k*
NUCLEAR POWER BUSINESS UNIT IT 13
~
h' INSERVICE TESTS MAJOR
~
~
Revision 13 COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 m.
(QUARTERLY)
UNIT 2 RECG A PROCI DU.
LRITIED CURRENI AND CfILCKED fOR TEMPORARY CHANGES. IF rIELD I
Date COPILS RD 41D. USE PDF4026i IAW NP 114 AND DO NOT COMPLETE T1115 BLOCK.
- DSS BY:
DATE:
1
' t.0 L L PURPOSE '
a n
p+
.g.;}6,To perform a quarterly functional test of 2P-11 A&B CC pumps as required by ASME e
Section XL
,1.2 To perform a quarterly full stroke of 2CC-724A&B,2P-11 A&B discharge check valves
. as required by ASME Section XI.
1.3 To perform a quarterly full stroke of 2CC-738A&B, CC to HX-11 A&B RHR heat exchangers as required by ASME Section XI, and annual stroke to satisfy environmental qualification requirements.
1.4 To perform a quarterly non-quantified backleakage evaluation of 2CC-724A&B, 2P-11 A&B discharge check valves as required by ASME Section XI.
2.0 PRECAUTIONS AND LIMITATIONS-2.1 IF TIIERE IS ANY PROBLEM IN PERFORMING THIS TEST, IMMEDIATELY
- NOTIFY THE DUTY SHIFT SUPERINTENDENT. ' OPERATION OF THIS EQUIPMENT IS A TECHNICAL SPECIFICATION REQUIREMENT (15.3.3.C).
2.2 Mir.imum flow required for a component cooling water pump during continuous operation is 100 gpm.
2.3 Flow combinations in the component cooling system' are shown on Figure 1 of OP 6A.
Maximum CC flow rate through a single CC heat exchanger is 7862 gpm.-
I.4 L Care must be exercised when handling the treated component cooling. water because it is 2
- mildly toxic. _ Refer to AOP 12A, " Oil and Hazardous Material Spill," and the WE CHES LManual for the Health llazards of Potassium Chromate.
.' 2.5 The dedicated' operator that is required for 2CC-824A/B is a level 3 dedicated operator.
Upon receipt of a U2 SI signal, the dedicated operator will need to reposition the valve per the local plaque prior to initiating sump recirculation.
9705120222 970505 f
ADon 0500gggi
.Page1of14 CONTINUOUS USE b
4
~
-NUCLEAR POWER BUSINESS UNIT IT 13 c
INSERVICE TESTS MAJOR Revision 13
~
L COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
UNIT 2.
2.'6 During the shifting of CCW pumps, give special attention to CCW system inventory.
The CCW retum relief valves for the RCP's (CC-763A, CC-7638) and excess letdown IfX< (CC-768) have the potential for lifting.
3.0 ilNfflAL CONDITIONS..
7 7
Q l,. NOTEp C Contact an ISTEngineer or OPS Engineerfor new Accept f?
- { crite'ria, iftest is beingperformedfollowing p'unp maintenanceprior jg' ' Q
.p
' ; to returning to service.'
^~
w~
.w.www
? 3.1 :
.This test ii~being performed to satisfy:
1 The normally scheduled callup. Task Sheet No.
4 Post-maintenance operability test for (equip. ID)
W.O. No.(s)
Task Sheet No.(s)
Special test - no numbers Explain INITIALS 3.22. Both Unit 2.CC pumps 2P-11 A and 2P-11B are operable OR this, test is -
. being done to return a pump to service.
l3.3
- The Unit 2 CC system is in operation per OP 6A l 3,4 e Both Unit 1 CC pumps 1P-11 A and 1P-11B are operable for Unit 1 if L Unit I reactoris critical.
3.5
~ The Unit 2 boric acid evaporator is secured.
', 3.6 L L Unit 2 RHR' system is not in op. ration.'
f 3.71 4Two CC HXs are aligned to Onit 2. (Shell side flow): o s,
i
~
.. I,
i a,.,.
1
- 3.81 yThe Plant Process Co_mputer Systein'is' operational and FT619 component s
' ' cooling sNstem flow has besn displayed on trend for the past 20 minutes,
. ~or 2F1-619 component cooling system flow indication is operational.'
s-
\\'
' 3.9 - L Verify the CCW surge tank at atmospheric pressure by opening 2CC-17.-
L Page 2 of14 CONTINUOUS USE e
~
l NUCLEAR POWER BUSINESS UNIT IT 13 INSERVICE TESTS -
MAJOR Revision 13
~'
COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
UNIT 2
(
INITIALS 3.10 CC flow through 2HX-3A&B, non-regenerative liX is as required for one 40 gpm L/D orifice at full power, Note that 2CC-130,2HX-3A&B
. non-regenerative HX flow control valve seat leakage provides sufficient cooling with the valve. shut.
' 3.11 : ; Assemble the following portable test instruments and log their ID numbers here.
- n. m
.. ~,
Vibration monitor Stopwatch 3.12 - Permission to Perform Test The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test.
DSS TIME DATE 4.0 PROCEDURE 4.1 Indicate CC HXs aligned to Unit 2 and record the service water differential pressure (psid).
2HX-12D SW DPIS-4445 HX-12B SW DPIS-2937 HX-12C SW DPIS-2936 4.2 Verify the oil level in CC pumps 2P-11 A and B is at or above M sight glass level.' Contact the DSS / DOS for the type of oil if addition is necessary, i
Page 3 of 14 CONTINUOUS USE L -
--]
6 NUCLEAR POWER BUSINESS UNIT IT 13 i'
INSERVICE TESTS 1
MAJOR Revision 13 O
COMPONENT COOLING WATER PUMPS AND VALVES
. (QUARTERLY)
January 24,1997 U' NIT 2 INITIALS NOTE:
Ifperformingpost-maintenance testing or operability checks when only onepuiny requires testing, then proceed to:
4.30 FOR TESTING 2P-11A ONLY.
~
4.16 FOR TESTING 2P-11B ONLY.
+
+2 NOTE::
Ifperforming normaltesting and 2P-1IB is running, then go to 4.17.
14.3 Operate 2P-11 A for a minimum of 5 minutes.
4.4 ~
Record the as-found position of 2CC-824A,2HX-11 A RHR HX component cooling flow throttle.
Degrees Open.
NOTE:
It shall be the responsibility ofthe U2 control operator to notify the dedicated operator ofthe required action upon the initiation ofa U2 safetyinjection signal.
)
4.5 Assign a dedicated operator to reposition 2CC-324A if required.
Repositioning 2CC-824A to its design Sow position per the local plaque is required on a U2 safety injection.
l-4.6 Unlock and adjust 2CC-824A to 30 degrees open.
' NOTE:.
Observe RCP temperatureshrends during CCsystemflow adjustments.
+
NOTE:
Stroke time is to be takenfrom controlboardindication.
L 4.7 Full stroke test of 2CC-724A and backleakage test of 2CC-724B.
"4.7.1 Position a person locally to observe stroking of 2CC-738A,-
component cooling to 2HX-11 A RHR HX.
4.7.2 Record the stroke' time while opening 2CC-738A.
2CC-738A time to open
. sec.,
Local position indicates full open. (SAT /UNSAT) l I
Page 4 of14 CONTINUOUS USE t
- NUCLEAR POWER BUSINESS UNIT IT 13 INSERVICE TESTS MAJOR Revision 13
~'
COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
UNIT 2 INITIALS 4.7.3 Adjust 2CC-824A as required to attain 3600 to 3700 gpm total-component cooling system flow. Use FT619 (preferred) or-2FI-619, to indicate full stroke of check valve 2CC-724A and
. acceptable backleakage of 2CC-724B.
i f4.8f Record the~ position of 2CC-824A. '
- Degrees Open.-
~
- 3., ~ '
Wa,lNOTEi.;, Indicatedflow willoscillate during thefollowing step. Maintain flow within a band of130 gpm of the reference value.
4 1
4,9 Adjust system flow for test; 4.9.1
. Adjust 2CC-824A as required to attain a system flow from l.
3350 gpm to 3500 gpm.
4.9.2 Adjust 2CC-748A, B/A evap distillate cooler cc throttle valve, l
to attain the reference (mean-average) flow of 3500 gpm.
4.10 Valve in 2P-11 A pump suction gauge 2PI-692A.
4.10.1 Open 2CC-790A.
4.10.2 Open 2CC-691 A 4.11 Record the system data required by Attachment A.'
'4.12 Check operability for A Train components 2P-11 A and 2CC-724 A by -
comparing the. test data obtained in Attachment A, with the limits '
specified in the IST Program Acceptance Criteria prior to proceeding.
NOTE: ' Stroke time is to be takenfrom control board indication.
i4.13' 1 Station an observer at 2CC-738A to check the local position indication,
> then record the stroke time while shutting 2CC-738A.-
'o 2CC-738A time to shut!
sec.
Local position indicates full shut.'. (SAT /UNSAT)
Page 5 of 14 CONTINUOUS USE
4.
NUCLEAR If0WER BUSINESS UNIT IT 13 INSERVICE TESTS MAJOR f
~
Revision 13 COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
- UNIT 2 INITIALS 4.14' Reposition 2CC-824A to its design flow position per the local plaque,'and lock. Lock No.
L4.14.1
- Shut 2CC-748A.
4.14.2 Independent operator verify that 2CC-824A'is'in its design
, flow position per the local plaque, and locked.-
v
, NOTE:h The dedicated operatorfor 2CC-824A is no longer required.
'4.15 ' Check operability for A Train component 2CC-738A by comparing the
' stroke time recorded in Steps 4.7 and 4.13 with the limits specified in the IST Program Acceptance Criteria prior to proceeding.
NOTE:
If2P-11B CCpump test data was takenfirst, or this test is being performed to demonstratepost-maintenance operability ofonly 2P-11A, then proceed to Step 4.32.
NOTE:
If 2P-11B CCpump is running and the auto-start check ofthe pump is deemea unnecessary to prove operability, then proceed to Step 4.17.
- CAUTION
ATTACHMENT A FOR GUIDANCE.
4.16 Check the auto-start of 2P-11B CC pump and secure 2P-11 A CC pump as follows:
4.16.1-Verify 2P-1IB control switch is in AUTO, and check the system flow rate on 2FI-619.'
L4.16.2 -
Place and hold the 2P-11 A control switch in OFF.
4.16.3L Check for 2P-1 IB auto start accompanied by audible indication -
of 2CC-724A' closure within five seconds, and that the system flow rate remains as before.
d a
4.16.4:
Release 2P-11 A control ' witch and allow it to return to' AUTO.
s
~
Verify one CC pump operating and that the system flow rate '
s <
' remains as before.
i i4.16.5;
" Match flags" for the operating CC pump by momen.tarily i
placing its control switch to START.
Page 6 of14 CONTINUOUS USE
NUCLEAR POWER' BUSINESS UNIT IT 13 INSERVICE TESTS -
MAJOR Revision 13 COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
UNIT 2 INITIALS 4.17. Operate 2P-11B for a minimum of 5 minutes.
4.18 - Record the as-found position of 2CC-8248,2HX-1IB RHR HX
. component cooling flow throttle.
Degrees Open.
NOTE:
It shall be the responsibility of the U2 control operator to notify the dedicated operator of,the required action upon the initiation ofa U2
--e
,;,,,,g,, _
4.19 Assign a dedicated operator to reposition 2CC-824B to its design flow position per the local plaque, if required. Repositioning 2CC-824B is required on a U2 safety injection.
l 4.20 Unlock and adjust 2CC-824B to 30 degrees open.
NOTE:
Observe RCP temperatures / trends during cc systemflow adjustments.
NOTE:
Stroke time is to be takenfrom control board indication.
4.21 Full stroke test of 2CC-7248 and backleakage test of 2CC-724A.
l 4.21.1 Position a person locally to observe stroking of 2CC-738B, component cooling to 2HX-11B RHR HX.
4.21.2 Record the stroke time while opening 2CC-7388.
2CC-738B time to open sec.
Local position indicates full open. (SAT /UNSAT) 4.21.3 Unlock and adjust 2CC-824B as required to attain 3600 to 3700 gpm total component cooling system flow. Use FT619 i (preferred) or 2FI-619, to indicate full ' stroke of check valve
. 2CC-724A and acceptable backleakage of 2CC-724A.
4.22 : Record the position of 2CC-8248.
Degrees Open.
Page 7 of 14 CONTINUOUS USE
NUCLEAR POWER BUSINESS UNIT IT 13 INSERVICE TESTS MAJOR Revision 13 COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
~ UNIT 2 L INITIALS NOTE:
Indicatedflow willoscillate during thefollowing step. Maintain flow within a band of130 gym ofthe reference value.
4.23 Adjust system flow for test.
4.23.1 Adjust 2CC-824B as required to attain a system flow from I
3350 gpm to 3500 gpm.
c
..my-4.23.2 Adjust 2CC-748A, B/A evap distillate cooler cc throttle valve,
'[
to attain the reference (mean-average) flow of 3500 gpm.
