Issuance of Amendments to Revise Reactor Coolant Leakage Requirements
ML21347A038
Person / Time
Site: Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle  Constellation icon.png
Issue date: 01/13/2022
From: Blake Purnell
Plant Licensing Branch III
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
Purnell B
References
EPID L-2021-LLA-0121
Download: ML21347A038 (126)


Text

January 13, 2022 Mr. David P. Rhoades Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2; CLINTON POWER STATION, UNIT NO. 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; JAMES A. FITZPATRICK NUCLEAR POWER PLANT; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; NINE MILE POINT NUCLEAR STATION, UNIT 2; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; AND R. E. GINNA NUCLEAR POWER PLANT - ISSUANCE OF AMENDMENTS TO REVISE REACTOR COOLANT LEAKAGE REQUIREMENTS (EPID L-2021-LLA-0121)

Dear Mr. Rhoades:

The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the following enclosed amendments in response to the Exelon Generation Company, LLC (Exelon, the licensee) application dated June 30, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21181A180), as supplemented by letter dated January 4, 2022 (ADAMS Accession No. ML22004A341):

1.

Amendment No. 223 to Renewed Facility Operating License No. NPF-72 and Amendment No. 223 to Renewed Facility Operating License No. NPF-77 for Braidwood Station, Units 1 and 2, respectively; 2.

Amendment No. 225 to Renewed Facility Operating License No. NPF-37 and Amendment No. 225 to Renewed Facility Operating License No. NPF-66 for Byron Station, Unit Nos. 1 and 2, respectively; 3.

Amendment No. 341 to Renewed Facility Operating License No. DPR-53 and Amendment No. 319 to Renewed Facility Operating License No. DPR-69 for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, respectively; 4.

Amendment No. 242 to Facility Operating License No. NPF-62 for Clinton Power Station, Unit No. 1; 5.

Amendment No. 276 to Renewed Facility Operating License No. DPR-19 and Amendment No. 269 to Renewed Facility Operating License No. DPR-25 for Dresden Nuclear Power Station, Units 2 and 3, respectively; 6.

Amendment No. 346 to Renewed Facility Operating License No. DPR-59 for James A.

FitzPatrick Nuclear Power Plant;

7.

Amendment No. 253 to Renewed Facility Operating License No. NPF-11 and Amendment No. 239 to Renewed Facility Operating License No. NPF-18 for LaSalle County Station, Units 1 and 2, respectively;

8.

Amendment No. 254 to Renewed Facility Operating License No. NPF-39 and Amendment No. 216 to Renewed Facility Operating License No. NPF-85 for Limerick Generating Station, Units 1 and 2, respectively;

9.

Amendment No. 188 to Renewed Facility Operating License No. NPF-69 for Nine Mile Point Nuclear Station, Unit 2;

10.

Amendment No. 339 to Subsequent Renewed Facility Operating License No. DPR-44 and Amendment No. 342 to Subsequent Renewed Facility Operating License No. DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3, respectively;

11.

Amendment No. 288 to Renewed Facility Operating License No. DPR-29 and Amendment No. 284 to Renewed Facility Operating License No. DPR-30 for Quad Cities Nuclear Power Station, Units 1 and 2, respectively; and

12.

Amendment No. 146 to Renewed Facility Operating License No. DPR-18 for R. E. Ginna Nuclear Power Plant.

The amendments revise the reactor coolant leakage requirements in the technical specifications for each facility based on Technical Specifications Task Force (TSTF) Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements, (ADAMS Accession No. ML20016A233).

A copy of the NRC staffs Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commissions Federal Register notice.

Sincerely,

/RA/

Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-410, 50-277, 50-278, 50-254, 50-265, and 50-244

Enclosures:

1. Amendment No. 223 to NPF-72
2. Amendment No. 223 to NPF-77
3. Amendment No. 225 to NPF-37
4. Amendment No. 225 to NPF-66
5. Amendment No. 341 to DPR-53
6. Amendment No. 319 to DPR-69
7. Amendment No. 242 to NPF-62
8. Amendment No. 276 to DPR-19
9. Amendment No. 269 to DPR-25
10. Amendment No. 346 to DPR-59
11. Amendment No. 253 to NPF-11
12. Amendment No. 239 to NPF-18
13. Amendment No. 254 to NPF-39
14. Amendment No. 216 to NPF-85
15. Amendment No. 188 to NPF-69
16. Amendment No. 339 to DPR-44
17. Amendment No. 342 to DPR-56
18. Amendment No. 288 to DPR-29
19. Amendment No. 284 to DPR-30
20. Amendment No. 146 to DPR-18
21. Safety Evaluation cc: Listserv

EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-456 BRAIDWOOD STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 223 Renewed License No. NPF-72

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-72 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 223 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:40:40 -05'00'

EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 223 Renewed License No. NPF-77

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-77 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 223 and the Environmental Protection Plan contained in Appendix B, both of which are attached to Renewed License No. NPF-72, dated January 27, 2016, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:41:07 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NOS. 223 AND 223 RENEWED FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 BRAIDWOOD STATION, UNITS 1 AND 2 DOCKET NOS. STN 50-456 AND STN 50-457 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-72 License NPF-72 Page 3 Page 3 License NPF-77 License NPF-77 Page 3 Page 3 TSs TSs 1.1-4 1.1-4 3.4.13-1 3.4.13-1 Renewed License No. NPF-72 Amendment No. 223 (2)

Exelon Generation Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 223 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Renewed License No. NPF-77 Amendment No. 223 (2)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 223 and the Environmental Protection Plan contained in Appendix B, both of which are attached to Renewed License No. NPF-72, dated January 27, 2016, are hereby incorporated into the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Definitions 1.1 BRAIDWOOD UNITS 1 & 2 1.1 4 Amendment 223 1.1 Definitions INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f).

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE, such as that from pump seals or valve packing (except Reactor Coolant pump (RCP) seal water injection or leakoff),

that is captured and conducted to collection systems or a sump or collecting tank;

2. LEAKAGE into the containment atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; or
3. Reactor Coolant System (RCS) LEAKAGE through a steam generator to the Secondary System (primary to secondary LEAKAGE);

b.

Unidentified LEAKAGE All LEAKAGE (except RCP seal water injection or leakoff) that is not identified LEAKAGE; and c.

Pressure Boundary LEAKAGE LEAKAGE (except primary to secondary LEAKAGE) through a fault in an RCS component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

MASTER RELAY TEST A MASTER RELAY TEST shall consist of energizing each master relay and verifying the OPERABILITY of each relay. The MASTER RELAY TEST shall include a continuity check of each associated slave relay.

RCS Operational LEAKAGE 3.4.13 BRAIDWOOD UNITS 1 & 2 3.4.13 1 Amendment 223 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 RCS Operational LEAKAGE LCO 3.4.13 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

1 gpm unidentified LEAKAGE; c.

10 gpm identified LEAKAGE; and d.

150 gallons per day primary to secondary LEAKAGE through any one steam generator (SG).

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

RCS operational LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Required Action and associated Completion Time not met.

OR Primary to secondary LEAKAGE not within limit.

C.1 Be in MODE 3.

AND C.2 Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours

EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-454 BYRON STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 225 Renewed License No. NPF-37

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-37 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 225 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:41:31 -05'00'

EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-455 BYRON STATION, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 225 Renewed License No. NPF-66

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-66 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 225, and the Environmental Protection Plan contained in Appendix B, both of which were attached to Renewed License No. NPF-37, dated November 19, 2015, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:41:56 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NOS. 225 AND 225 RENEWED FACILITY OPERATING LICENSE NOS. NPF-37 AND NPF-66 BYRON STATION, UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-454 AND STN 50-455 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-37 License NPF-37 Page 3 Page 3 License NPF-66 License NPF-66 Page 3 Page 3 TSs TSs 1.1-4 1.1-4 3.4.13-1 3.4.13-1 Renewed License No. NPF-37 Amendment No. 225 (2)

Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 225 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Deleted.

(4)

Deleted.

Renewed License No. NPF-66 Amendment No. 225 (2)

Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of 3645 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 225, and the Environmental Protection Plan contained in Appendix B, both of which were attached to Renewed License No. NPF-37, dated November 19, 2015, are hereby incorporated into this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Definitions 1.1 BYRON UNITS 1 & 2 1.1 4 Amendment 225 1.1 Definitions INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f).

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE, such as that from pump seals or valve packing (except Reactor Coolant pump (RCP) seal water injection or leakoff),

that is captured and conducted to collection systems or a sump or collecting tank;

2. LEAKAGE into the containment atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; or
3. Reactor Coolant System (RCS) LEAKAGE through a Steam Generator to the Secondary System (primary to secondary LEAKAGE);

b.

Unidentified LEAKAGE All LEAKAGE (except RCP seal water injection or leakoff) that is not identified LEAKAGE; and c.

Pressure Boundary LEAKAGE LEAKAGE (except primary to secondary LEAKAGE) through a fault in an RCS component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

MASTER RELAY TEST A MASTER RELAY TEST shall consist of energizing each master relay and verifying the OPERABILITY of each relay. The MASTER RELAY TEST shall include a continuity check of each associated slave relay.

