ML20138P239

From kanterella
Jump to navigation Jump to search
Rev 2 to Procedure CP-QP-15.3, Quality Engineering Review of Startup Work Permits
ML20138P239
Person / Time
Site: Comanche Peak, 05000000
Issue date: 01/06/1984
From: Tolson R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20138M609 List: ... further results
References
FOIA-85-59 CP-QP-15.3, NUDOCS 8511070014
Download: ML20138P239 (3)


Text

.

o 1

i PROCEDURE l' REVISION l OATE t

ISSUE

{

PAGE TEXAS UTIUTIES GENERATING CO NUMBER CP-QP-15.3 2

JM d ic24

.1 of 3 m

/ _A - /-/3-N PREPARED BY:

7

. #eF QUALITY ENGINEERING

,r)

CATE REVIEW 0F STARTUP v

WORK PERMITS j

APPROVED SY: Y Msv 8

/DriE

-v

1.0 REFERENCES

OLL@ gg 1-A CP-SAP-6, "Startup Work Permit-TR0l. Il0.Q_7 2.0 GENERAL 2.1 PURPOSE AND SCOPE

~

The purpose of this Procedure is to establish a method of receivi ng and processing Startup Work Permits (SWP) originated by TUGC0 Startup.

3.0 PROCEDURE 3.1 SWP ISSUANCE TUGC0 Quality Engineering Supervi sor or designee will receive a copy of the SWP (See Attachment 1) as initiated by TUGC0 Startup, per Reference 1-A.

3.2 QUALITY ENGINEERING REVIEW Upon receiving the SWP, the Quality Engineer shall review the documents and provide applicable QC inspection attributes, hold points, etc. as deemed necessary for the scope of the work. If applicable, the SWP shall then be routed through the Site ANI for ANI hold point speci fications.

The SWP will then be forwarded to TUGC0 Startup,

dich will submi t it to the appropriate construction group for action.

3.3 QUALITY CONTROL INSPECTIONS Upon notification during rewort,

the Quality Control Inspector shall perfonn the required inspections of items, camponents, etc. and doctsnent the inspection results on the SWP.

If applicable, the QC Inspector shall then noti fy i

the Site ANI for inspection of ANI holdpoints.

i

'l TUGCC CA B511070014 851016 PDR FOIA GARDE 85-59 PDR

PROCEDURE ISSUE REVISION PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.

!CP-QF-15.3 2

fJAN 6 1554 l 2 of 3 l

i 1

1 3.4 F1NAL PROCESSING Upon completion of all operations described on the SWP, TUGC0 Startup shall forward the original to TUGC0 Construction QA for processing and storage in the records vault.

I i

f i

i I

l ruoco ca

,,,,,,3.

l PROCEDURE REVISION ISSUE NUMBER DATE PAGE TEXAS UTILITIES GENERATING CO.

}

CPSES JAN e sg4 3 of 3 CP-QP-15.3 2

ATTACHMENT 1 CCNSTRUCTION CPERAT!CN TRAVELER 35-4895

@ TRAVELER NC.

ECUIP%eENT NO.

UNIT No.

CUgiTY paat_c P_

b

    1. 3 eesreue tierk o.mt e ae,.

,,tey=

@SPECJPH)C/ D#i lNSTR.

@ LCCAT CN g5YSTEM PREPARED SY QATE CEPT, TUCCO Startup REVIEWED BY DATE SafetT '" s "

- ANI REvtEW DATE 3'**3858CI D$--

GA/QC OA Inc. CEPT CPUATION CONETR EMS.

_A M l Safety Tags have been placed as specified by Startup Safety Tag Authorization No.

S ama e.@

M M 9

i I

e i