Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NG-13-0298, CFR 72.48 Report of Changes, Tests, and Experiments + (11:24:37, 11 January 2025)
- ML13212A171 + (11:24:38, 11 January 2025)
- ML13212A169 + (11:24:39, 11 January 2025)
- 05000220/LER-2013-001, Emergency Condenser 11 High Steam Flow Isolation Instrumentation Loss During Plant Startup + (11:24:41, 11 January 2025)
- ML13212A162 + (11:24:44, 11 January 2025)
- JAFP-13-0099, Generic Fundamentals Examination + (11:24:45, 11 January 2025)
- ML13212A157 + (11:24:45, 11 January 2025)
- DCL-13-077, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2012 + (11:24:46, 11 January 2025)
- 05000323/LER-2013-004, Regarding Technical Specification 3.8.1 Not Met Due to Failed Wire Lug on Emergency Diesel Generator 2-3 + (11:24:48, 11 January 2025)
- IR 05000271/2013008 + (11:24:52, 11 January 2025)
- ML13212A115 + (11:24:55, 11 January 2025)
- ML13212A103 + (11:24:57, 11 January 2025)
- CP-201300816, Submittal of Completed NRC Form 536, Operator Licensing Examination Data, for the Cy 2015 Through 2018 + (11:24:59, 11 January 2025)
- ML13212A100 + (11:24:59, 11 January 2025)
- ML13212A084 + (11:25:00, 11 January 2025)
- 05000339/LER-2013-002, Regarding Manual Reactor Trip Due to Closure of 2-FW-MOV-250C and Auto-Start of 2-FW-P-1B + (11:25:03, 11 January 2025)
- SVP-13-050, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report + (11:25:03, 11 January 2025)
- ML13212A071 + (11:25:04, 11 January 2025)
- ML13212A069 + (11:25:06, 11 January 2025)
- ML13212A058 + (11:25:07, 11 January 2025)
- ML13212A067 + (11:25:07, 11 January 2025)
- ML13212A051 + (11:25:08, 11 January 2025)
- IR 05000282/2013003 + (11:25:17, 11 January 2025)
- L-13-223, License Amendment Request to Implement 10 CFR 50.61a. Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events + (11:25:18, 11 January 2025)
- 05000263/LER-2013-003, Regarding Inadequate External Flooding Procedure + (11:25:22, 11 January 2025)
- L-2013-229, Request for Additional Information - 2013 Decommissioning Funding Status Reports + (11:25:23, 11 January 2025)
- IR 05000354/2013003 + (11:25:55, 11 January 2025)
- ML13212A009 + (11:25:56, 11 January 2025)
- ML13211A473 + (11:25:58, 11 January 2025)
- IR 05000445/2013003 + (11:26:20, 11 January 2025)
- IR 05000269/2013003 + (11:26:22, 11 January 2025)
- ML13211A446 + (11:26:23, 11 January 2025)
- IR 05000498/2013003 + (11:26:45, 11 January 2025)
- RS-13-197, Registration of Use of Cask to Store Spent Fuel + (11:26:46, 11 January 2025)
- ML13211A403 + (11:26:47, 11 January 2025)
- ML13211A390 + (11:26:48, 11 January 2025)
- ML13211A402 + (11:26:48, 11 January 2025)
- ML13211A378 + (11:26:49, 11 January 2025)
- LIC-13-0099, Plan for Sustained Improvement, Revision 0 + (11:26:53, 11 January 2025)
- PLA-7050, Seismic Walkdown Report for Inaccessible Equipment - Unit 2, Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic + (11:26:55, 11 January 2025)
- ML13211A351 + (11:26:55, 11 January 2025)
- SVP-13-044, Day Post Outage ISI Letter + (11:26:57, 11 January 2025)
- ML13211A338 + (11:26:58, 11 January 2025)
- ML13211A327 + (11:26:59, 11 January 2025)
- ML13211A324 + (11:27:00, 11 January 2025)
- 05000259/LER-2011-009-03, Regarding As-Found Undervoltage Trip for the Reactor Protection System 1A1 Relay That Did Not Meet Acceptance Criteria During Several Surveillance + (11:27:01, 11 January 2025)
- ML13211A314 + (11:27:05, 11 January 2025)
- ML13211A313 + (11:27:06, 11 January 2025)
- NL-13-1621, ISFSI, 10 CFR 72.48(d)(2) Biennial Report + (11:27:07, 11 January 2025)
- ML13211A283 + (11:27:08, 11 January 2025)
- IR 05000461/2013003 + (11:27:30, 11 January 2025)