RCS Operational LEAKAGE 3.4.13 BYRON UNITS 1 & 2 3.4.13 1 Amendment 225 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 RCS Operational LEAKAGE LCO 3.4.13 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

1 gpm unidentified LEAKAGE; c.

10 gpm identified LEAKAGE; and d.

150 gallons per day primary to secondary LEAKAGE through any one steam generator (SG).

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

RCS operational LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Required Action and associated Completion Time not met.

OR Primary to secondary LEAKAGE not within limit.

C.1 Be in MODE 3.

AND C.2 Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours

CALVERT CLIFFS NUCLEAR POWER PLANT, LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 341 Renewed License No. DPR-53

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-53 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 341, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:42:19 -05'00'

CALVERT CLIFFS NUCLEAR POWER PLANT, LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-318 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 319 Renewed License No. DPR-69

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-69 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L.

Salgado Date: 2022.01.13 09:42:44 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NOS. 341 AND 319 RENEWED FACILITY OPERATING LICENSE NOS. DPR-53 AND DPR-69 CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-53 License DPR-53 Page 3 Page 3 License DPR-69 License DPR-69 Page 3 Page 3 TSs TSs 1.1-4 1.1-4 3.4.13-1 3.4.13-1 3.4.13-2 3.4.13-2 Amendment No. 341 (4)

Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now or hereafter applicable; and is subject to the additional conditions specified and incorporated below:

(1)

Maximum Power Level Exelon Generation is authorized to operate the facility at steady-state reactor core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 341, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.

(a)

For Surveillance Requirements (SRs) that are new, in Amendment 227 to Facility Operating License No. DPR-53, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 227. For SRs that existed prior to Amendment 227, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 227.

(3)

Additional Conditions The Additional Conditions contained in Appendix C as revised through Amendment No. 327 are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Additional Conditions.

(4)

Secondary Water Chemistry Monitoring Program Exelon Generation shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:

Amendment No. 319 (4)

Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now or hereafter applicable; and is subject to the additional conditions specified and incorporated below:

(1)

Maximum Power Level Exelon Generation is authorized to operate the facility at steady-state reactor core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.

(a)

For Surveillance Requirements (SRs) that are new, in Amendment 201 to Facility Operating License No. DPR-69, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 201. For SRs that existed prior to Amendment 201, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 201.

(3)

Less Than Four Pump Operation The licensee shall not operate the reactor at power levels in excess of five (5) percent of rated thermal power with less than four (4) reactor coolant pumps in operation. This condition shall remain in effect until the licensee has submitted safety analyses for less than four pump operation, and approval for such operation has been granted by the Commission by amendment of this license.

(4)

Environmental Monitoring Program If harmful effects or evidence of irreversible damage are detected by the biological monitoring program, hydrological monitoring program, and the

Definitions 1.1 1.1 Definitions CALVERT CLIFFS - UNIT 1 1.1-4 CALVERT CLIFFS - UNIT 2 Amendment No. 341 Amendment No. 319 LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE 1.

LEAKAGE, such as that from pump seals or valve packing (except reactor coolant pump (RCP) seal leakoff), that is captured and conducted to collection systems or a sump or collecting tank; 2.

LEAKAGE into the containment atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; or 3.

Reactor Coolant System (RCS) LEAKAGE through a steam generator to the Secondary System (primary to secondary LEAKAGE),

b.

Unidentified LEAKAGE All LEAKAGE (except RCP seal leakoff) that is not identified LEAKAGE; and c.

Pressure Boundary LEAKAGE LEAKAGE (except primary to secondary LEAKAGE) through a fault in an RCS component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

MODE A MODE shall correspond to any one inclusive combination of core reactivity condition, power level, average reactor coolant temperature, and reactor vessel head closure bolts specified in Table 1.1-1 with fuel in the reactor vessel.

RCS Operational LEAKAGE 3.4.13 CALVERT CLIFFS - UNIT 1 3.4.13-1 CALVERT CLIFFS - UNIT 2 Amendment No. 341 Amendment No. 319 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 RCS Operational LEAKAGE LCO 3.4.13 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

1 gpm unidentified LEAKAGE; c.

10 gpm identified LEAKAGE; and d.

100 gallons per day primary to secondary LEAKAGE through any one steam generator (SG).

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

B.

RCS operational LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours

RCS Operational LEAKAGE 3.4.13 CALVERT CLIFFS - UNIT 1 3.4.13-2 CALVERT CLIFFS - UNIT 2 Amendment No. 341 Amendment No. 319 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Required Action and associated Completion Time not met.

OR Primary to secondary LEAKAGE not within limit.

C.1 Be in MODE 3.

AND C.2 Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.13.1 ----------------- NOTES ----------------

1.

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

2.

Not applicable to primary to secondary LEAKAGE.

Verify RCS Operational LEAKAGE is within limits by performance of RCS water inventory balance.

In accordance with the Surveillance Frequency Control Program

EXELON GENERATION COMPANY, LLC DOCKET NO. 50-461 CLINTON POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 242 License No. NPF-62

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 242, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:43:13 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 242 FACILITY OPERATING LICENSE NO. NPF-62 CLINTON POWER STATION, UNIT NO. 1 DOCKET NO. 50-461 Replace the following pages of the Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-62 License NPF-62 Page 3 Page 3 TSs TSs 1.0-5 1.0-5 3.4-12 3.4-12 3.4-13 3.4-13 (4)

Exelon Generation Company, pursuant to the Act and to 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation; and (7)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3473 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 242, are hereby incorporated into this license.

Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 242

Definitions 1.1 CLINTON 1.0-5 Amendment No. 242 1.1 Definitions (continued)

END OF CYCLE The EOC-RPT SYSTEM RESPONSE TIME shall be that RECIRCULATION PUMP TRIP time interval from initial movement of the (EOC-RPT) SYSTEM RESPONSE associated turbine stop valve or turbine TIME control valve to complete suppression of the electric arc between the fully open contacts of the recirculation pump circuit breaker. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f).

ISOLATION SYSTEM The ISOLATION SYSTEM RESPONSE TIME shall be that RESPONSE TIME time interval from when the monitored parameter exceeds its isolation initiation setpoint at the channel sensor until the isolation valves travel to their required positions. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE into the drywell such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; c.

Total LEAKAGE Sum of the identified and unidentified LEAKAGE; and d.

Pressure Boundary LEAKAGE LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

(continued)

RCS Operational LEAKAGE 3.4.5 CLINTON 3.4-12 Amendment No. 242 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Operational LEAKAGE LCO 3.4.5 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

30 gpm total LEAKAGE averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Total LEAKAGE not within limit.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Unidentified LEAKAGE increase not within limit.

C.1 Verify source of unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)

RCS Operational LEAKAGE 3.4.5 CLINTON 3.4-13 Amendment No. 242 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify RCS unidentified LEAKAGE, total LEAKAGE, and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program

EXELON GENERATION COMPANY, LLC DOCKET NO. 50-237 DRESDEN NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 276 Renewed License No. DPR-19

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-19 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 276, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:43:48 -05'00'

EXELON GENERATION COMPANY, LLC DOCKET NO. 50-249 DRESDEN NUCLEAR POWER STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 269 Renewed License No. DPR-25

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-25 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 269, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:44:21 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NOS. 276 AND 269 RENEWED FACILITY OPERATING LICENSE NOS. DPR-19 AND DPR-25 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-237 AND 50-249 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-19 License DPR-19 Page 3 Page 3 License DPR-25 License DPR-25 Page 4 Page 4 TSs TSs 1.1-5 1.1-5 1.1-6 1.1-6 3.4.4-1 3.4.4-1 3.4.4-2 3.4.4-2 Renewed License No. DPR-19 Amendment No. 276 (2)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear materials as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended; (3)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct special nuclear materials as may be produced by the operation of the facility.

C.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2957 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 276, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3)

Operation in the coastdown mode is permitted to 40% power.

Renewed License No. DPR-25 Amendment No. 269

f.

Surveillance Requirement 4.9.A.10 - Diesel Storage Tank Cleaning (Unit 3 and Unit 2/3 only)

Each of the above Surveillance Requirements shall be successfully demonstrated prior to entering into MODE 2 on the first plant startup following the fourteenth refueling outage (D3R14).

3.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50.59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

A.

Maximum Power Level The licensee is authorized to operate the facility at steady state power levels not in excess of 2957 megawatts (thermal), except that the licensee shall not operate the facility at power levels in excess of five (5) megawatts (thermal), until satisfactory completion of modifications and final testing of the station output transformer, the auto-depressurization interlock, and the feedwater system, as described in the licensees telegrams; dated February 26, 1971, have been verified in writing by the Commission.

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 269, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

C.

Reports The licensee shall make certain reports in accordance with the requirements of the Technical Specifications.

D.

Records The licensee shall keep facility operating records in accordance with the requirements of the Technical Specifications.

E.

Restrictions Operation in the coastdown mode is permitted to 40% power.

Definitions 1.1 Dresden 2 and 3 1.1-5 Amendment No. 276/269 1.1 Definitions DRAIN TIME c.

