ML20210B114
| ML20210B114 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/23/1982 |
| From: | TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20197F755 | List:
|
| References | |
| FOIA-85-59 1CP-AT-27-1, NUDOCS 8601270408 | |
| Download: ML20210B114 (2) | |
Text
a
,_for 1 f.ormation Only 0
Y
.~~-
C? SIS
--~~
e
- %)
Accepcance Test Procedura g.
.~ U '. l 3 '
1CP-AT-27-1 CSd'.
l I
CONDINSER VACUUM & LL*E301 F1QCNO Revision 0
P spared 37:
C.F. Riggio/A.D. Quam 0FFl0iAL TEST COPY tr..a.=w I!:
/,,3anager, Plans l
Land 0> art?'?-1 Sta...., Ing.
l
-^
(
s 1
AFFROVID T:
Data @/S~d h ManEger, Un.-? me Operations
/ v,. -
.y r.
AUTHC'*" "O FIIM. EM 3Y:
N[/
h d,).
Data M
Land Startup Engineer its? ust Ts IIVIIk"ED IT:
1 ussager, Plant Sea--:e Inre./Mg l 6g. mg,t.
Lead CoerstionsM d
r AF? VID IT:
h:d Manager, heias: Overations 4C - t - g are.d 8T i
/
1 o
i
- ge5,;;J=~
y01A 5 69 sta
~
GARDEB5-59 PDR 4
For Information Only l
g EOR INFO OU Comanche Peak Electric Station
'v Test Summary Report Condenser Vacuum and Water Box Priming 1CP-AT-27-01 STE:
W.J. Turk This test commenced September 23, 1982 and was completed January 25','i~9'83.
Unavailability of the Main Condenser due to Turbine Generator Lube Oil Flush precluded timely accomplishment.
SOP-309A Rev. O was reviewed and is adequate. Overall performance of the system was good.
Problems encountered were:
A.
Non-availability of Main Condenser:
During the entire test period only 1 day was available f or testing.
The majority of this time was used in fixing leaks.
CP1-CVVPMC-02 was out of commission during this period which prevented completion of the test by procedure. TFD's 10, 11 and 12 were written to complete the test by using a Veloseter to measure hogging and holding capability of each pump.
B.
TDR #580 - During conduct of Main Conden,ser Vacuum Breaker Test,-
sn observed value of 3.81n. Hg ABS Vice 1 in. ABS precluded close-out of this section.
Failure to C3,.
obtain vacuum was due to lack of circulating water and unindentified leaks. TDP #3 was written to prove Main Condenser Integrity. The step per TPD #13 was l
performed satisfactory.
There are not open items.
Th System Test Engineer recommends approval of the test as performed.
li 31 Pl System Test Engineer Date 0FFICIAL TESTCOPY eU