ML23080A067

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program
ML23080A067
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/21/2023
From: Sujata Goetz
NRC/NRR/DORL/LPL1
To: Para W
Constellation Energy Corp
References
L-2023-LLA-0023
Download: ML23080A067 (4)


Text

From:

Sujata Goetz Sent:

Tuesday, March 21, 2023 8:47 AM To:

Para, Wendi:(Constellation Nuclear)

Subject:

Acceptance Review for Calvert Cliffs Unit 1 -LAR to Modify the Long-Term Coupon Surveillance Program (EPID L-2023-LLA-0023)

Dear Ms. Para By letter dated February 21, 2023 (Agencywide Document and Access Management System (ADAMS) Accession No. ML23052A063, Constellation Energy Generation, submitted a license amendment request for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. The proposed amendment revises the Calvert Cliffs, Unit 1 licensing basis by modifying the Long-Term Coupon Surveillance Program previously approved by the NRC for the carborundum samples located in, Unit 1 spent fuel pool.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take 265 hours0.00307 days <br />0.0736 hours <br />4.381614e-4 weeks <br />1.008325e-4 months <br /> to complete. The NRC staff expects to complete this review in 12 months from the date of this letter, which would be March 21, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Sujata Goetz Project Manager, Calvert Cliffs

Nuclear Regulatory Commission 11555 Rockville Pike Office of the Nuclear Reactor Regulation NRC/NRR/DORL/LPL1 Office O8F2 Mailroom O8-B1A Rockville, MD 20852-2738 Washington, DC 20555-0001 (o) 301.415.8004 (f) 301.415.3313

Hearing Identifier:

NRR_DRMA Email Number:

2009 Mail Envelope Properties (MN2PR09MB546738DE1D39E687573F13D880819)

Subject:

Acceptance Review for Calvert Cliffs Unit 1 -LAR to Modify the Long-Term Coupon Surveillance Program (EPID L-2023-LLA-0023)

Sent Date:

3/21/2023 8:46:38 AM Received Date:

3/21/2023 8:46:00 AM From:

Sujata Goetz Created By:

Sujata.Goetz@nrc.gov Recipients:

"Para, Wendi:(Constellation Nuclear)" <wendi.para@constellation.com>

Tracking Status: None Post Office:

MN2PR09MB5467.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3159 3/21/2023 8:46:00 AM image001.png 455 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: