BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE h

CCP-30A 3

12/06/83 1 og 13 TITLE:

GRIGINATOR

/~

.' 1

// N M ?

i V

'Date COATING STEEL SUBSTRATES

-rs dNMr er /

3 INSIDE REACTOR BUILDING REVIEWED BY:

_ / t-ut

& RADIATION AREAS

~~

QA/Qg/

'Date O-I-I3 APPROVED BY:

//<t

  1. 4 CONSTRUCTION PROJECT MGR Data j

o.1 TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 PURPOSE I.2 SCOPE 1.3 CENERAL DISCUSSION 2.0 DEFINITIONS OF TERMS ABBREV 0ATOPMS AND SYMBOLS 2.1 TERMS 2.2 ABBREVIATIONS 2.3 SYMBOLS 3.0 SPECIAL ITEMS AND OPERATIONS 3.1 QUALIFICATION OF PERSONNEL 3.2 SAFETY REQUIREMENTS 3.3 INSTRUMENTS AND THEIR USE 3.4 DOCUMENTATION 3.5 RECEIVING, STORING AND DISPENSING OF COATING MATERIALS 3.6 SPECIAL COATING PROCEDURE 3.7 TOUCH-UP & FINISH COATING OF VENDOR APPLIED COATINGS 4.0 PROCEDURE FOR COATINC 4.1 PREPARATION OF SUBSTRATES AND COATING MATERIALS 4.2 SURFACE PREPARATION FOR FINISH COAT 4.3 PREPARATION OF COATING MATERIALS 4.4 APPLICATION OF PRIME AND FINISH COATING 4.5 FINAL ACCEPTANCE TESTING 4.6 HOLD POINTS 5.0 SUPPORTING INFCletATION 5.1 ATTACHMENTS g@il s

0D11040474 051016 DE

.>9 PDR h

I BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE 1:

l i

i CCP-30A 3

12/06/83 2 of 13

1.0 INTRODUCTION

l.1 PURPOSE 1.1.1 The purpose of this procedure is to establish an alternate prime coat system utilizing existng topcoat system. Coatings shall be applied to the containanet liners and radiation areas in accordance with specifi-cation, drawing, and manufacturer's requirements. This procedure may also be used for coating any steel substrate inside the reactor buildings scheduled to receive primer or Dimetcote 6 and Phenoline 305 finish coat manyfactured by Ameron and Carboline respectively.

1.2 SCOPE l.2.1 The scope of this procedure covers the surface preparation and coating of Unit 1 and 2 steel substrates inside the reactor buidlings and radiation areas seeduled to receive protective coatings.

1.3 GENERAL DISCUSSION 1.3.1 All coating materials covered by this procedure shall be as manu-factured by Carboline Corporation of St. Louis, Missouri or Ameron Protective Coatings Division, Brea, California. The coating system will consist of a prime cost of Dimetcote 6 by Ameron with a finish coat of Phenotine 305 by Carboline.

In order to protect the prime coat from prolonged enposure, a " seal coat" consisting of approximateLy one mil. of Phenotine 305, thinned in accordance with Section 4.4.2.4.,

may be applied over the prime coat. Surface preparation of the seal coat prior to finish coating, shall consist of solvent wiping if exposed longer than 30 days. Finish coating shall be applied when convenient prior to completion of the building --- or, prior to placement 'f con-o crete, equipment, or obstructions which would make finish coating im possible.

In order to maintain traceability on protective coatings applied to shop coated steel cited for installation in the Reactor Building, these items shall be steel stamped with a unique coating code number. The code numbers shall be assigned by QC Paint and applied by craf t personnel. Upon division of materials, this unique number will be transferred along with all other unique identifying numbers.

l 2.0 DEFINITIONS OF TERMS 2.1 TERMS 2.1.1 Substrate - The uncoated surface to which a coating is applied.

r M

, em -

. m.

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE

~

l CCP-30A 3

12/06/83 3 of 13 2.2 ABBREVIATIONS 2.2.1 (NONE) 2.3.

SYMBOLS 2.3.1 (NONE) 3.0 SPECIAL ITEMS AND OPERATIONS 3.1 QUALIFICATION OF PERSONNEL 3.1.1 Coating application personnel shall be qualified per previous ex-perience and practical application.

In addition, each painter shall have been instructed by the Paint Superintendent or his representative in the use of the products as consistent with Carboline's training procedures,which includes both classroom. instruction and a field application demonstration. This shall be verified by completing a form similar to Attachment 1.

This form shall be executed by the Brown & Root Paint Superintendent or his representative. A coating manufaccruer's representative will be available for technical super-vision upon initial painting ef fort. Applicators performing work to shall be qualified for "Q" coatings when applicable.

3.2 SAFETY REQUIREMENTS 3.2.1 All appropriate health, safety, and fire protection requirements, pertaining to surface preparation and coating application, shall be followed.

It shall be the responsibility of the Site Safety Department to establish the frequency of monitoring the coating work.

3.3 INSTRUMENTS AND THIER USE 3.3.1 The painting Foreman and General Foreman shall have access to and be familiar with the use of all instruments necessary to insure efficiency of coating applications. This shall include suface profile comparators, holiday detectors, thermometers, and wet and dry film gauges. Viscosity measuring devices will not be used.

Wet film gauges will be randomly used during coating application as an aid to field personnel on Phenoline 305 only. Readings will be limited to the minimum necessary to control coating thickness.

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE 7

CCP-30A 3

12/06/83 4 of 13 3.4 DOCLHENTATION 3.4.1 Records shall be maintained on Attachments 1 and 2 listed in Section 5.1.

Af ter completion, each form shall be forwarded I

to the Brown & Root Document Control Center for filing and distribution to the various parties as listed on the distri-bution sheet.

3.5 RECEIVING, STORACE AND DISPENSING OF COATING MATERIALS 3.5.1 Receiving and Storage - Upon receipt of a shipment of coating materials, the B&R QC Representative accepting shipment shall be responsible for completing all necessary receiving inspection documentation. General receiving procedures shall be in accor-dance with Brown & R0ot Construction Procedure CP-CPM 8.1.

It shall then be segregated from Non "Q" materials and stored in the paint storage building where temperatures will be maintained be-tween 45' - 110*F.

Inf requent dips in air temperature in storage areas as low as 32*F for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are acceptable. Tempo rary storage may be required at the receiveing warehouse due to re-ceiving or other problems.

3.5.2 Dispensing - When coating materials are needed, in the field, it shall be transferred from the controlled area to a designated tegporary storage area or area of intended use in the field. Due to limited shelf-life of coating materials, this shall be done on a " firs t-in", " firs t-out" basis. After materials have been partially used form an individual container, the said container cannot be resealed and returned to "Q" storage area for later use. Containers opened and partially distributed from the "Q" paint storage area may be resealed and the remaining contents used for "Q" painting. With the exception of thinners, the con-cents from partially used containers shall not be reused af ter a perod of 7 days has elapsed from date of initial opening.

3.6 SPECIAL COATING PROCEDURE 3.6.1 When items require special coating not covered under the content of this document, the appropriate Project Engineer (Mechanical, Cive, Electrical) shall complete Attachment 2 and transmit it to the Paint Superintendent. A log of all pecedures from shall be maintained by the Site Coating Engineer.

The following information shall be compelted on each procedure.

_-Ji;;;.

BROWN & ROOT, INC.

PROCEDURE EFFECTIVZ CPSES NUMBER REVISION DATE PAGE l

CCP-30A 3

12/06/83 5 of,13 3.6.2 Each procedure shall be given a unique number. The scope will describe the working limits of the procedure with detailed work requirements being listed uner the requirements section.

The approvals section shall have signatures of the following:

Project discipline Engineer (Mechanical, Civil, etc..), TUCCO Quality Engineering if coating of item is safety related TUSI representative when required, Engineer who prepared document, and a revision number and date. Upon completion of the document, distribution shall be made to all holders of this procedure.

3.7 TOUCH-UP FINISH COATING OF VENDOR APPLIED COATINGS 3.7.1 Prior to touch-up of primer or application of topcoat an adhesion test shall be performed by the Brown & Root QC Department.

If results are acceptable, work may proceed in accordance with sections 4.4.2.2 through 4.4.2.9.

3.7.2 The QC Inspector or his represnetative shall notify the responsible area engineer and/or the Paint Superintendent as soon as possible af ter receipt of a non-conforming item in need of paint repair to allow time for Attachment 2 preparation and a planned schedule for repair.

4.0 PROCEDURE FOR COATINC 4.1 PREPARATION OF SUBSTRATES AND COATING MATERIALS 4.1'.1 Surface Preparation for Primer - Final surface preparation shall not begin unless the teeperature of the surface to be blasted and/or power tooled if 5'T above the dew point.

If needed, the surface to be primed shall then be cleaned of any heavy oil or grease deposits in accordance with SSPC-SP-1-63 " Solvent cleaning". Small amounts of grease or oil deposits may be removed by blast operations. The vurface shall then be cleaned by blast, hand or power tool operations to achieve a surface cleanliness equal to SSPC-SP10-63, "near white" blast cleaning.

Al-though 1-3 mil. surface profile is preferred, a minimum of 1 mil. pro-file is required. Af ter the above surface preparation, the surface to be primed shall be air blasted and/or solvent wiped to remove dust, sand or foreign contaminants from the surface. Air blasting shall not be performed where air-borne contaminants could adhere to tacky paint. Sufficient time shall be provided to allow suspended particles to settle before beginning primer application.

