| | Start date | Site | Title | Topic |
|---|
| ENS 57965 | 2 October 2025 05:00:00 | Domtar Aw Llc | Stuck Open Gauge Shutter | |
| ML25280A138 | 1 October 2025 | Oregon State University | Forwards Oregon State University Triga Reactor (OSTR) Annual Report for Period July 2024 Through June 30, 2025 | Earthquake |
| W3F1-2025-0046, Resubmittal of Annual Radiological Environmental Operating Report (AREOR) - 2024 | 25 September 2025 | Waterford | Resubmittal of Annual Radiological Environmental Operating Report (AREOR) - 2024 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl Spill |
| ML25268A072 | 24 September 2025 | Salem | License Amendment Request to Modify Salem Generating Station Renewed Facility Operating Licenses in Support of Cobalt-60 Production | Shutdown Margin Cyber Security Safeguards Contingency Plan License Renewal Fire Protection Program Affidavit |
| LR-N25-0074, Attachment 6: Site Specific Information in Support of Cobalt Absorber (Coba) Assemblies in Salem Generating Station, Units 1 and 2 | 24 September 2025 | Salem | Attachment 6: Site Specific Information in Support of Cobalt Absorber (Coba) Assemblies in Salem Generating Station, Units 1 and 2 | Safe Shutdown Boric Acid Time to boil Safe Shutdown Earthquake FLEX Loss of Offsite Power Power Uprate |
| ML25268A077 | 24 September 2025 | Salem | Attachment 5: Cobalt-60 Supplemental Information to Support the Use of Cobalt Burnable Absorber (Coba) Assemblies in Pressurized Water Reactors | Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Time to boil Finite Element Analysis FLEX Loss of Offsite Power Power Uprate |
| ML25177A903 | 18 September 2025 | Pennsylvania State University | Examination Report Letter No. 50-005/OL-25-01, the Pennsylvania State University | Deep Dose Equivalent Fuel cladding Power change |
| ML25205A216 | 9 September 2025 | 07109270 | Enclosure 1 - CoC No. 9270, Revision No. 7 for the Model No. Ums Universal Transport Cask Package | Exclusive Use |
| LIC-25-0011, Corrected Page 5-25 to the Supplement of the License Amendment Request (LAR) to Revise License Termination Plan (LTP) | 4 September 2025 | Fort Calhoun | Corrected Page 5-25 to the Supplement of the License Amendment Request (LAR) to Revise License Termination Plan (LTP) | |
| ML25211A337 | 3 September 2025 | 07201042 | 2. Final Technical Specification for CoC No. 1042, Amendment No.4 for the NUHOMS Eos System | Time of Discovery Tornado Missile Commercial Grade Dedication Safe Shutdown Earthquake Nondestructive Examination Finite Element Analysis Stress corrosion cracking Fuel cladding Liquid penetrant Basic Component Seal weld |
| ML25211A338 | 3 September 2025 | 07201042 | 3. Final Safety Evaluation Report or CoC No. 1042, Amendment No.4 for the NUHOMS Eos System | High winds Non-Destructive Examination Anticipated operational occurrence Tornado Missile Commercial Grade Dedication Hydrostatic Coatings Tornado Missile Protection Earthquake Control of Heavy Loads Fuel cladding Basic Component |
| IR 05000220/2025002 | 13 August 2025 | Nine Mile Point | Integrated Inspection Report 05000220/2025002 and 05000410/2025002 and Independent Spent Fuel Storage Installation (ISFSI) Report 07201036/2025001 | Ultimate heat sink Non-Destructive Examination Mission time Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Significance Determination Process Scram Discharge Volume Operability Determination Containment high range radiation monitor Fire Protection Program Reactive Inspection |
| SVPLTR 25-0054, Revision to 2024 Annual Radioactive Effluent Release Report | 8 August 2025 | Dresden | Revision to 2024 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Sewage Treatment Plant Annual Radiological Environmental Operating Report Process Control Program |
