ONS-2015-070, . 2, and 3 - Ufsar/Selected Licensee Commitments Change
| ML15177A100 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/23/2015 |
| From: | Batson S Duke Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ONS-2015-070 | |
| Download: ML15177A100 (25) | |
Text
DUKE Scott L.
Batson ENERGY Vice President ENERGY.Oconee Nuclear Station Duke Energy ONOIVP 17800 Rochester Hwy Seneca, SC 29672 10 CFR 50.71(e) o: 864.873.3274 ONS-2015-070
- f. 864.873.4208 Scott.Batson@duke-energy.com June 23, 2015 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2746
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 50-270, and 50-287 UFSAR/Selected Licensee Commitments Change Pursuant to 10 CFR 50.71(e), please find attached the latest revision to the Oconee Nuclear Station Selected Licensee Commitments (SLC) Manual. The SLC Manual constitutes Chapter 16 of the Updated Final Safety Analysis Report (UFSAR). The SLC Manual is being revised to delete SLC 16.8.5, Keowee Hydro Unit (KHU) Steady State Frequency. This change was implemented concurrent with Amendment Nos. 390, 392, 391, which added equivalent requirements to Technical Specification (TS) 3.8.1, AC Sources - Operating.
Any questions regarding this information should be directed to Boyd Shingleton, Regulatory Affairs, at (864) 873-4716.
I certify that I am a duly authorized officer of Duke Energy Carolinas, LLC, and that the information contained herein accurately represents changes made to Chapter 16 of the UFSAR since the previous submittal. I declare under penalty of perjury that the foregoing is true and correct. Executed on June 23, 2015.
Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachment www.duke-energy.com
4.
U. S. Nuclear Regulatory Commission June 23, 2015 Page 2 cc: Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (ONS)
(By electronic mail only)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852-2746 Mr. Jeffrey A. Whited, Project Manager (ONS)
(By electronic mail only)
U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 11555 Rockville Pike Mail Stop O-8B1A Rockville, MD 20852 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Station
DUKE Oconee ENERGY 780(
Se June 23, 2015 Re:
Oconee Nuclear Station Selected Licensee Commitments (SLC) Manual Change Revision Dates: 05/21/15 Please replace the corresponding pages in your copy of the Oconee SLC Manual as follows:
Nuclear Station Duke Energy 0 Rochester Hwy neca, SC 29672 REMOVE THESE PAGES INSERT THESE PAGES List of Effective Pages (LOEP) 1-13 List of Effective Pages (LOEP) 1-13 TOC 16.0-1 thru 7 TOC 16.0-1 thru 7 SLC Pages 16.8.5-1 thru 3 If you have any questions concerning the contents Boyd Shingleton at (864) 873-4716.