If rust forms after i

surface preparation, the rusted area shall be recleaned before prime l

application. Under no case shall a blast hand, or power tool cleaned surface be exposed for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to priming without l

additional cleaning of the surface. When applying coatings that will l

be joined together by a later coating operation, the interface shall l

be constructed as follows:

l

,E '

m--.,,--

- - - +

_,.-p--

y.,.

,7

,.m,.__

y-

_-.-m..._e,

..p,

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE j

l CCP-30A 3

12/06/83 6 of 13 a.

Blasting using no border tape - Overblast the steel to near white metal approximately 12" - 18: beyond the point which will receive primer.

Hold back approximately 12" - 18" from edge of blasted area when applying primer.

b.

Blast, hand or power tool cleaning using border tape - Clean the steel to near white metal approximately 3" - 6" beyond the point which will receive primer. Place border tape approximately 1" in from the edge of cleaned area and prime. When applying seal or finish coat on either of above method hold back approximately 12" - 18" from edge of primer.

4.1.2 Removal of weld spatter and other minor surface inperfections (not to exceed.031" for containment liners) - If needed, weld spatter oritted by others will be removed by Painting Personnel in accordance with SSPC-SP-2 and SSPC-SP-3.

It if is determined that surface defec'.s are ever enough to require later repair, the area to be repaired will be blocked out and spot painted at a later date. All protrusions and peaks shall be ground to arounded contour.

4.1.3 If coating removal is required from an area or item which has praviously been coated in accordance with this procedure, shadows or light residue of prime which may remian in the profile of the previously prepared sub-strate is acceptable. However, areas with residues of Carboline 191 Primer shall be recoated with Carboline 191 Primer. Areas with.esidues of inorganic sinc may be coated with either inorganic zine or Carboline 191 Primer.

It is not required that such areas meet the critoria' of SSPC-SP-10 or SSPC-SP-6.

4.2 SURFACE PREPARATION FOR FINISH COAT 4.2.1 Surface preparation for the finish coat shall consist of the removal, if needed, of any oil or grease. This shall be accomplished by the use of a manufacturer recommended cleanser or cleansing method on areas that have been seal-coated. On areas where the inorganic sinc primer is ex-posed, oil and grease will be removed by sand blasting, hand, or power tool grinding, and needle scaling and then by solvent wiping the area prior to replacing the primer. Power tool grinding and needle scaling should yield surface cinan11 ness equal to that of SSPC-SP-10 "near white" blast cleaning. Power tooled areas should be kept to a minimum however no size limitation is imposed provided acceptable surface cleanliness is achieved.

4.2.2 The ambient temperature and relative humidity shall be measured to I

determine the dew point tempe ra ture.

Phenoline 305 finish shall not bw applied unless the substarte temperature is 5'F or more above the dew point.

I I

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE l

CCP-30A 3

12/06/83 7 of 13 4.3 PREPARATIONOFCOATINGMATERIA$S

4. *.1 Primer - The primer, Dimetcote 6, is packaged in a two component kit 5

consisting of a base and zine filler. The base shall be thoroughly mixed first.

Zinc filler shall then be added under constant agitation and mixed until free of lumps. Partial mixes shall be mixed by weight in a proportion of 6.4 parts base to 15 parts zine filler using a suitable scale to achieve a 2 2% accuracy. The mixture shall then be strained through a 30-mesh screen. Viscosity shall be controlled by adding thinner as required up to the maximum allowed by the latest revision of Dimetcote 6 application instructions.

Primer coat shall be reddish gray.

Pot life of Dimetcote 6 shall be 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.3.2 Finish Coat - The finish coat consists of carbolines Phenoline 305, to which is added a catalyst. This shall be thoroughly mixed while combining in a ratio by volume, of four parts Phenoline 305 to one part catalyst; the finish color shall be as required by the governing specification. Viscosity centrol shall be accomplished by adding thinner as required, but shall not exceed to quarts of thinner per gallon of Phenoline 305.

Pot life for finish coating shall be in accordance with Attaahment 3.

4.4 APPLICATION OF PRIME AND FINISH COATING 4.4.1 Prime Coat; (Ameron Dimetcote 6) 4.4.1.1 Coating material shall be applied using conventional spray equipment with agitated pressure pots having a maximum hose length of 75 feet.

The primer shall be allowed to become tack free before start of other construction operations which could create contamination problems.

Any runs or sags having a detrimental effect on the coating system shall be removed and repaired. The following application parameters shall also be followed:

1.

Normal conditions of ambient and surface tenperature shall be 40*

- 120'T and 40' - 130*F respectively; however, primer may be applied within an ambient range of O' - 130'F and a surface temperature range of 0* - 200*F.