The penetration flow paths required to be (continued) evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; d.

No additional draining events occur; and e.

Realistic cross-sectional areas and drain rates are used.

A bounding DRAIN TIME may be used in lieu of a calculated value.

INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f).

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE into the drywell, such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; (continued)

Definitions 1.1 Dresden 2 and 3 1.1-6 Amendment No. 276/269 1.1 Definitions LEAKAGE c.

Total LEAKAGE (continued)

Sum of the identified and unidentified LEAKAGE; and d.

Pressure Boundary LEAKAGE LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

LINEAR HEAT GENERATION The LHGR shall be the heat generation rate per RATE (LHGR) unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

LOGIC SYSTEM FUNCTIONAL A LOGIC SYSTEM FUNCTIONAL TEST shall be a test TEST of all logic components required for OPERABILITY of a logic circuit, from as close to the sensor as practicable up to, but not including, the actuated device, to verify OPERABILITY. The LOGIC SYSTEM FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total system steps so that the entire logic system is tested.

MINIMUM CRITICAL POWER The MCPR shall be the smallest critical power RATIO (MCPR) ratio (CPR) that exists in the core for each class of fuel. The CPR is that power in the assembly that is calculated by application of the appropriate correlation(s) to cause some point in the assembly to experience boiling transition, divided by the actual assembly operating power.

MODE A MODE shall correspond to any one inclusive combination of mode switch position, average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.

OPERABLEOPERABILITY A system, subsystem, division, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, (continued)

RCS Operational LEAKAGE 3.4.4 Dresden 2 and 3 3.4.4-1 Amendment No. 276/269 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 RCS Operational LEAKAGE LCO 3.4.4 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

25 gpm total LEAKAGE averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Total LEAKAGE not within limit.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

RCS Operational LEAKAGE 3.4.4 Dresden 2 and 3 3.4.4-2 Amendment No. 276/269 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.

Unidentified LEAKAGE increase not within limit.

C.1 Reduce unidentified LEAKAGE increase to within limits.

OR C.2 Verify source of unidentified LEAKAGE increase is not intergranular stress corrosion cracking susceptible material.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program

0 EXELON FITZPATRICK, LLC AND EXELON GENERATION COMPANY, LLC DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 346 Renewed License No. DPR-59

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-59 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 346, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:45:01 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 346 RENEWED FACILITY OPERATING LICENSE NO. DPR-59 JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-59 Page 3 TSs 1.1-4 3.4.4-1 3.4.4-2 License DPR-59 Page 3 TSs 1.1-4 3.4.4-1 3.4.4-2 Amendment 346 Renewed License No. DPR-59 (4)

Exelon Generation Company pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, at any time, any byproduct, source and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration; or associated with radioactive apparatus, components or tools.

(5)

Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:

Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at steady state reactor core power levels not in excess of 2536 megawatts (thermal).

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 346, are hereby incorporated in the renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3)

Fire Protection Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protections program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated November 20, 1972; the SER Supplement No. 1 dated February 1, 1973; the SER Supplement No. 2 dated October 4, 1974; the SER dated August 1, 1979; the SER Supplement dated October 3, 1980; the SER Supplement dated February 13, 1981; the NRC Letter dated February 24, 1981; Technical Specification Amendments 34 (dated January 31, 1978), 80 (dated May 22, 1984), 134 (dated July 19, 1989),

135 (dated September 5, 1989), 142 (dated October 23, 1989), 164 (dated August 10, 1990), 176 (dated January 16, 1992), 177 (dated February 10, 1992), 186 (dated February 19, 1993), 190 (dated June 29, 1993), 191 (dated July 7, 1993), 206 (dated February 28, 1994), and 214 (dated June 27, 1994); and NRC Exemptions and associated safety evaluations dated April 26, 1983, July 1, 1983, January 11, 1985,

Definitions 1.1 1.1 Definitions (continued)

JAFNPP 1.1-4 Amendment 346 INSERVICE TESTING PROGRAM The INSERVICE TESTING PROGRAM is the licensee program that fulfills the requirements of 10 CFR 50.55a(f).

ISOLATION INSTRUMENTATION RESPONSE TIME The ISOLATION INSTRUMENTATION RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its isolation initiation setpoint at the channel sensor until the isolation valve receives the isolation signal (e.g., de-energization of the main steam isolation valve solenoids). The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC.

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE into the drywell, such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; c.

Total LEAKAGE Sum of the identified and unidentified LEAKAGE; and d.

Pressure Boundary LEAKAGE LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall.

LEAKAGE past seals, packing, or gaskets is not pressure boundary LEAKAGE.

(continued)

RCS Operational LEAKAGE 3.4.4 JAFNPP 3.4.4-1 Amendment 346 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 RCS Operational LEAKAGE LCO 3.4.4 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

25 gpm total LEAKAGE average over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Total LEAKAGE not within limit.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Unidentified LEAKAGE increase not within limit.

C.1 Reduce unidentified LEAKAGE increase to within limits.

OR 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)

RCS Operational LEAKAGE 3.4.4 JAFNPP 3.4.4-2 Amendment 346 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

C.2 Verify source of unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program

1 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-373 LASALLE COUNTY STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 253 Renewed License No. NPF-11

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-11 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 253, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:45:34 -05'00'

2 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-374 LASALLE COUNTY STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 239 Renewed License No. NPF-18

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-18 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 239, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:46:04 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NOS. 253 AND 239 RENEWED FACILITY OPERATING LICENSE NOS. NPF-11 AND NPF-18 LASALLE COUNTY STATION, UNITS 1 AND 2 DOCKET NOS. 50-373 AND 50-374 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-11 License NPF-11 Page 3 Page 3 License NPF-18 License NPF-18 Page 3 Page 3 TSs TSs 1.1-7 1.1-7 3.4.5-1 3.4.5-1 3.4.5-2 3.4.5-2 Renewed License No. NPF-11 Amendment No. 253 (3)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 253, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

DELETED (4)

DELETED (5)

DELETED Am. 146 01/12/01 Am. 202 07/21/11 Am. 198 09/16/10 Am. 253 01/13/22 Am. 194 08/28/09 Am. 194 08/28/09 Am. 194 08/28/09 Renewed License No. NPF-18 Amendment No. 239 (2)

Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal). Items in shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 239, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Am. 189 07/21/11 Am. 185 09/16/10 Am. 239 01/13/22

Definitions 1.1 LaSalle 1 and 2 1.1-7 Amendment No. 253/239 1.1 Definitions (continued)

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE into the drywell such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; c.

Total LEAKAGE Sum of the identified and unidentified LEAKAGE; and d.

Pressure Boundary LEAKAGE LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

LINEAR HEAT GENERATION The LHGR shall be the heat generation rate per RATE (LHGR) unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

LOGIC SYSTEM FUNCTIONAL A LOGIC SYSTEM FUNCTIONAL TEST shall be a test TEST of all logic components required for OPERABILITY of a logic circuit, from as close to the sensor as practicable up to, but not including, the actuated device, to verify OPERABILITY. The LOGIC SYSTEM FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total system steps so that the entire logic system is tested.

(continued)

RCS Operational LEAKAGE 3.4.5 LaSalle 1 and 2 3.4.5-1 Amendment No. 253/239 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Operational LEAKAGE LCO 3.4.5 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

25 gpm total LEAKAGE averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Total LEAKAGE not within limit.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Unidentified LEAKAGE increase not within limit.

C.1 Reduce unidentified LEAKAGE increase to within limit.

OR 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)

RCS Operational LEAKAGE 3.4.5 LaSalle 1 and 2 3.4.5-2 Amendment No. 253/239 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

C.2 Verify source of unidentified LEAKAGE increase is not intergranular stress corrosion cracking susceptible material.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program

3 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-352 LIMERICK GENERATING STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 254 Renewed License No. NPF-39

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-39 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 254, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:46:36 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 254 RENEWED FACILITY OPERATING LICENSE NO. NPF-39 LIMERICK GENERATING STATION, UNIT 1 DOCKET NO. 50-352 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-39 License NPF-39 Page 3 Page 3 TSs TSs 1-3 1-3 1-5 1-5 3/4 4-9 3/4 4-9 Renewed License No. NPF-39 Amendment No. 254 (2)

Pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels not in excess of 3515 megawatts thermal (100% rated power) in accordance with the conditions specified herein and in Attachment 1 to this license. The items identified in Attachment 1 to this renewed license shall be completed as specified. Attachment 1 is hereby incorporated into this renewed license.

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 254, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

DEFINITIONS END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM RESPONSE TIME 1.12 The END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM RESPONSE TIME shall be that time interval to complete suppression of the electric arc between the fully open contacts of the recirculation pump circuit breaker from initial movement of the associated:

a.

Turbine stop valves, and b.

Turbine control valves.

This total system response time consists of two components, the instrumen-tation response time and the breaker arc suppression time. These times may be measured by any series of sequential, overlapping or total steps such that the entire response time is measured.

1.13 (Deleted) 1.14 (Deleted)

FREQUENCY NOTATION 1.15 The FREQUENCY NOTATION specified for the performance of Surveillance Requirements shall correspond to the intervals defined in Table 1.1.

HIGH (POWER) TRIP SETPOINT (HTSP) 1.15a The high power trip setpoint associated with the Rod Block Monitor (RBM) rod block trip setting applicable above 85% reactor thermal power.

IDENTIFIED LEAKAGE 1.16 IDENTIFIED LEAKAGE shall be:

a.

Leakage into collection systems, such as pump seal or valve packing leaks, that is captured and conducted to a sump or collecting tank, or b.

Leakage into the containment atmosphere from sources that are both specifically located and known to not interfere with the operation of the leakage detection systems.

INSERVICE TESTING PROGRAM 1.16a The INSERVICE TESTING PROGRAM is the licensee program that fulfills the requirements of 10 CFR 50.55a(f).

INTERMEDIATE (POWER) TRIP SETPOINT (ITSP) 1.16b The intermediate power trip setpoint associated with the Rod Block Monitor (RBM) rod block trip setting applicable between 65% and 85% reactor thermal power.

ISOLATION SYSTEM RESPONSE TIME 1.17 The ISOLATION SYSTEM RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its isolation actuation setpoint at the channel sensor until the isolation valves travel to their required positions.

Times shall include diesel generator starting and sequence loading delays where applicable. The response time may be measured by any series of sequential, overlapping or total steps such that the entire response time is measured.

LIMITING CONTROL ROD PATTERN 1.18 A LIMITING CONTROL ROD PATTERN shall be a pattern which results in the core being on a thermal hydraulic limit, i.e., operating on a limiting value for APLHGR, LHGR, or MCPR.

LINEAR HEAT GENERATION RATE 1.19 LINEAR HEAT GENERATION RATE (LHGR) shall be the heat generation per unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

LIMERICK - UNIT 1 1-3 Amendment No. 66, 225, 254

DEFINITIONS OPERATIONAL CONDITION - CONDITION 1.26 An OPERATIONAL CONDITION, i.e., CONDITION, shall be any one inclusive combination of mode switch position and average reactor coolant tempera-ture as specified in Table 1.2.

PHYSICS TESTS 1.27 PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation and (1) described in Chapter 14 of the FSAR, (2) authorized under the provisions of 10 CFR 50.59, or (3) otherwise approved by the Commission.

PRESSURE BOUNDARY LEAKAGE 1.28 PRESSURE BOUNDARY LEAKAGE shall be leakage through a fault in a reactor coolant system component body, pipe wall or vessel wall. Leakage past seals, packing, and gaskets is not PRESSURE BOUNDARY LEAKAGE.

PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) 1.28a The PTLR is the unit specific document that provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, for the current vessel fluence period. The pressure and temperature limits shall be determined for each fluence period in accordance with Specification 6.9.1.13.

PRIMARY CONTAINMENT INTEGRITY 1.29 PRIMARY CONTAINMENT INTEGRITY shall exist when:

a.

All primary containment penetrations required to be closed during accident conditions are either:

1.

Capable of being closed by an OPERABLE primary containment automatic isolation system, or 2.

Closed by at least one manual valve, blind flange, or deactivated automatic valve secured in its closed position, except for valves that are opened under administrative control as permitted by Specification 3.6.3.

b.

All primary containment equipment hatches are closed and sealed.

c.

The primary containment air lock is in compliance with the requirements of Specification 3.6.1.3.

d.

The primary containment leakage rates are within the limits of Specification 3.6.1.2.

e.

The suppression chamber is in compliance with the requirements of Specification 3.6.2.1.

f.

The sealing mechanism associated with each primary containment penetration; e.g., welds, bellows, or O-rings, is OPERABLE.

PROCESS CONTROL PROGRAM 1.30 The PROCESS CONTROL PROGRAM (PCP) shall contain the provisions to assure that the solidification or dewatering and packaging of radioactive wastes results in a waste package with properties that meet the minimum and stability requirements of 10 CFR Part 61 and other requirements for transportation to the disposal site and receipt at the disposal site.

With solidification or dewatering, the PCP shall identify the process parameters influencing solidification or dewatering, based on laboratory scale and full scale testing or experience.

LIMERICK - UNIT 1 1-5 Amendment No. 48, 66, 146, 253, 254

REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.3.2 Reactor coolant system leakage shall be limited to:

a.

No PRESSURE BOUNDARY LEAKAGE.

b.

5 gpm UNIDENTIFIED LEAKAGE.

c.

30 gpm total leakage.

d.

25 gpm total leakage averaged over any 24-hour period.

e.

1 gpm leakage at a reactor coolant system pressure of 950 +/-10 psig from any reactor coolant system pressure isolation valve.**

f.

2 gpm increase in UNIDENTIFIED LEAKAGE over a 24-hour period.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a.

With any PRESSURE BOUNDARY LEAKAGE, isolate affected component, pipe, or vessel from the reactor coolant system by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Otherwise, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With any reactor coolant system leakage greater than the limits in b, c and/or d above, reduce the leakage rate to within the limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.

With any reactor coolant system pressure isolation valve leakage greater than the above limit, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one other closed manual, deactivated automatic, or check* valves, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d.

With one or more of the high/low pressure interface valve leakage pressure monitors inoperable, restore the inoperable monitor(s) to OPERABLE status within 7 days or verify the pressure to be less than the alarm setpoint at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; restore the inoperable monitor(s) to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e.

With any reactor coolant system leakage greater than the limit in f above, identify the source of leakage within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

  • Which have been verified not to exceed the allowable leakage limit at the last refueling outage or after the last time the valve was disturbed, whichever is more recent.
    • Pressure isolation valve leakage is not included in any other allowable operational leakage specified in Section 3.4.3.2.

LIMERICK - UNIT 1 3/4 4-9 Amendment No. 28, 49, 172, 182, 254

4 EXELON GENERATION COMPANY, LLC DOCKET NO. 50-353 LIMERICK GENERATING STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 216 Renewed License No. NPF-85

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-85 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 216, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:47:02 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 216 RENEWED FACILITY OPERATING LICENSE NO. NPF-85 LIMERICK GENERATING STATION, UNIT 2 DOCKET NO. 50-353 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-85 License NPF-85 Page 3 Page 3 TSs TSs 1-3 1-3 1-5 1-5 3/4 4-9 3/4 4-9 Renewed License No. NPF-85 Amendment No. 216 (2)

Pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.

C.

This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3515 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 216, are hereby incorporated into this renewed license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

DEFINITIONS END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM RESPONSE TIME 1.12 The END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM RESPONSE TIME shall be that time interval to complete suppression of the electric arc between the fully open contacts of the recirculation pump circuit breaker from initial movement of the associated:

a.

Turbine stop valves, and b.

Turbine control valves.

This total system response time consists of two components, the instrumen-tation response time and the breaker arc suppression time. These times may be measured by any series of sequential, overlapping or total steps such that the entire response time is measured.

1.13 (Deleted) 1.14 (Deleted)

FREQUENCY NOTATION 1.15 The FREQUENCY NOTATION specified for the performance of Surveillance Requirements shall correspond to the intervals defined in Table 1.1.

HIGH (POWER) TRIP SETPOINT (HTSP) 1.15a The high power trip setpoint associated with the Rod Block Monitor (RBM) rod block trip setting applicable above 85% reactor thermal power.

IDENTIFIED LEAKAGE 1.16 IDENTIFIED LEAKAGE shall be:

a.

Leakage into collection systems, such as pump seal or valve packing leaks, that is captured and conducted to a sump or collecting tank, or b.

Leakage into the containment atmosphere from sources that are both specifically located and known to not interfere with the operation of the leakage detection systems.

INSERVICE TESTING PROGRAM 1.16a The INSERVICE TESTING PROGRAM is the licensee program that fulfills the requirements of 10 CFR 50.55a(f).

INTERMEDIATE (POWER) TRIP SETPOINT (ITSP) 1.16b The intermediate power trip setpoint associated with the Rod Block Monitor (RBM) rod block trip setting applicable between 65% and 85% reactor thermal power.

ISOLATION SYSTEM RESPONSE TIME 1.17 The ISOLATION SYSTEM RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its isolation actuation setpoint at the channel sensor until the isolation valves travel to their required positions.

Times shall include diesel generator starting and sequence loading delays where applicable. The response time may be measured by any series of sequential, overlapping or total steps such that the entire response time is measured.

LIMITING CONTROL ROD PATTERN 1.18 A LIMITING CONTROL ROD PATTERN shall be a pattern which results in the core being on a thermal hydraulic limit, i.e., operating on a limiting value for APLHGR, LHGR, or MCPR.

LINEAR HEAT GENERATION RATE 1.19 LINEAR HEAT GENERATION RATE (LHGR) shall be the heat generation per unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

LIMERICK - UNIT 2 1-3 Amendment No. 48, 188, 216

DEFINITIONS OPERATIONAL CONDITION - CONDITION 1.26 An OPERATIONAL CONDITION, i.e., CONDITION, shall be any one inclusive combination of mode switch position and average reactor coolant tempera-ture as specified in Table 1.2.

PHYSICS TESTS 1.27 PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation and (1) described in Chapter 14 of the FSAR, (2) authorized under the provisions of 10 CFR 50.59, or (3) otherwise approved by the Commission.

PRESSURE BOUNDARY LEAKAGE 1.28 PRESSURE BOUNDARY LEAKAGE shall be leakage through a fault in a reactor coolant system component body, pipe wall or vessel wall. Leakage past seals, packing, and gaskets is not PRESSURE BOUNDARY LEAKAGE.

PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) 1.28a The PTLR is the unit specific document that provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, for the current vessel fluence period. The pressure and temperature limits shall be determined for each fluence period in accordance with Specification 6.9.1.13.

PRIMARY CONTAINMENT INTEGRITY 1.29 PRIMARY CONTAINMENT INTEGRITY shall exist when:

a.

All primary containment penetrations required to be closed during accident conditions are either:

1.

Capable of being closed by an OPERABLE primary containment automatic isolation system, or 2.

Closed by at least one manual valve, blind flange, or deactivated automatic valve secured in its closed position, except for valves that are opened under administrative control as permitted by Specification 3.6.3.

b.

All primary containment equipment hatches are closed and sealed.

c.

The primary containment air lock is in compliance with the requirements of Specification 3.6.1.3.

d.

The primary containment leakage rates are within the limits of Specification 3.6.1.2.

e.

The suppression chamber is in compliance with the requirements of Specification 3.6.2.1.

f.

The sealing mechanism associated with each primary containment penetration; e.g., welds, bellows, or O-rings, is OPERABLE.

PROCESS CONTROL PROGRAM 1.30 The PROCESS CONTROL PROGRAM (PCP) shall contain the provisions to assure that the solidification or dewatering and packaging of radioactive wastes results in a waste package with properties that meet the minimum and stability requirements of 10 CFR Part 61 and other requirements for trans-portation to the disposal site and receipt at the disposal site. With solidification or dewatering, the PCP shall identify the process parameters influencing solidification or dewatering based on laboratory scale and full scale testing or experience.

LIMERICK - UNIT 2 1-5 Amendment No. 11, 48, 107, 215, 216

REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.3.2 Reactor coolant system leakage shall be limited to:

a.

No PRESSURE BOUNDARY LEAKAGE.

b.

5 gpm UNIDENTIFIED LEAKAGE.

c.

30 gpm total leakage.

d.

25 gpm total leakage averaged over any 24-hour period.

e.

1 gpm leakage at a reactor coolant system pressure of 950 +/-10 psig from any reactor coolant system pressure isolation valve.**

f.

2 gpm increase in UNIDENTIFIED LEAKAGE over a 24-hour period.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a.

With any PRESSURE BOUNDARY LEAKAGE, isolate affected component, pipe, or vessel from the reactor coolant system by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Otherwise, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With any reactor coolant system leakage greater than the limits in b, c and/or d above, reduce the leakage rate to within the limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.

With any reactor coolant system pressure isolation valve leakage greater than the above limit, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one other closed manual, deactivated automatic, or check* valves, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d.

With one or more of the high/low pressure interface valve leakage pressure monitors inoperable, restore the inoperable monitor(s) to OPERABLE status within 7 days or verify the pressure to be less than the alarm setpoint at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />; restore the inoperable monitor(s) to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e.

With any reactor coolant system leakage greater than the limit in f above, identify the source of leakage within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Which have been verified not to exceed the allowable leakage limit at the last refueling outage or after the last time the valve was disturbed, whichever is more recent.

    • Pressure isolation valve leakage is not included in any other allowable operational leakage specified in Section 3.4.3.2.

LIMERICK - UNIT 2 3/4 4-9 Amendment No. 12, 134, 144, 216

5 NINE MILE POINT NUCLEAR STATION, LLC LONG ISLAND LIGHTING COMPANY EXELON GENERATION COMPANY, LLC DOCKET NO. 50-410 NINE MILE POINT NUCLEAR STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 188 Renewed License No. NPF-69

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-69 is hereby amended to read as follows:

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 188, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L. Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:47:33 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 188 RENEWED FACILITY OPERATING LICENSE NO. NPF-69 NINE MILE POINT NUCLEAR STATION, UNIT 2 DOCKET NO. 50-410 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License NPF-69 License NPF-69 Page 4 Page 4 TSs TSs 1.1-6 1.1-6 3.4.5-1 3.4.5-1 3.4.5-2 3.4.5-2 Renewed License No. NPF-69 Amendment 117 through 187 188 (1)

Maximum Power Level Exelon Generation is authorized to operate the facility at reactor core power levels not in excess of 3988 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 188, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3)

Fuel Storage and Handling (Section 9.1, SSER 4)*

a. Fuel assemblies, when stored in their shipping containers, shall be stacked no more than three containers high.
b. When not in the reactor vessel, no more than three fuel assemblies shall be allowed outside of their shipping containers or storage racks in the New Fuel Vault or Spent Fuel Storage Facility.
c. The above three fuel assemblies shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array and approved storage rack locations.
d. The New Fuel Storage Vault shall have no more than ten fresh fuel assemblies uncovered at any one time.

(4)

Turbine System Maintenance Program (Section 3.5.1.3.10 SER)

The operating licensee shall submit for NRC approval by October 31, 1989, a turbine system maintenance program based on the manufacturers calculations of missile generation probabilities.

(Submitted by NMPC letter dated October 30, 1989 from C.D. Terry and approved by NRC letter dated March 15, 1990 from Robert Martin to Mr.

Lawrence Burkhardt, III).

The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.

Definitions 1.1 NMP2 1.1-6 Amendment 91, 123, 145, 168, 179, 188 1.1 Definitions LEAKAGE 2.

LEAKAGE into the drywell atmosphere from (continued) sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; and c.

Pressure Boundary LEAKAGE LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

LINEAR HEAT GENERATION The LHGR shall be the heat generation rate per RATE (LHGR) unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

LOGIC SYSTEM FUNCTIONAL A LOGIC SYSTEM FUNCTIONAL TEST shall be a test TEST of all required logic components (i.e., all required relays and contacts, trip units, solid state logic elements, etc.) of a logic circuit, from as close to the sensor as practicable up to, but not including, the actuated device, to verify OPERABILITY. The LOGIC SYSTEM FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total system steps so that the entire logic system is tested.

MINIMUM CRITICAL POWER The MCPR shall be the smallest critical power RATIO (MCPR) ratio (CPR) that exists in the core for each class of fuel. The CPR is that power in the assembly that is calculated by application of the appropriate correlation(s) to cause some point in the assembly to experience boiling transition, divided by the actual assembly operating power.

MODE A MODE shall correspond to any one inclusive combination of mode switch position, average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.

(continued)

RCS Operational LEAKAGE 3.4.5 NMP2 3.4.5-1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.5 RCS Operational LEAKAGE LCO 3.4.5 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

25 gpm identified LEAKAGE averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Identified LEAKAGE not within limit.

B. 1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Unidentified LEAKAGE increase not within limit.

C. 1 Reduce unidentified LEAKAGE increase to within limit.

OR C.2 Identify source of unidentified LEAKAGE increase.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours (continued)

Amendment 91, 188

RCS Operational LEAKAGE 3.4.5 NMP2 3.4.5-2 Amendment 91, 152, 188 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify RCS unidentified and identified LEAKAGE and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program

6 EXELON GENERATION COMPANY, LLC PSEG NUCLEAR, LLC DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT 2 AMENDMENT TO SUBSEQUENT RENEWED FACILITY OPERATING LICENSE Amendment No. 339 Subsequent Renewed License No. DPR-44

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Subsequent Renewed Facility Operating License No. DPR-44 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 339, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Subsequent Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:48:07 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 339 SUBSEQUENT RENEWED FACILITY OPERATING LICENSE NO. DPR-44 PEACH BOTTOM ATOMIC POWER STATION, UNIT 2 DOCKET NO. 50-277 Replace the following pages of the Subsequent Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-44 License DPR-44 Page 3 Page 3 TSs TSs 1.1-3a 1.1-3a 3.4-10 3.4-10 3.4-11 3.4-11

Page 3 Subsequent Renewed License No. DPR-44 Amendment No. 339 (2)

Exelon Generation Company, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Limerick Generating Station, Units 1 and 2.

C.

This subsequent renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit 2, at steady state reactor core power levels not in excess of 4016 megawatts thermal.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 339, are hereby incorporated in the license.

Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3)

Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and

Definitions 1.1 1.1 Definitions (continued)

END OF CYCLE The EOC-RPT SYSTEM RESPONSE TIME shall be that RECIRCULATION PUMP TRIP time interval from initial signal generation by (EOC-RPT) SYSTEM RESPONSE the associated turbine stop valve limit switch or TIME from when the turbine control valve hydraulic oil control oil pressure drops below the pressure switch setpoint to complete suppression of the electric arc between the fully open contacts of the recirculation pump circuit breaker. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

INSERVICE TESTING PROGRAM The INSERVICE TESTING PROGRAM is the licensee program that fulfills the requirements of 10 CFR 50.55a(f).

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE into the drywell, such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; c.

Total LEAKAGE Sum of the identified and unidentified LEAKAGE; and d.

Pressure Boundary LEAKAGE LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

LINEAR HEAT GENERATION The LHGR shall be the heat generation rate per RATE (LHGR) unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

PBAPS UNIT 2 1.1-3a (continued)

Amendment No. 339

RCS Operational LEAKAGE 3.4.4 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 RCS Operational LEAKAGE LCO 3.4.4 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

25 gpm total LEAKAGE averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Total LEAKAGE not within limit.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Unidentified LEAKAGE increase not within limit.

C.1 Reduce LEAKAGE increase to within limits.

OR 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)

PBAPS UNIT 2 3.4-10 Amendment No. 339

RCS Operational LEAKAGE 3.4.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

C.2 Verify source of unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program.

PBAPS UNIT 2 3.4-11 Amendment No. 339

7 EXELON GENERATION COMPANY, LLC PSEG NUCLEAR, LLC DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 AMENDMENT TO SUBSEQUENT RENEWED FACILITY OPERATING LICENSE Amendment No. 342 Subsequent Renewed License No. DPR-56

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Subsequent Renewed Facility Operating License No. DPR-56 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 342, are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Subsequent Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:48:38 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 342 SUBSEQUENT RENEWED FACILITY OPERATING LICENSE NO. DPR-56 PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 DOCKET NO. 50-278 Replace the following pages of the Subsequent Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-56 License DPR-56 Page 3 Page 3 TSs TSs 1.1-3a 1.1-3a 3.4-10 3.4-10 3.4-11 3.4-11

Page 3 Subsequent Renewed License No. DPR-56 Amendment No. 342 (2)

Exelon Generation Company, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; (5)

Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Limerick Generating Station, Units 1 and 2.

C.

This subsequent renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1)

Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit No. 3, at steady state reactor core power levels not in excess of 4016 megawatts thermal.

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 342, are hereby incorporated in the license.

Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.

(3)

Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and

Definitions 1.1 1.1 Definitions (continued)

END OF CYCLE The EOC-RPT SYSTEM RESPONSE TIME shall be that RECIRCULATION PUMP TRIP time interval from initial signal generation by (EOC-RPT) SYSTEM RESPONSE the associated turbine stop valve limit switch or TIME from when the turbine control valve hydraulic oil control oil pressure drops below the pressure switch setpoint to complete suppression of the electric arc between the fully open contacts of the recirculation pump circuit breaker. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

INSERVICE TESTING PROGRAM The INSERVICE TESTING PROGRAM is the licensee program that fulfills the requirements of 10 CFR 50.55a(f).

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE into the drywell, such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; c.

Total LEAKAGE Sum of the identified and unidentified LEAKAGE; and d.

Pressure Boundary LEAKAGE LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

LINEAR HEAT GENERATION The LHGR shall be the heat generation rate per RATE (LHGR) unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

(continued)

PBAPS UNIT 3 1.1-3a Amendment No. 342

RCS Operational LEAKAGE 3.4.4 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 RCS Operational LEAKAGE LCO 3.4.4 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

25 gpm total LEAKAGE averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Total LEAKAGE not within limit.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Unidentified LEAKAGE increase not within limit.

C.1 Reduce LEAKAGE increase to within limits.

OR 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)

PBAPS UNIT 3 3.4-10 Amendment No. 342

RCS Operational LEAKAGE 3.4.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

C.2 Verify source of unidentified LEAKAGE increase is not service sensitive type 304 or type 316 austenitic stainless steel.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program.

PBAPS UNIT 3 3.4-11 Amendment No. 342

8 EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 288 Renewed License No. DPR-29

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-29 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 288, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:49:14 -05'00'

9 EXELON GENERATION COMPANY, LLC AND MIDAMERICAN ENERGY COMPANY DOCKET NO. 50-265 QUAD CITIES NUCLEAR POWER STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 284 Renewed License No. DPR-30

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Renewed Facility Operating License No. DPR-30 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 284, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:49:47 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NOS. 288 AND 284 RENEWED FACILITY OPERATING LICENSE NOS. DPR-29 AND DPR-30 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-254 AND 50-265 Replace the following pages of the Renewed Facility Operating Licenses and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-29 License DPR-29 Page 4 Page 4 License DPR-30 License DPR-30 Page 4 Page 4 TSs TSs 1.1-5 1.1-5 1.1-6 1.1-6 3.4.4-1 3.4.4-1 3.4.4-2 3.4.4-2 Renewed License No. DPR-29 Amendment No. 288 B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 288, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

C.

The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:

The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.

D.

Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.

E.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined sets of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2, submitted by letter dated May 17, 2006.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The Exelon Generation Company CSP was approved by License Amendment No. 249 as modified by License Amendment No. 259.

F.

The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27, 1979 with supplements dated November 5, 1980, and 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Renewed License No. DPR-30 Amendment No. 284 B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 284, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

C.

The licensee shall maintain the commitments made in response to the March 14, 1983, NUREG-0737 Order, subject to the following provision:

The licensee may make changes to commitments made in response to the March 14, 1983, NUREG-0737 Order without prior approval of the Commission as long as the change would be permitted without NRC approval, pursuant to the requirements of 10 CFR 50.59. Consistent with this regulation, if the change results in an Unreviewed Safety Question, a license amendment shall be submitted to the NRC staff for review and approval prior to implementation of the change.

D.

Equalizer Valve Restriction Three of the four valves in the equalizer piping between the recirculation loops shall be closed at all times during reactor operation with one bypass valve open to allow for thermal expansion of water.

E.

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans1, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: Quad Cities Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 2, submitted by letter dated May 17, 2006.

Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The Exelon Generation Company CSP was approved by License Amendment No. 244 and modified by License Amendment No. 254.

F.

The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Reports dated July 27, 1979 with supplements dated 1 The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.

Definitions 1.1 Quad Cities 1 and 2 1.1-5 Amendment No. 288/284 1.1 Definitions DRAIN TIME c.

The penetration flow paths required to be (continued) evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; d.

No additional draining events occur; and e.

Realistic cross-sectional areas and drain rates are used.

A bounding DRAIN TIME may be used in lieu of a calculated value.

INSERVICE TESTING The INSERVICE TESTING PROGRAM is the licensee PROGRAM program that fulfills the requirements of 10 CFR 50.55a(f).

LEAKAGE LEAKAGE shall be:

a.

Identified LEAKAGE

1. LEAKAGE into the drywell, such as that from pump seals or valve packing, that is captured and conducted to a sump or collecting tank; or
2. LEAKAGE into the drywell atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; b.

Unidentified LEAKAGE All LEAKAGE into the drywell that is not identified LEAKAGE; c.

Total LEAKAGE Sum of the identified and unidentified LEAKAGE; and (continued)

Definitions 1.1 Quad Cities 1 and 2 1.1-6 Amendment No. 288/284 1.1 Definitions LEAKAGE d.

Pressure Boundary LEAKAGE (continued)

LEAKAGE through a fault in a Reactor Coolant System (RCS) component body, pipe wall, or vessel wall. LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

LINEAR HEAT GENERATION The LHGR shall be the heat generation rate per RATE (LHGR) unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.

LOGIC SYSTEM FUNCTIONAL A LOGIC SYSTEM FUNCTIONAL TEST shall be a test TEST of all logic components required for OPERABILITY of a logic circuit, from as close to the sensor as practicable up to, but not including, the actuated device, to verify OPERABILITY. The LOGIC SYSTEM FUNCTIONAL TEST may be performed by means of any series of sequential, overlapping, or total system steps so that the entire logic system is tested.

MINIMUM CRITICAL POWER The MCPR shall be the smallest critical power RATIO (MCPR) ratio (CPR) that exists in the core for each class of fuel. The CPR is that power in the assembly that is calculated by application of the appropriate correlation(s) to cause some point in the assembly to experience boiling transition, divided by the actual assembly operating power.

MODE A MODE shall correspond to any one inclusive combination of mode switch position, average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.

OPERABLE OPERABILITY A system, subsystem, division, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, division, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s).

(continued)

RCS Operational LEAKAGE 3.4.4 Quad Cities 1 and 2 3.4.4-1 Amendment No. 288/284 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.4 RCS Operational LEAKAGE LCO 3.4.4 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

5 gpm unidentified LEAKAGE; c.

25 gpm total LEAKAGE averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; and d.

2 gpm increase in unidentified LEAKAGE within the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period in MODE 1.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Unidentified LEAKAGE not within limit.

OR Total LEAKAGE not within limit.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Unidentified LEAKAGE increase not within limit.

C.1 Reduce unidentified LEAKAGE increase to within limit.

OR 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (continued)

RCS Operational LEAKAGE 3.4.4 Quad Cities 1 and 2 3.4.4-2 Amendment No. 288/284 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

C.2 Verify source of unidentified LEAKAGE increase is not intergranular stress corrosion cracking susceptible material.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D.

Required Action and associated Completion Time not met.

D.1 Be in MODE 3.

AND D.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits.