OZis Wasik Regulatory Affairs Manager SLC Pages 16.8.5-1 of this SLC Manual update, contact www.duke-energy.com
Attachment Oconee Nuclear Station Revised Selected Licensee Commitments Manual Pages
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Page Revision Date LOEP 1 05/21/15 LOEP 2 02/10/14 LOEP 3 04/21/14 LOEP 4 04/08/14 LOEP 5 05/21/15 LOEP 6 12/01/14 LOEP 7 01/30/15 LOEP 8 10/15/14 LOEP 9 07/15/14 LOEP 10 11/14/13 LOEP 11 06/30/14 LOEP 12 10/06/14 LOEP 13 05/01/14 16.0-1 02/10/14 16.0-2 02/10/14 16.0-3 02/10/14 16.0-4 02/10/14 16.0-5 02/10/14 16.0-6 02/10/14 16.1-1 10/15/07 16.2-1 08/25/14 16.2-2 08/25/14 16.2-3 08/25/14 16.3-1 3/27/99 16.5.1-1 11/26/12 16.5.1-2 11/26/12 16.5.1-3 11/26/12 16.5.2-1 11/15/12 16.5.2-2 11/15/12 16.5.2-3 11/15/12 16.5.2-4 Delete 5/11/99 16.5.2-5 Delete 5/11/99 16.5.3-1 02/21/07 16.5.3-2 02/21/07 16.5.3-3 02/21/07 16.5.4-1 11/15/12 16.5.4-2 11/15/12 16.5.5-1 Delete 5/16/09 16.5.5-2 Delete 5/16/09 16.5.5-3 Delete 5/16/09 16.5.5-4 Delete 5/16/09 LOEP 1
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Page Revision Date 16.5.5-5 Delete 5/16/09 16.5.6-1 Delete 02/10/14 16.5.6-2 Delete 02/10/14 16.5.7-1 12/13/06 16.5.7-2 12/13/06 16.5.7-3 12/13/06 16.5.7-4 12/13/06 16.5.7-5 12/13/06 16.5.7-6 12/13/06 16.5.8-1 01/31/07 16.5.8-2 01/31/07 16.5.8-3 01/31/07 16.5.8-4 01/31/07 16.5.8-5 01/31/07 16.5.8a-1 5/19/05 16.5.8a-2 5/19/05 (Delete) 16.5.8a-3 5/19/05 (Delete) 16.5.9-1 11/15/12 16.5.9-2 11/15/12 16.5.10-1 10/8/03 16.5.10-2 10/8/03 16.5.11-1 1/31/00 16.5.12-1 3/27/99 16.5.13-1 3/27/99 16.5.13-2 12/01/99 16.5.13-3 12/01/99 16.6.1-1 07/23/12 16.6.1-2 07/23/12 16.6.1-3 07/23/12 16.6.1-4 07/23/12 16.6.1-5 Delete 16.6.2-1 01/31/07 16.6.2-2 01/31/07 16.6.2-3 01/31/07 16.6.2-4 01/31/07 16.6.2-5 01/31/07 16.6.2-6 01/31/07 16.6.2-7 01/31/07 16.6.2-8 Delete 16.6.2-9 Delete 16.6.2-10 Delete LOEP 2
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.6.2-11 Delete 16.6.2-12 Delete 16.6.3-1 11/15/12 16.6.4-1 11/15/12 16.6.4-2 11/15/12 16.6.4-3 11/15/12 16.6.4-4 11/15/12 16.6.4-5 11/15/12 16.6.4-6 11/15/12 16.6.5-1 12/14/00 16.6.6-1 11/15/12 16.6.7-1 3/27/99 16.6.8-1 3/27/99 16.6.9-1 11/15/12 16.6.9-2 11/15/12 16.6.10-1 11/15/12 16.6.10-2 11/15/12 16.6.10-3 11/15/12 16.6.11-1 11/15/12 16.6.11-2 11/15/12 16.6.12-1 11/15/12 16.6.12-2 11/15/12 16.6.12-3 11/15/12 16.6.12-4 5/17/05 (Delete) 16.6.12-5 Delete 16.6.12-6 Delete 16.6.12-7 Delete 16.6.13-1 03/31/08 16.6.13-2 03/31/08 16.6.13-3 03/31/08 16.6.14-1 04/21/14 16.6.14-2 04/21/14 16.6.14-3 04/21/14 16.6.14-4 04/21/14 16.6.15-1 11/15/12 16.6.15-2 11/15/12 16.7.1-1 11/15/12 16.7.1-2 11/15/12 16.7.2-1 11/15/12 16.7.2-2 11/15/12 16.7.2-3 11/15/12 LOEP 3