4.24. Valve in 2P-11B pump suction gauge 2PI-692B.
4.24.1 Open 2CC-790B 4.24.2 Open 2CC-691B 4.25 Record the system data on Attachment B.
4.26 Check operability for B Train components 2P-1IB and 2CC-724B by comparing the test data obtained in Attachment B, with the limits specified
- in the IST Program Acceptance Criteria prior to proceeding.
NOTE:
Stroke time is to be takenfrom control board indication.
4.27 Station an observer at 2CC-738B to check the local position indication, then record the stroke time while shutting 2CC-738B.
r 2CC-738B time to shut sec.
~ Local position indicates full shut. (SAT /UNSAT) 4.28. Reposition 2CC-824B to its design flow position per the local plaque, and lock. Lock No.-
' 4.28.1 -
Shut 2CC-748A.
4.28.2'
' Independent operator verify that 2CC-824B is in its design flow position per the local plaque, and locked.-
Page 8 of14 CONTINUOUS USE
NUCLEAR POWER BUSINESS UNIT IT 13 c
- INSEltVICE TESTS MAJOR Revision 13
_ COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 l
(QUARTEIU,Y)
UNIT 2 INITIALS I
' NOTE:
The dedicated operatorfor 2CC-8248 is no longer required.
4.29 '~ l Check operability for B Train component 2CC-738B by comparing the 1 stroke time recorded in Steps 4.21 and 4.27 with the limits specified in the
. IST Program Acceptance Criteria prior to proceeding.
~
" NOTE:
If2P-11A pump data was takenfirst, or this test is beingperformed ~
to demonstratepost-maintenance operability ofonly 2P-1IB,
-M m~c Step 4.30 is N/A.
, i NOTE:
If 2P-11A CCpump is running and the auto-start check ofthepump is deemed unnecessary to prove operability, then Step 4.30 can be marked N/A.
- CAUTION
- IF THIS IS THE INITIAL START OF THE PUMP AFTER ITS FILL AND VENT, REFER TO OP 6A ATTACHMENT A FOR GUIDANCE.
4.30 Check the auto-start of 2P-11 A CC pump and secure 2P-11B CC pump as follows:
4.30.1 Verify 2P-11 A control switch is in AUTO and check the
. system flow rate on 2FI-619.
4.30.2 Place and hold the 2P-11B control switch in OFF.
4.30.3 Check for 2P-11 A auto start accompanied by audible indication
. of 2CC-724B closure within five seconds, and that the system flow rate remains as before.
Release ' I -11B control switch and allow it to return to AUTO.-
2 i 4.30.4 Verify one CC pump operating and that the system flow rate j
- remains as before.
4.30.5
^ " Match flags" for the operating CC pump by momentarily :
- placing its control switch to START.
4.31-To complete testing of 2P-11 A, go to Step 4.3 if required.
I Page 9 of 14 CONTINUOUS USE 1
f NUCLEAR POWER BUSINESS UNIT IT 13
[
INSERVICE TESTS MAJOR Revision 13 p
COMPONENT COOLING WATER PUMPS AND VALVES Janua~ 24,1997 (QUARTERLY)
UNIT 2 INITIALS NOTE:
Ifonly one pump was tested, then step 4.32 or 4.33 can be marked N/A as appropriate.
I' olate 2P-11 A pump suction gauge 2PI-692A.
4.32:
s n
3.
- 1. 4.32.1 f Shut 2CC-691 A~ -
.e
,u.y
, _ a,+~r4.3 2.2 -
. Sh'ut 2CC-790A-
.4.33 -Isolate 2P-11B pump suction gauge 2PI-6928.
4.33.1-Shut 2CC-691B -
4.33.2 Shut 2CC-790B l
l 4.34 Close the CCW surge tank vent valve 2CC-17, if required.
4.35 Exit the test with the following CCW pump running, or as directed by the DSS.
-2P-11A OR-2P-i1B.
(Circle One)
(1st/3rd QTR)
(2nd/4th QTR) 5.0 ANALYSISL NOTE: - To be completed within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> by Operations manager or'his representative.
5.1. -
Comparisons with allowable ranges of test values and analysis of '
deviations' complete.