In accordance with the Surveillance Frequency Control Program

0 R. E. GINNA NUCLEAR POWER PLANT, LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-244 R. E. GINNA NUCLEAR POWER PLANT AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 146 Renewed License No. DPR-18

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Exelon Generation Company, LLC dated June 30, 2021, as supplemented by letter dated January 4, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-18 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 146, are hereby incorporated in the renewed license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications and Renewed Facility Operating License Date of Issuance: January 13, 2022 Nancy L.

Salgado Digitally signed by Nancy L. Salgado Date: 2022.01.13 09:50:21 -05'00'

ATTACHMENT TO LICENSE AMENDMENT NO. 146 RENEWED FACILITY OPERATING LICENSE NO. DPR-18 R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 Replace the following pages of the Renewed Facility Operating License and Appendix A, Technical Specifications (TSs), with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert License DPR-18 License DPR-18 Page 3 Page 3 TSs TSs 1.1-3 1.1-3 3.4.13-1 3.4.13-1 R. E. Ginna Nuclear Power Plant Amendment No. 146 (b)

Exelon Generation pursuant to the Act and 10 CFR Part 70, to possess and use four (4) mixed oxide fuel assemblies in accordance with the RG&Es application dated December 14, 1979 (transmitted by letter dated December 20, 1979), as supplemented February 20, 1980, and March 5, 1980; (3)

Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required.

(4)

Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)

Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1)

Maximum Power Level Exelon Generation is authorized to operate the facility at steady-state power levels up to a maximum of 1775 megawatts (thermal).

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 146, are hereby incorporated in the renewed license.

Exelon Generation shall operate the facility in accordance with the Technical Specifications.

(3)

Fire Protection Exelon Generation shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the licensees amendment request dated March 28, 2013, supplemented by letters dated December 17, 2013; January 29, 2014; February 28, 2014; September 5, 2014; September 24, 2014; December 4, 2014; March 18, 2015; June 11, 2015; August 7, 2015; and as approved in the safety evaluation report dated November 23, 2015.

Except where NRC approval for changes or deviations is required

Definitions 1.1 LEAKAGE LEAKAGE from the RCS shall be:

a.

Identified LEAKAGE 1.

LEAKAGE, such as that from pump seals or valve packing (except reactor coolant pump (RCP) seal water injection or return), that is captured and conducted to collection systems or a sump or collecting tank; 2.

LEAKAGE into the containment atmosphere from sources that are both specifically located and known to not interfere with the operation of leakage detection systems; or 3.

Reactor Coolant System (RCS) LEAKAGE through a steam generator to the Secondary System (primary to secondary LEAKAGE);

b.

Unidentified LEAKAGE All LEAKAGE (except RCP seal water injection or return) that is not identified LEAKAGE; and c.

Pressure Boundary LEAKAGE LEAKAGE (except primary to secondary LEAKAGE) through a fault in an RCS component body, pipe wall, or vessel wall.

LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE.

MODE

- MODES A MODE shall correspond to any one inclusive combination of core reactivity condition, power level, average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.

OPERABLE

- OPERABILITY A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s).

R.E. Ginna Nuclear Power Plant 1.1-3 Amendment 146

RCS Operational LEAKAGE 3.4.13 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.13 RCS Operational LEAKAGE LCO 3.4.13 RCS operational LEAKAGE shall be limited to:

a.

No pressure boundary LEAKAGE; b.

1 gpm unidentified LEAKAGE; c.

10 gpm identified LEAKAGE; and d.

150 gallons per day primary to secondary LEAKAGE through any one steam generator (SG).

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Pressure boundary LEAKAGE exists.

A.1 Isolate affected component, pipe, or vessel from the RCS by use of a closed manual valve, closed and de-activated automatic valve, blind flange, or check valve.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

RCS operational LEAKAGE not within limits for reasons other than pressure boundary LEAKAGE or primary to secondary LEAKAGE.

B.1 Reduce LEAKAGE to within limits.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C.

Required Action and associated Completion Time not met.

OR Primary to secondary LEAKAGE not within limit.

C.1 Be in MODE 3.

AND C.2 Be in MODE 5.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours R.E. Ginna Nuclear Power Plant 3.4.13-1 Amendment 146

1 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 223 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-72 AMENDMENT NO. 223 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-77 AMENDMENT NO. 225 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-37 AMENDMENT NO. 225 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-66 AMENDMENT NO. 341 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 AMENDMENT NO. 319 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 AMENDMENT NO. 242 TO FACILITY OPERATING LICENSE NO. NPF-62 AMENDMENT NO. 276 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-19 AMENDMENT NO. 269 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-25 AMENDMENT NO. 346 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-59 AMENDMENT NO. 253 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-11 AMENDMENT NO. 239 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-18 AMENDMENT NO. 254 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-39 AMENDMENT NO. 216 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-85 AMENDMENT NO. 188 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-69 AMENDMENT NO. 339 TO SUBSEQUENT RENEWED FACILITY OPERATING LICENSE NO. DPR-44 AMENDMENT NO. 342 TO SUBSEQUENT RENEWED FACILITY OPERATING LICENSE NO. DPR-56 AMENDMENT NO. 288 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-29 AMENDMENT NO. 284 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-30 AND AMENDMENT NO. 146 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-18 EXELON GENERATION COMPANY, LLC BRAIDWOOD STATION, UNITS 1 AND 2 BYRON STATION, UNIT NOS. 1 AND 2 CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 CLINTON POWER STATION, UNIT NO. 1 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 JAMES A. FITZPATRICK NUCLEAR POWER PLANT LASALLE COUNTY STATION, UNITS 1 AND 2 LIMERICK GENERATING STATION, UNITS 1 AND 2 NINE MILE POINT NUCLEAR STATION, UNIT 2 PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 R. E. GINNA NUCLEAR POWER PLANT DOCKET NOS. STN 50-456, STN 50-457, STN 50-454, STN 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-410, 50-277, 50-278, 50-254, 50-265, AND 50-244

1.0 INTRODUCTION

By application dated June 30, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21181A180), as supplemented by letter dated January 4, 2022 (ADAMS Accession No. ML22004A341), Exelon Generation Company, LLC (Exelon) submitted a license amendment request for Braidwood Station (Braidwood), Units 1 and 2; Byron Station (Byron), Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2; Clinton Power Station (Clinton), Unit No. 1; Dresden Nuclear Power Station (Dresden), Units 2 and 3; James A. FitzPatrick Nuclear Power Plant (FitzPatrick); LaSalle County Station (LaSalle),

Units 1 and 2; Limerick Generating Station (Limerick), Units 1 and 2; Nine Mile Point Nuclear Station, Unit 2 (NMP-2); Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3; Quad Cities Nuclear Power Station (Quad Cities), Units 1 and 2; and R. E. Ginna Nuclear Power Plant (Ginna) (collectively, the facilities). For each facility, the amendments would revise the technical specification (TS) requirements for reactor coolant system (RCS) operational leakage based on the Technical Specifications Task Force (TSTF) traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements (ADAMS Accession No. ML20016A233).

The January 4, 2022, supplemental letter provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC, the Commission) staffs original proposed no significant hazards consideration determination as published in the Federal Register on September 7, 2021 (86 FR 50194).

1.1 Reactor Coolant System Description Components that contain or transport the coolant to or from the reactor core make up the RCS.

Materials can degrade as a result of the complex interaction of the materials, the stresses they encounter, and through operational wear or mechanical deterioration during normal and upset operating environments. Such material degradation could lead to leakage of reactor coolant into containment buildings.

RCS leakage falls under two main categories: identified leakage and unidentified leakage.

Identifying the sources of leakage is necessary for prompt identification of potentially adverse conditions, assessment of safety significance of the leakage, and quick corrective action. A limited amount of leakage from the reactor coolant pressure boundary directly into the containment/drywell atmosphere is expected as the RCS and other connected systems cannot be made 100 percent leak tight. This leakage is detected, located, and isolated from the containment atmosphere so as to not interfere with measurement of unexpected RCS leakage detection.

The safety significance of RCS leakage varies widely depending on its source, rate, and duration. Therefore, detecting and monitoring RCS leakage into the containment area is necessary. Separation of identified leakage from unidentified leakage provides quantitative information to the operators, allowing them to take corrective action should leakage occur that is detrimental to the safety of the unit and the public.

1.2 Proposed TS Changes to Adopt TSTF-554, Revision 1 In accordance with the NRC staff-approved TSTF-554, Revision 1, the licensee proposed to change the following TS requirements for RCS operational leakage:

For each facility, the TS definition of identified leakage would be revised to remove the exclusion of pressure boundary leakage from identified leakage by deleting the phrase not to be pressure boundary LEAKAGE and making conforming editorial changes.

This change would revise paragraph b of the IDENTIFIED LEAKAGE definition in TS 1.16 for Limerick and paragraph a.2. of the LEAKAGE definition in TS 1.1, Definitions, for the other facilities.