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.7.3-1 11/15/12 16.7.3-2 11/15/12 16.7.4-1 7/14/05 16.7.4-2 7/14/05 16.7.4-3 7/14/05 16.7.5-1 11/15/12 16.7.5-2 11/15/12 16.7.5-3 11/15/12 16.7.5-4 11/15/12 16.7.6-1 04/08/14 16.7.6-2 04/08/14 16.7.6-3 04/08/14 16.7.6-4 04/08/14 16.7.7-1 11/15/12 16.7.7-2 11/15/12 16.7.8-1 3/27/99 16.7.8-2 3/27/99 16.7.9-1 10/23/03 16.7.10-1 11/15/12 16.7.10-2 11/15/12 16.7.11-1 11/15/12 16.7.11-2 11/15/12 16.7.11-3 11/15/12 16.7.12-1 6/30/04 16.7.12-2 6/30/04 16.7.13-1 12/05/12 16.7.13-2 12/05/12 16.7.13-3 12/05/12 16.7.14-1 11/15/12 16.7.14-2 11/15/12 16.7.14-3 11/15/12 16.7.14-4 11/15/12 16.7.15-1 04/08/14 16.7.15-2 04/08/14 16.7.15-3 04/08/14 16.8.1-1 8/09/01 16.8.1-2 8/09/01 16.8.2-1 2/10/05 16.8.2-2 2/10/05 LOEP 4
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.8.3-1 10/20/09 16.8.3-2 10/20/09 16.8.3-3 10/20/09 16.8.3-4 10/20/09 16.8.3-5 10/20/09 16.8.3-6 10/20/09 16.8.3-7 10/20/09 16.8.4-1 2/10/05 16.8.4-2 2/10/05 16.8.4-3 2/10/05 16.8.4-4 2/10/05 16.8.4-5 Delete 2/10/05 16.8.4-6 Delete 2/10/05 16.8.4-7 Delete 2/10/05 16.8.4-8 Delete 2/10/05 16.8.4-9 Delete 9/25/04 16.8.5-1 05/21/15 16.8.5-2 Delete 5/21/15 16.8.5-3 Delete 5/21/15 16.8.5-4 Delete 12/21/04 16.8.5-5 Delete 12/21/04 16.8.6-1 01/04/07 16.8.6-2 01/04/07 16.8.6-3 01/04/07 16.8.7-1 1/31/00 16.8.8-1 1/31/00 16.8.9-1 6/21/05 16.8.9-2 6/21/05 16.8.9-3 6/21/05 16.8.9-4 6/21/05 16.9.1-1 12/05/12 16.9.1-2 12/05/12 16.9.1-3 12/05/12 16.9.1-4 12/05/12 16.9.1-5 12/05/12 16.9.1-6 12/05/12 16.9.2-1 12/31/12 16.9.2-2 12/31/12 16.9.2-3 12/31/12 16.9.2-4 12/31/12 16.9.2-5 12/31/12 LOEP 5
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Page Revision Date 16.9.2-6 12/31/12 16.9.3-1 12/31/12 16.9.3-2 12/31/12 16.9.4-1 12/01/14 16.9.4-2 12/01/14 16.9.4-3 12/01/14 16.9.4-4 12/01/14 16.9.4-5 12/01/14 16.9.4-6 12/01/14 16.9.4-7 12/01/14 16.9.4-8 12/01/14 16.9.4-9 12/01/14 16.9.5-1 12/31/12 16.9.5-2 12/31/12 16.9.5-3 12/31/12 16.9.5-4 12/31/12 16.9.5-5 12/31/12 16.9.6-1 09/19/14 16.9.6-2 09/19/14 16.9.6-3 09/19/14 16.9.6-4 09/19/14 16.9.6-5 09/19/14 16.9.6-6 09/19/14 16.9.6-7 09/19/14 16.9.6-8 09/19/14 16.9.6-9 09/19/14 16.9.6-10 09/19/14 16.9.6-11 09/19/14 16.9.7-1 07/23/12 16.9.7-2 07/23/12 16.9.7-3 07/23/12 16.9.7-4 07/23/12 16.9.7-5 07/23/12 16.9.7-6 07/23/12 16.9.7-7 07/23/12 16.9.7-8 07/23/12 16.9.7-9 Delete 16.9.8-1 2/15/06 16.9.8-2 2/15/06 16.9.8-3 Delete 2/15/06 16.9.8-4 Delete LOEP 6
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Pa e Revision Date 16.9.8-5 Delete 16.9.8-6 Delete 16.9.8-7 Delete 16.9.8a-1 02/07/05 16.9.8a-2 02/07/05 16.9.8a-3 02/07/05 16.9.9-1 01/30/15 16.9.9-2 01/30/15 16.9.9-3 01/30/15 16.9.9-4 01/30/15 16.9.9-5 01/30/15 16.9.9-6 01/30/15 16.9.9-7 01/30/15 16.9.9-8 01/30/15 16.9.9-9 01/30/15 16.9.9-10 01/30/15 16.9.9-11 01/30/15 16.9.9-12 01/30/15 16.9.9-13 01/30/15 16.9.9-14 01/30/15 16.9.9a-1 01/30/15 16.9.9a-2 01/30/15 16.9.9a-4 01/30/15 16.9.9a-5 01/30/15 16.9.9a-6 01/30/15 16.9.9a-7 01/30/15 16.9.9a-8 01/30/15 16.9.9a-9 01/30/15 16.9.10-1 01/12/04 16.9.10-2 01/12/04 16.9.11-1 11/15/12 16.9.11-2 11/15/12 16.9.11-3 11/15/12 16.9.11-4 11/15/12 16.9.11-5 11/15/12 16.9.11-6 11/15/12 16.9.11-7 11/15/12 16.9.11-8 11/15/12 16.9.11a-1 10/20/14 16.9.1 la-2 10/20/14 16.9.1 la-3 10/20/14 LOEP 7
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.9.11 a-4 10/20/14 16.9.11a-5 10/20/14 16.9.11a-6 10/20/14 16.9.11 a-7 10/20/14 16.9.11a-8 10/20/14 16.9.11a-9 10/20/14 16.9.11 a-10 10/20/14 16.9.11a-11 10/20/14 16.9.11 a-1 2 10/20/14 16.9.11 a-13 10/20/14 16.9.11 a-14 10/20/14 16.9.11 a-15 10/20/14 16.9.11 a-16 Deleted 3/10/08 16.9.12-1 12/01/13 16.9.12-2 12/01/13 16.9.12-3 12/01/13 16.9.12-4 12/01/13 16.9.12-5 12/01/13 16.9.12-6 12/01/13 16.9.12-7 12/01/13 16.9.12-8 12/01/13 16.9.12-9 12/01/13 16.9.12-10 12/01/13 16.9.12-11 12/01/13 16.9.12-12 12/01/13 16.9.12-13 12/01/13 16.9.12-14 12/01/13 16.9.12-15 12/01/13 16.9.12-16 12/01/13 16.9.12-17 12/01/13 16.9.12-18 12/01/13 16.9.12-19 Deleted 12/01/13 16.9.12-20 Deleted 12/01/13 16.9.12-21 Deleted 12/01/13 16.9.12-22 Deleted 12/01/13 16.9.13-1 01/31/07 16.9.13-2 01/31/07 16.9.13-3 01/31/07 16.9.13-4 01/31/07 16.9.14-1 10/28/04 16.9.14-2 10/28/04 LOEP 8
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Page Revision Date 16.9.15-1 3/27/99 16.9.15-2 3/27/99 16.9.15-3 3/27/99 16.9.16-1 10/15/14 16.9.16-2 10/15/14 16.9.16-3 10/15/14 16.9.17-1 5/23/01 16.9.17-2 3/27/99 16.9.18-1 07/15/14 16.9.18-2 07/15/14 16.9.18-3 07/15/14 16.9.18-4 07/15/14 16.9.18-5 07/15/14 16.9.18-6 07/15/14 16.9.18-7 07/15/14 16.9.18-8 07/15/14 16.9.18-9 Deleted 07/15/14 16.9.18-10 Deleted 07/15/14 16.9.18-11 Deleted 07/15/14 16.9.18-12 Deleted 07/15/14 16.9.18-14 Deleted 07/15/14 16.9.18-15 Deleted 07/15/14 16.9.18-16 Deleted 07/15/14 16.9.19-1 3/31/05 16.9.19-2 3/31/05 16.9.20-1 05/28/14 16.9.20-2 05/28/14 16.9.20-3 05/28/14 16.9.20-4 05/28/14 16.9.20-5 05/28/14 16.9.21-1 07/09/09 16.9.21-2 07/09/09 16.9.21-3 07/09/09 16.9.21-4 07/09/09 16.9.22-1 06/13/14 16.9.22-2 06/13/14 16.9.22-3 06/13/14 16.9.22-4 06/13/14 16.10.1-1 11/15/12 16.10.1-2 11/15/12 16.10.1-3 Deleted 9/18/03 LOEP 9
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.10.2-1 12/2/03 16.10.2-2 12/2/03 16.10.3-1 3/27/99 16.10.3-2 3/27/99 16.10.4-1 11/15/12 16.10.5-1 Deleted 8/24/04 16.10.6-1 3/27/99 16.10.7-1 4/29/99 16.10.7-2 4/29/99 16.10.7-3 1/31/00 16.10.7-4 4/29/99 16.10.7-5 4/29/99 16.10.7-6 4/29/99 16.10.7-7 4/29/99 16.10.7-8 4/29/99 16.10.7-9 4/29/99 16.10.8-1 11/27/06 16.10.8-2 11/27/06 16.10.8-3 11/27/06 16.10.8-4 11/27/06 16.10.8-5 11/27/06 16.10.9-1 11/25/09 16.10.9-2 11/25/09 16.10.9-3 11/25/09 16.10.9-4 11/25/09 16.10.9-5 11/25/09 16.11.1-1 3/15/11 16.11.1-2 3/15/11 16.11.1-3 3/15/11 16.11.1-4 3/15/11 16.11.1-5 3/15/11 16.11.1-6 3/15/11 16.11.1-7 3/15/11 16.11.2-1 1/31/00 16.11.2-2 3/27/99 16.11.2-3 1/31/00 16.11.2-4 3/27/99 16.11.2-5 1/31/00 16.11.2-6 1/31/00 16.11.3-1 11/20/08 16.11.3-2 11/20/08 LOEP 10
