 15 September 2025)
- PMNS20220942, U. S. Nuclear Regulatory Commission (NRC) Public Meeting with the Nuclear Energy Institute (NEI) to Discuss the Review of NEI-99-01, Rev. 7 Draft G, Development of Emergency Action Levels for Non-Passive Reactors + (23:11:03, 15 September 2025)
- PMNS20220966, Preapplication Meeting with SMR, LLC (a Holtec International Company) Regarding Reactivity Control Aspects of the Control Rod Drive System to Support the Construction Permit for the SMR-160 Design + (23:11:11, 15 September 2025)
- PMNS20220859, Preapplication Meeting with SMR, LLC (a Holtec International Company) Regarding Spent Fuel Makeup Compliance to Support the Construction Permit for the SMR-160 Design + (23:11:14, 15 September 2025)
- ML22256A024 + (23:11:24, 15 September 2025)
- ML22256A022 + (23:11:26, 15 September 2025)
- ML22256A020 + (23:11:29, 15 September 2025)
- PMNS20220961, Preapplication Meeting with SMR, LLC (a Holtec International Company) Regarding Its White Paper on Instrumentation and Control Architecture to Support the Construction Permit for the Holtec SMR-160 Design + (23:11:32, 15 September 2025)
- ML22255A237 + (23:11:34, 15 September 2025)
- ML22255A235 + (23:11:36, 15 September 2025)
- ML22255A221 + (23:11:39, 15 September 2025)
- PMNS20220960, Meeting with X Energy LLC Regarding Xe-100 Control Room Staffing Analysis Methodology and Associated Implementation Plans Topical Report + (23:11:44, 15 September 2025)
- ML22255A177 + (23:11:51, 15 September 2025)
- ML22255A107 + (23:12:01, 15 September 2025)
- ML22255A095 + (23:12:07, 15 September 2025)
- ML22255A092 + (23:12:09, 15 September 2025)
- ML22255A083 + (23:12:11, 15 September 2025)
- ML22255A057 + (23:12:13, 15 September 2025)
- ML22252A252 + (23:12:21, 15 September 2025)
- PMNS20220926, Public Meeting Regarding the NRC Staffs Review of General Atomics Fast Modular Reactor Principal Design Criteria Topical Report + (23:12:26, 15 September 2025)
- ML22252A194 + (23:12:28, 15 September 2025)
- ML22252A183 + (23:12:32, 15 September 2025)
- ML22252A182 + (23:12:33, 15 September 2025)
- ML22252A144 + (23:12:39, 15 September 2025)
- PMNS20220842, Preapplication Meeting with NuScale Power, LLC, Regarding Plans by the Carbon Free Power Project (CFPP) to Submit a Limited Work Authorization (LWA) to the NRC for Approval + (23:12:43, 15 September 2025)
- ML22252A027 + (23:12:54, 15 September 2025)