| ML25203A330 | 1 August 2025 | | Methodology for Generating Maccs Site-Specific Input Files to Support Risk-Informed Radiological Consequence Assessment | Probabilistic Risk Assessment Large early release frequency Environmental Justice Fatality |
| ML25212A112 | 31 July 2025 | 11006064 | Export License Public Issued to Baker Hughes Oilfield Operations, LLC, PXB169.05 | |
| ML25211A145 | 30 July 2025 | 11006082 | Export License Issued to Schlumberger Technology Corporation PXB139.07 | |
| LIC-25-0008, Independent Spent Fuel Storage Installation - Response to Audit Report for Omaha Public Power District Request to Revise License Termination Plan Requirements and Request for Additional Information | 28 July 2025 | Fort Calhoun | Independent Spent Fuel Storage Installation - Response to Audit Report for Omaha Public Power District Request to Revise License Termination Plan Requirements and Request for Additional Information | |
| ML25100A194 | 23 July 2025 | Westinghouse | NRC Feedback and Observations for Westinghouse Electric Company Cobalt-60 Digital Serialization Approach White Paper | |
| ML25203A121 | 23 July 2025 | Westinghouse | Non-Proprietary Enclosure to NRC Feedback and Observations Letter for Westinghouse Electric Company Cobalt-60 Digital Serialization Approach White Paper | |
| ML25192A114 | 11 July 2025 | Oyster Creek | License Termination Plan License Amendment Request Audit Plan | |
| ML25189A269 | 7 July 2025 | NS Savannah | Nuclear Ship Savannah – Confirmatory Survey Activities Summary and Results Located in Baltimore, MD | |
| ML25171A176 | 3 July 2025 | Salem | Summary of Closed Meeting with PSEG Nuclear, LLC Regarding Cobalt-60 Production at Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Affidavit |
| ML25183A232 | 2 July 2025 | Nuclear Energy Institute | NEI - Meeting with Us NRC to Discuss Clarifications of NRC Rais/Observations on NEI 22-01, Revision 1 | |
| NUREG/CR-7310, Spent Fuel Storage and Transportation of Accident Tolerant Fuel Concepts | 30 June 2025 | | NUREG/CR-7310, Spent Fuel Storage and Transportation of Accident Tolerant Fuel Concepts | Non-Destructive Examination Anticipated operational occurrence Coatings Stress corrosion cracking Fuel cladding Accident Tolerant Fuel |
| ML25178C096 | 27 June 2025 | 11006034 | Letter to the Eb Notifying of the Issuance of PXB14b.11 | Brachytherapy |
| ML25178B784 | 27 June 2025 | 11006034 | Letter to the Eb Notifying of the Issuance of PXB14a.09 | Brachytherapy |
| ENS 57786 | 26 June 2025 19:02:00 | Holtec | Offsite Notification | |
| ML25170A029 | 18 June 2025 | Crystal River | Attachment 9: TBD - Basis for No Contaminated Water Dose at CR3 | |
| ML25169A249 | 18 June 2025 | Salem | June 25, 2025, Pre-Submittal Meeting Non-Proprietary Slides for License Amendment Request to Install Cobalt Burnable Absorbers to Breed Cobalt-60 | Pre-submittal |
| LR-N25-0057, Pre-Submittal Meeting Slides for License Amendment Request to Install Cobalt Burnable Absorbers to Breed Cobalt-60 | 18 June 2025 | Salem | Pre-Submittal Meeting Slides for License Amendment Request to Install Cobalt Burnable Absorbers to Breed Cobalt-60 | Affidavit Pre-submittal |
| ML25155B776 | 17 June 2025 | 07109204 | Enclosure 2 - Certificate of Compliance No. 9204 Rev. 24 | |
| ML25156A235 | 17 June 2025 | Crystal River | Audit Report Attachment on CR3 Partial Site Release | Offsite Dose Calculation Manual |
| ML25169A038 | 16 June 2025 | 11006610 | Export License Issued to Schlumberger Technology Corporation PXB249.00 | |
| ML25150A358 | 13 June 2025 | 07109384 | Enclosure 2 - RT-200 SER R0 Final | Non-Destructive Examination Coatings Nondestructive Examination Finite Element Analysis Exclusive Use |
| ML25150A356 | 13 June 2025 | 07109384 | Enclosure 1 - CoC 71-9384 Final | Exclusive Use |
| ML25142A244 | 11 June 2025 | 07109341 | Enclosure 2 - CoC 9341 Rev 11 | Exclusive Use |