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.11.3-3 11/20/08 16.11.3-4 11/20/08 16.11.3-5 11/20/08 16.11.3-6 11/20/08 16.11.3-7 11/20/08 16.11.3-8 11/20/08 16.11.3-9 11/20/08 16.11.3-10 11/20/08 16.11.3-11 11/20/08 16.11.3-12 11/20/08 16.11.3-13 11/20/08 16.11.3-14 11/20/08 16.11.3-15 11/20/08 16.11.3-16 11/20/08 16.11.3-17 11/20/08 16.11.3-18 11/20/08 16.11.3-19 11/10/04 (Deleted) 16.11.4-1 06/30/14 16.11.4-2 06/30/14 16.11.4-3 06/30/14 16.11.4-4 06/30/14 16.11.4-5 06/30/14 16.11.4-6 06/30/14 16.11.4-7 06/30/14 16.11.4-8 11/10/04 (Delete) 16.11.5-1 10/30/02 16.11.5-2 10/30/02 16.11.5-3 10/30/02 16.11.5-4 10/30/02 16.11.6-1 11/08/13 16.11.6-2 11/08/13 16.11.6-3 11/08/13 16.11.6-4 11/08/13 16.11.6-5 11/08/13 16.11.6-6 11/08/13 16.11.6-7 11/08/13 16.11.6-8 11/08/13 16.11.6-9 11/08/13 16.11.6-10 11/08/13 16.11.7-1 1/31/00 LOEP 11
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.11.7-2 1/31/00 16.11.7-3 3/27/99 16.11.7-4 1/31/00 16.11.8-1 12/21/09 16.11.8-2 12/21/09 16.11.9-1 03/22/10 16.11.9-2 03/22/10 16.11.9-3 03/22/10 16.11.10-1 05/14/14 16.11.10-2 05/14/14 16.11.11-1 3/27/99 16.11.12-1 4/10/03 16.11.12-2 4/10/03 16.11.13-1 3/27/99 16.11.13-2 3/27/99 16.11.14-1 3/27/99 16.11.14-2 3/27/99 16.12.1-1 3/27/99 16.12.2-1 5/3/07 16.12.2-2 5/3/07 16.12.3-1 5/1/03 16.12.3-2 5/1/03 16.12.4-1 3/27/99 16.12.5-1 3/27/99 16.12.6-1 11/08/07 16.13.1-1 10/06/14 16.13.1-2 10/06/14 16.13.1-3 10/06/14 16.13.1-4 10/06/14 16.13.1-5 10/06/14 16.13.1-6 10/06/14 16.13.1-7 10/06/14 16.13.1-8 10/06/14 16.13.1-9 10/06/14 16.13.1-10 10/06/14 16.13.2-1 12/15/04 16.13.2-2 Delete 12/15/04 16.13.2-3 Delete 12/15/04 16.13.2-4 Delete 12/15/04 16.13.3-1 12/15/04 16.13.3-2 Delete 12/15/04 LOEP 12
Oconee Nuclear Station Selected Licensee Commitments Revised 05/21/15 List of Effective Pages Paqe Revision Date 16.13.4-1 3/27/99 16.13.5-1 Delete 16.13.5-2 Delete 16.13.6-1 3/27/99 16.13.7-1 12/15/04 16.13.7-2 12/15/04 16.13.8-1 3/27/99 16.13.9-1 3/27/99 16.13.9-2 3/27/99 16.13.10-1 3/27/99 16.13.11-1 3/27/99 16.14.1-1 11/15/12 16.14.2-1 07/23/12 16.14.2-2 07/23/12 16.14.3-1 3/27/99 16.14.4-1 Deleted 3/15/11 16.14.4.a-1 3/15/11 16.15.1-1 4/12/06 16.15.1-2 Deleted 4/12/06 16.15.1-3 Deleted 4/12/06 16.15.1-4 Deleted 4/12/06 16.15.1-5 Deleted 4/12/06 16.15.2-1 11/15/12 16.15.2-2 11/15/12 16.15.2-3 11/15/12 16.15.2-4 11/15/12 16.15.2-5 11/15/12 16.15.3-1 11/15/12 16.15.3-2 11/15/12 16.15.3-3 11/15/12 16.15.3-4 11/15/12 16.15.3-5 11/15/12 LOEP 13
SECTION NO 16.0 16.1 16.2 16.3 16.4 16.5 16.5.1 16.5.2 16.5.3 16.5.4 16.5.5 16.5.6 16.5.7 16.5.8 16.5.8a 16.5.9 16.5.10 16.5.11 16.5.12 16.5.13 16.6 16.6.1 16.6.2 16.6.3 TABLE OF CONTENTS TITLE SELECTED LICENSEE COMMITMENTS INTRODUCTION APPLICABILITY DEFINITIONS COMMITMENTS RELATED TO REACTOR COMPONENTS REACTOR COOLANT SYSTEM Reactor Coolant System Vents Low Temperature Overpressure Protection (LTOP) System Loss of Decay Heat Removal Reactor Coolant System (RCS) Boron Sampling
[DELETED]
[DELETED]
Chemistry Requirements Pressurizer
[DELETED]
Testing Following Opening of System (Core Barrel Bolt Inspections)
Loss of Reactor Coolant Subcriticality RCS Leakage Testing Following Opening of System High Pressure Injection and the Chemical Addition Systems COMMITMENTS RELATED TO ENGINEERED SAFETY FEATURES (NON-ESF SYSTEMS)
Containment Leakage Tests Reactor Building Post-Tensioning System Containment Heat Removal Verification Frequency PAGE 16.1-1 16.1-1 16.2-1 16.3-1 Pending 16.5.1-1 16.5.1-1 16.5.2.1 16.5.3-1 16.5.4-1 16.5.5-1 16.5.6-1 16.5.7-1 16.5.8-1 16.5.8a-1 16.5.9.1 16.5.10-1 16.5.11-1 16.5.12-1 16.5.13-1 16.6.1-1 16.6.1-1 16.6.2-1 16.6.3-1 16.0-1 05/21/15 I
SECTION NO 16.6.4 16.6.5 16.6.6 16.6.7 16.6.8 16.6.9 16.6.10 16.6.11 16.6.12 16.6.13 16.6.14 16.6.15 16.7 16.7.1 16.7.2 16.7.3 16.7.4 16.7.5 16.7.6 16.7.7 16.7.8 16.7.9 16.7.10 16.7.11 TABLE OF CONTENTS (continued)
TITLE Low Pressure Injection System Leakage Core Flood Tank Discharge Valve Breakers Core Flooding System Test BWST Outlet Valve Control LPI System Valve Test Restrictions Containment Purge Valve Testing Trisodium Phosphate (TSP)
Containment Debris Sources Additional High Pressure Injection (HPI) Requirements Additional Requirements to Support Low Pressure Injection (LPI)
Operability Control of HPI and LPI/RBS Pump Room Temperatures High Pressure Injection (HPI) and Liquid Waste Disposal (LWD)
Leakage INSTRUMENTATION Accident Monitoring Instrumentation Anticipated Transient Without Scram Emergency Feedwater System Hydrogen Analyzers Steam Generator Overfill Protection Diverse Actuation Systems Position Indicator Channels Incore Instrumentation RCP Monitor Core Flood Tank Instrumentation Display Instrumentation PAGE 16.6.4-1 16.6.5-1 16.6.6-1 16.6.7-1 16.6.8-1 16.6.9-1 16.6.10-1 16.6.11-1 16.6.12-1 16.6.13-1 16.6.14-1 16.6.15-1 16.7.1-1 16.7.1-1 16.7.2-1 16.7.3-1 16.7.4-1 16.7.5-1 16.7.6-1 16.7.7-1 16.7.8-1 16.7.9-1 16.7.10-1 16.7.11-1 16.0-2 05/21/15 I
SECTION NO 16.7.12 16.7.13 16.7.14 16.7.15 16.8 16.8.1 16.8.2 16.8.3 16.8.4 16.8.5 16.8.6 16.8.7 16.8.8 16.8.9 16.9 16.9.1 16.9.2 16.9.3 16.9.4 16.9.5 16.9.6 16.9.7 16.9.8 16.9.8a TABLE OF CONTENTS (continued)
