Text
,a
- ,
- n '
ll 4
DUKE POWER GOMPANY P.O. DOx G3180 CHAMLOTTE. N.C. 28242 HALB. TUCKER TELEPflOME May 31, 1984' Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission-Region II
-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303-Re: RII:WHM/GRW 50-413/84-36
Dear Mr. O'Reilly:
Please find attached a response to Deviation No. 413/84-36-04, as identified in the above referenced inspection report.
Duke Power Company does not consider any information contained in this inspection report to be proprietary.
Very.truly yours, t
Yb f,g/
Hal B. Tucker LTP/php.
Attachment i
cc: NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
Attorney-at-Law l
P. O.-Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21353 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 i
j 8406190380 840611
~
'~
PDR ADOCK 05000413 G
f..
E Response to Deviation 413/84-36-04 Corrective Actions In Duke's letter of. April '14, 1983 to. the NRC/NRR, it' was stated that in. each Reactor Building there are two (2) 150 lb. hydrogen cylinders
?
and associated piping which provides a gas blanket for Reactor Coolant Pump drain tanks.
.The subject cylinders have been relocated to the hydrogen. shed in the plant yard (Ref: letter of clarification dated April-25, 1984.).
An' excess flow valve will be provided in the discharge piping at the' hydrogen shed.
flechanical systems will review pipe routing to assure that if non-seismic pipe were to fail, concentration of hydro-gen in the area would be below 2%.
This complies with the Standard Review Plan.
Also, a pressure test of this QA Condition 3 piping does
. not require QA inspection.
Status Full compliance to be achieved prior to Fuel Load.