Pressure boundary leakage is currently defined in the TSs as leakage (except primary to secondary leakage in a pressurized-water reactor) through a nonisolable fault in an RCS component body, pipe wall, or vessel wall. For each facility, the TS definition of pressure boundary leakage would be revised to delete the word nonisolable. The following sentence (with some format differences for Limerick) would also be added to this definition: LEAKAGE past seals, packing, and gaskets is not pressure boundary LEAKAGE. These changes would revise paragraph c of the LEAKAGE definition in TS 1.1 for Braidwood, Byron, Calvert Cliffs, Ginna, NMP-2; paragraph d of the LEAKAGE definition in TS 1.1 for Clinton, Dresden, FitzPatrick, LaSalle, Peach Bottom, Quad Cities; and TS 1.28 for Limerick.

Additional editorial changes would be made to the LEAKAGE definition in the TSs for Braidwood, Byron, Calver Cliffs, Clinton, Ginna, FitzPatrick, and Peach Bottom.

The RCS operational leakage requirements in TS 3.4.4 for Dresden, FitzPatrick, Peach Bottom, Quad Cities and TS 3.4.5 for Clinton, LaSalle, and NMP-2 would be revised as follows:

o A new Condition A to isolate the pressure boundary leakage within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> would be added to the Actions section.

o Existing Conditions A, B, and C and the associated required actions would be renumbered.

o Existing Condition C would be revised to delete the condition Pressure boundary LEAKAGE exists, because pressure boundary leakage would be addressed by the new Condition A. In addition, this Condition would be revised to be applicable when the required action and associated completion time of the other conditions are not met.

The RCS operational leakage requirements in TS 3.4.13 for Braidwood, Byron, Calvert Cliffs, and Ginna would be revised as follows:

o A new Condition A to isolate the pressure boundary leakage within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> would be added to the Actions section.

o Existing Conditions A and B and the associated required actions would be renumbered.

o Existing Condition B would be revised to delete the condition Pressure boundary LEAKAGE exists, because pressure boundary leakage would be addressed by the new Condition A. In addition, this Condition would be revised to be applicable when the required action and associated completion time of the other conditions are not met.

For Limerick, Action a of TS 3/4.4.3.2, Operational Leakage, would be revised to require the isolation of pressure boundary leakage within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Otherwise, Action a would continue to require the unit to be in at least hot shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and cold shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

1.3 Variations from TSTF-554 The following variations from TSTF-554 were identified in the application and January 4, 2022, supplement:

The Limerick TSs are based on an older version of the Standard Technical Specification (STS), which has different formatting and wording than the current STS.

The required action for the current Clinton TS 3.4.5, Condition B, only provides one of the two options listed in the STS 3.4.5 for Condition B.

The current required action B.2 in Dresden and Quad Cities TS 3.4.4 is worded differently than the STS.

The semicolon at the end of the unidentified LEAKAGE definition would be retained in the TSs for Clinton, Dresden, FitzPatrick, LaSalle, Peach Bottom, and Quad Cities for grammatical consistency.

2.0 REGULATORY EVALUATION

Title 10 of the Code of Federal Regulations (10 CFR) 50.36(c)(2) requires that TSs include limiting conditions for operation (LCOs). Per 10 CFR 50.36(c)(2)(i), LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. The regulation also requires that when an LCO of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TSs until the condition can be met.

The regulation at 10 CFR 50.2, Definitions, defines the reactor coolant pressure boundary as all those pressure-containing components of boiling and pressurized water-cooled nuclear power reactors, such as pressure vessels, piping, pumps, and valves. Regulatory Guide (RG) 1.45, Revision 1, Guidance on Monitoring and Responding to Reactor Coolant System Leakage, dated May 2008 (ADAMS Accession No. ML073200271), Section B, Discussion Leakage Separation, provides information related to separation between identified and unidentified leakage.

The NRC staffs guidance for the review of TSs is in Chapter 16.0, Revision 3, Technical Specifications, dated March 2010 (ADAMS Accession No. ML100351425), of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:

LWR [Light-Water Reactor] Edition. As described therein, as part of the regulatory standardization effort, the NRC staff has prepared STSs for each of the LWR nuclear designs.

Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the applicable STSs, as modified by NRC-approved travelers. The applicable STSs to the facilities are:

NUREG-0123, Rev. 2, Standard Technical Specifications for General Electric Boiling Water Reactors [BWRs], dated August 1979 (ADAMS Accession No. ML19249E868).

NUREG-1431, Standard Technical Specifications, Westinghouse Plants, Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, dated April 2012 (ADAMS Accession Nos. ML12100A222 and ML12100A228, respectively).

NUREG-1432, Standard Technical Specifications, Combustion Engineering Plants, Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, dated April 2012 (ADAMS Accession Nos. ML12102A165 and ML12102A169, respectively).

NUREG-1433, Standard Technical Specifications, General Electric BWR/4 Plants, Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, dated April 2012 (ADAMS Accession Nos. ML12104A192 and ML12104A193, respectively).

NUREG-1434, Standard Technical Specifications, General Electric BWR/6 Plants Volume 1, Specifications, and Volume 2, Bases, Revision 4.0, dated April 2012 (ADAMS Accession Nos. ML12104A195 and ML12104A196, respectively).

The traveler TSTF-554 revised the STSs related to RCS operational leakage and the definition of LEAKAGE in NUREG-1431 through -1434. By letter dated December 18, 2020 (ADAMS Package Accession No. ML20324A083), the NRC staff approved TSTF-554, Revision 1, and provided the associated safety evaluation (SE) to the TSTF. The Limerick TSs are based on NUREG-0123, Revision 2, which is an older version of the STS. Although TSTF-554 did not revise NUREG-0123, Revision 2, this does not preclude the adoption of TSTF-554 at Limerick.

3.0 TECHNICAL EVALUATION

3.1 Proposed TS Changes to Adopt TSTF-554 The NRC staff compared the licensees proposed TS changes in Section 1.2 of this SE against the approved changes in TSTF-554. In accordance with the SRP Chapter 16.0, the NRC staff determined that the STS changes approved in TSTF-554 are applicable to the facilities because these facilities are Westinghouse, Combustion Engineering, and General Electric designs and the NRC staff approved the TSTF-554 changes for such designs. The NRC finds that the licensees proposed TS changes for each facility, as described in Section 1.2 of this SE, are consistent with TSTF-554.

In the SE for TSTF-554, the NRC staff concluded that the changes to the STS in TSTF-554 were acceptable. The NRC determined that the licensees proposed TS changes for each facility, as described in Section 1.2 of this SE, are consistent with TSTF-554 and that the NRC staff findings in the SE for TSTF-554 are applicable to this license amendment request. The NRC staff finds that, with the proposed changes, LCO 3.4.4 for Dresden, FitzPatrick, Peach Bottom, and Quad Cities, LCO 3.4.5 for Clinton, LaSalle, and NMP-2, LCO 3.4.13 for Braidwood, Byron, Calvert Cliffs, and Ginna, and LCO 3.4.3.2 for Limerick would continue to specify the lowest functional capability or performance levels of equipment required for safe operation of the facilities, as required by 10 CFR 50.36(c)(2)(i). In addition, the NRC staff finds that the proposed Required Action A.1 and associated Completion Time for the condition where one of these LCOs is not met due to pressure boundary leakage are adequate remedial actions to be taken until the LCO can be met, as they provide adequate protection to the health and safety of the public. Therefore, the NRC staff concludes that the proposed TS changes for each facility are acceptable.

3.2 Variations from TSTF-554 The application states:

The Limerick TSs are based on an older version of the STS (NUREG-0123, Revision 2),

which has different formatting and wording than the current STS.

The required action for the current Clinton TS 3.4.5, Condition B, only provides one of the two options listed in the STS 3.4.5 for Condition B.

The current required action B.2 in Dresden and Quad Cities TS 3.4.4 is worded differently than the STS.

In addition, the January 4, 2022, supplement states that the semicolon at the end of the unidentified LEAKAGE definition would be retained in the TSs for Clinton, Dresden, FitzPatrick, LaSalle, Peach Bottom, and Quad Cities for grammatical consistency.

The NRC staff finds that these variations do not affect the applicability of TSTF-554 to Clinton, Dresden, FitzPatrick, LaSalle, Limerick, Peach Bottom, and Quad Cities.

3.3 TS Change Consistency The NRC staff reviewed the proposed TS changes for technical clarity and consistency with the existing requirements for customary terminology and formatting. The NRC staff finds that the proposed changes are consistent with Chapter 16.0 of the SRP and are therefore acceptable.

4.0 STATE CONSULTATION

In accordance with the Commissions regulations, the Illinois, Maryland, Pennsylvania, and New York State officials were notified of the proposed issuance of the amendments on December 7, 2021. The State officials had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change requirements with respect to installation or use of facility components located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (86 FR 50194; September 7, 2021). In addition, the amendments make editorial, corrective, or other minor revisions to the TSs. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributors: R. Grover, NRR B. Purnell, NRR Date of Issuance: January 13, 2022

ML21347A038 OFFICE DORL/LPL3/PM DORL/LPL3/LA DSS/STSB/BC OGC NLO NAME BPurnell SRohrer VCusumano CKreuzberger DATE 1/5/22 12/13/21 1/7/22 1/6/22 OFFICE DORL/LPL3/BC DORL/LPL3/PM NAME NSalgado BPurnell DATE 1/13/22 1/13/22