TITLE SSF Diesel Generator (DG) Air Start System Pressure Instrumentation SSF Instrumentation Rod Withdrawal Alarm Limit Engineered Safeguards Protective System (ESPS) Voter Trouble Alarm ELECTRIC POWER SYSTEMS Control of Room Temperatures for Station Blackout Additional Requirements to Support Keowee Hydro Unit (KHU)
OPERABILITY Power Battery Parameters Keowee Operational Restrictions
[DELETED]
Lee/Central Alternate Power System Auctioneering Diodes External Grid Trouble Protection Keowee Governor Speed Out Of Tolerance (OOT) Alarm AUXILIARY SYSTEMS Fire Suppression Water System Sprinkler and Spray Systems Keowee CO2 Systems Fire Hose Stations Fire Barriers Fire Detection Instrumentation Keowee Lake Level Control Room Ventilation System (CRVS) Booster Fans HPSW System Requirements to Support Loss of LPSW PAGE 16.7.12-1 16.7.13-1 16.7.14-1 16.7.15-1 16.8.1-1 16.8.1-1 16.8.2-1 16.8.3-1 16.8.4-1 16.8.5-1 16.8.6-1 16.8.7-1 16.8.8-1 16.8.9-1 16.9.1-1 16.9.1-1 16.9.2-1 16.9.3-1 16.9.4-1 16.9.5-1 16.9.6-1 16.9.7-1 16.9.8-1 16.9.8a-1 16.0-3 05/21/15 1
TABLE OF CONTENTS (continued)
SECTION NO TITLE PAGE 16.9.9 Protected Service Water (PSW) System 16.9.9a Protected Service Water (PSW) Battery Cell Parameters 16.9.10 Component Cooling and HPI Seal Injection to Reactor Coolant Pumps 16.9.11 Turbine Building Flood Protection Measures 16.9.1 la Auxiliary Building Flood Protection Measures 16.9.12 Additional Low Pressure Service Water (LPSW) And Siphon Seal Water (SSW) System Operability Requirements 16.9.13 Spent Fuel Cooling System 16.9.14 SSF Diesel Generator (DG) Inspection Requirements 16.9.15 Radioactive Material Sources 16.9.16 Reactor Building Polar Crane and Auxiliary Hoist (RCS System Open) 16.9.17 Reactor Building Polar Crane (RCS at elevated temperature and pressure) 16.9.18 Snubbers 16.9.19 Gravity Induced Reverse Flow to Standby Shutdown Facility (SSF)
Through a Unit 2 Condensate Cooler 16.9.20 Diesel Driven Service Air Compressors 16.9.21 Standby Shutdown Facility External Flood Protection 16.9.22 Protected Service Water System Unavailability 16.10 COMMITMENTS RELATED TO STEAM & POWER CONVERSION SYSTEMS 16.10.1 Local Start of Turbine Driven Emergency Feedwater (EFW) Pump 16.10.2 Steam Generator Secondary Side Pressure and Temperature (P/T) Limits 16.10.3 Emergency Feedwater (EFW) Pump and Valve Testing 16.10.4 Low Presssure Service Water System Testing 16.9.9-1 16.9.9a-1 16.9.10-1 16.9.11-1 16.9.11 a-1 16.9.12-1 16.9.13-1 16.9.14-1 16.9.15-1 16.9.16-1 16.9.17-1 16.9.18-1 16.9.19-1 16.9.20-1 16.9.21-1 16.9.22-1 16.10.1-1 16.10.1-1 16.10.2-1 16.10.3-1 16.10.4-1 05/21/15 I 16.0-4
TABLE OF CONTENTS (continued)
SECTION NO TITLE 16.10.5
[DELETED]