5.2 :-. Any requirements for corrective action:
.No Yes
? (If yes, give details in the remarks sectioi); ~
15.3l - Data analyzed by Time and datei Page 10 of14 CONTINUOUS USE
-NUCLEAR POWER BUSINESS UNIT -
IT 13 INSERVICE TESTS MAJOR Revision 13 COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
UNIT 2 REMARKS-l
)
i A
^,y-r f -li a.sr4&!6 m g *
1 4
1 a
N j
1 i
4 4 -
Page 11 of 14 CONTINUOUS USE
NUCLEAR POWER BUSINESS UNIT IT 13 INSERVICE TESTS MAJOR Revision 13 COMPONENT COOLING WATER PUMPS AND VALVES January 24.1997 (QUARTERLY)
UNIT 2 ATTACHMENT A 2P-11 A COMPONENT COOLING WATER PUMP PARAMETERS INSTRUMENT UNITS READING
- CC System Flow FT619 or 2F1-619 gpm 3500 Ref.
2?l-617A psig Pump Discharge Pressure -
Pump Suction Pressure -
2PI-692A '
psig Pump DifferentialPressure Note I psid Inboard Vertical C
Note 2,3 ips Pump Bearing florizontal D Note 2,3 ips Vibration Outboard Vertical A
Note 2,3 ips Bearing llorizontal B Note 2,3 ips j
Axial E
Note 2,3 ips
- CC Surge Tank Level YYLT618 or 2Li-618B
-F
- CC SuctionlleaderTemperature T616 or 2TI-616 l 'Use PPCS address if available. Circle the indication used during the test.
i l
l l
Page 12 of 14 CONTINUOUS USE
NUCLEAR POWER BUSINESS UNIT IT 13 5s INSERVICE TESTS MAJOR Revision 13 COMPONENT COOLING WATER PUMPS AND VALVES January 24,1997 (QUARTERLY)
UNIT 2 ATTACHMENT B 2P-11B COMPONENT COOLING WATER PUMP PARAMETERS.
INSTRUMENT UNITS READING
'CC System Flow ^
. FT619 er 2FI-619 -
gpm 3500 Ref.
7 PumpDischargePressure
- 2PI-617B '
' psig o,
Pump Suction Pressure 2PI-692B.
psig.
,.n...
Pump DifferentialPressure Note i.
psid' Inboard Vertical C
- Note 2,3 ips Pump.
Bearing IIorizontal D Note 2,3 ips Vibration Outboard Vertical A
N0te 2,3 ips Bearing Horizontal B Not: 2,3 ips Axial E
Note 2,3 ips
'CC Surge Tank Level YYLT618 or 2LI-618B
- CC SuctionlleaderTemperature T616 or 2TI-616
'F l *Use PPCS address if available. Circle the indication used during the test.
NOTE 1: Differentialpressure = running pump discharge pressure (2PI-617A/B) minus pump suction pressure (2PI-692A/B).
.; NOTE 2: - Log the identsfication number of the portable instruments.
NOTE 3: Vibration readings are taken at locations A, B, C,' D, and E as shown on Figure 1.
NOTE 4: Bearing temperature data is not required to access pump operability per ASME,Section XI. Ifbearing temperature is required as a post-maintenance test, then the -
temperature monitoringpoint should be as'shown on Figure 1for locations B,'D, F, and
. H. ' Ambient air tempdrature should be measured at approximately onefoot above the
. pump mboar' bearings.-
~d
~
Page 13 of14 CONTINUOUS USE
' i' 1!
zgrm>N. othgzQ* @C aa" i
,ymg< OmywN rt@
e xa5; U nOE6gmzH nh2g,>5 ~ c5* @a g'<O
&=f$e zC>*H$r<>-
s cEH" 38g-0 9
]
I B
A l
I i
g y;f P_
P
)
)
- [F 0
2 2
~_A.<
iBA
=
r
-r.
=
x f !
'o o
PP
,y q ;i2ig t 22 f
f
~ (
(
0
~
E 7
O
= - -
2 0
0 7
9 2
00 97 0
t t
2 a
a B
,N M
I
'n n
A O
e e
T C
k k
U a
a S
t t
)
)
I l
1 e
e BA r
r I
i a
a
- q D'
D".
PP 22
(
(
=
d d
n n
}
00 a
a 97
_d B'
B'
~
2 0
~D C'
e s
s t
t n
n i
i 0
o o
p p
1 H
/e 3
r r
o o
f f
n no o
i i
t t
~
a a
r r
b b
i i,
~
V V
_=
Ns
'0; 6
F aR m kgx OO} 2cOCmC$
a