16.10.6 Emergency Feedwater Controls 16.10.7 Alternate Source of Emergency Feedwater (EFW) 16.10.8 Upper Surge Tank (UST) Riser Branch Line Automatic Isolation Valves 16.10.9 Air Operated Valves (AOVs) Required to Support Standby Shutdown Facility (SSF) During Station Blackout (SBO) 16.11 RADIOLOGICAL EFFLUENTS CONTROL 16.11.1 Radioactive Liquid effluents 16.11.2 Radioactive Gaseous Effluents 16.11.3 Radioactive Effluent Monitoring Instrumentation 16.11.4 Operational Safety Review 16.11.5 Solid Radioactive Waste 16.11.6 Radiological Environmental Monitoring 16.11.7 Dose calculations 16.11.8 Reports 16.11.9 Radioactive effluent release report 16.11.10 Radiological Environmental Operating Reports 16.11.11 Iodine Radiation Monitoring Filters 16.11.12 Radioactive Material in Outside Temporary Tanks Exceeding Limit 16.11.13 Radioactive Material in Waste Gas Holdup Tank Exceeding Limit 16.11.14 Explosive Gas Mixture 16.12 REFUELING OPERATIONS 16.12.1 Decay Time for Movement of Irradiated Fuel PAGE 16.10.5-1 16.10.6-1 16.10.7-1 16.10.8-1 16.10.9-1 16.11.1-1 16.11.1-1 16.11.2-1 16.11.3-1 16.11.4-1 16.11.5-1 16.11.6-1 16.11.7-1 16.11.8-1 16.11.9-1 16.11.10-1 16.11.11-1 16.11.12-1 16.11.13-1 16.11.14-1 16.12.1-1 16.12.1-1 16.0-5 05/21/15 I
TABLE OF CONTENTS (continued)
SECTION NO 16.12.2 16.12.3 16.12.4 16.12.5 16.12.6 16.13 16.13.1 16.13.2 16.13.3 16.13.4 16.13.5 16.13.6 16.13.7 16.13.8 16.13.9 16.13.10 16.13.11 16.14 16.14.1 16.14.2 16.14.3 16.14.4 16.14.4.a TITLE PAGE Area Radiation Monitoring for Fuel Loading and Refueling Communication Between Control Room and Refueling Personnel Handling of Irradiated Fuel Assemblies Loads Suspended over Spent Fuel in Spent Fuel Pool Fuel Damage During Fuel Handling Operations in Containment CONDUCT OF OPERATION Minimum Station Staffing Requirements
[DELETED]
[DELETED]
Reactivity Anomaly Deleted Retraining and Replacement of Station Personnel Procedures for Control of Ph in Recirculated Coolant after Loss-of-coolant Accident & Long-term Emergency Core Cooling Systems Respiratory Protective Program Startup Report Core Operating Limits Reports Procedure for Station Survey Following an Earthquake CONTROL RODS AND POWER DISTRIBUTION APSR Movement Control Rod Program Verification Power Mapping
[DELETED]
Engineering Work Station 16.12.2-1 16.12.3-1 16.12.4-1 16.12.5-1 16.12.6-1 16.13.1-1 16.13.1-1 16.13.2-1 16.13.3-1 16.13.4-1 16.13.5-1 16.13.6-1 16.13.7-1 16.13.8-1 16.13.9-1 16.13.10-1 16.13.11-1 16.14.1-1 16.14.1-1 16.14.2-1 16.14.3-1 16.14.4-1 16.14.4.a-1 16.0-6 05/21/15 1
TABLE OF CONTENTS (continued)
SECTION TITLE NO 16.15 VENTILATION FILTER TESTING PROGRAM 16.15.1
[DELETED]
16.15.2 Control Room Pressurization and Filtering System 16.15.3 Spent Fuel Pool Ventilation System PAGE 16.15.1-1 16.15.1-1 16.15.2-1 16.15.3-1 16.0-7 05/21/15 1
DELETED 16.8.5 16.8 ELECTRIC POWER SYSTEM 16.8.5---DELETED---
16.8.5-1 052115 1