Under other than normal conditions, it may be advisable to use more thinner to reduce dry spray.

If surface temperature is above 85'F it is advisable to use between 1 pint and 2 quarts of Amercoat thinner #101 per gallon of Dimetcote 6 to get wet application.

2.

Humidity values vary from 0 to 95% however, coating shall not be applied to a wet or damp surface.

l l

l

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION

~DATE PAGE CCP-30A 3

12/06/83 8 of 13 3.

Thickness of prime coat sha'11 be a minimum dry film of 2 mils and a maximum of 5 mils. Minimum sopt test values shall be 1.5 mils and 5.5. mils respectively.

4.

A double regulated pot having an adequata air volume supply shall be used.

5.

As a guide, coating material may be applied using a 50% overlap with each pass while holding a gun 8 - 10 inches from the surface.

Cross hatch application is permissible.

6.

Curing time shall be as follows, depending upon approximate surface temperature and relative humidity conditions:

CURING TIME TEMPERATURE WITH OVER 50% R.H.

BEFORE TOPC0ATING 40 - 99" 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 100* and above 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 10TE:

When water curing, below 40*F, and/or below 50% R.H.,

rely on " coin test" method for determining cure. " Coin Test" is defined as: the coating is sufficiently cured for topcoat 3

when the coating may be burnished rather than removed when rubbed with the flat portion of a coin such as a nickle.

If required, the cure of Dimetcote 6 may be accelerated by use of water spray after allowing at least one hour cure after application. This shall be done as of ten as required using clean water having a pH range of 6 ot 8.

If used, a filter system will be installed in order to assure proper clean 11 ness of the curing water.

4.4.1.2 Recoating of Didetcote 6 Primer - Surface shall be free of all oil, grease and other contaminants.

(Remove oil or grease per Section 4.2.1)

A wash down with tTrisodium Phosphate (T.S.P.) or detergent, using a stiff briatie brush, followed by flushing with fresh water is required.

Do not solvent wipe the surface as a final cleaning method. If no major defects as defined in section 4.4.2.9 are present, and the primed surface to be recoated is cured and prepared in accordance with this procedure, recoating may be performed.

4.4.1.3 Repair of Sags and Runs - Sags or runs in excess of 5.5 mils will be abraded with an aluminum seren or sandpaper to 2.0 to 5.5 mils. Sags or runs 5.5 mils or less which show ho evidence of muderacking will not be repaired. If coating surface is satisfactory af ter abrading, then Carbo-lines finish coat may be applied; however, if coating surface is unsatis-factore, blast, hand abrade or power tool grind to near white metal is required and primer ceat re-applied. A satisfactory coating is considered one having no mudcracking to the metal surface as visible to the unaided

eye, i

]

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE l

CCP-30A 3

12/06/83 9 of 13 4.4.1.4 Brush touch-up painting shall be 'done on the prime coat in accordance with the following:

Prime Coat:

1.

Dimetcote 6 application instruction R 11-78.

Max, allowable touchup - 144 square inches.

2.

Dimetcote 6 Product bulletin R 6-79.

4.4.1.5 Repair of Contamination - Contamination shall be removed by abrading.

If low millage or " major" defects result, recoat or repair per section 4.4.1.2 or section 4.4.2.9 respectively.

4.4.1.6 Treatment of Stains - Remove residue, though not necessarily the stain with a bristle brush and water or Carbo 11ne Thinner #33 or Amercoat #12 cleaner. Allow to dry thoroughly.

4.4.1.7 Coating Interface - Refer to Section 4.4.3.0 for coating interfacing.

4.4.2 Finish Coat: Carboline, Phenoline 305 4.4.2.1 Finish coating shall be applied using conventional, airless, brush or roller. Weld seams, edges and other sharp geometrical discontinuities may receive an initial coat of 1-2 mils finish coating thinned by using two quarts Phenoline Thinner per each gallon kit of Phenoline 305. To aid in continuity at edges, edges may be " striped" with Phenoline un-thinned instead of the 50% mixture as stated above. In either " striping" or initial coating of edges, welds, etc., time should be allotted for the coating to harden sufficiently to maintian a " sealing" effect prior to continuing coating operations.

The. initial coating of edges, striping, etc., as state above, shall be considered part of the total initial finish coating operation. The material shall be allowed to become tack free before any other construction operations proceed which could create contamination problems by dust or other foreign matter. A continuity check shall be performed in accordance with NACE T-6F-3 Condition "C".

No gross discontinuities are acceptable such as holidays, voids, skips, bubbles, and misses. Any runs or sags having a detrimental effect on the coating system shall be removed and repaired. The following application parameters shall govern:

1.

The permissible range of surface and ambient temperature for application shall be 50' - 120*F.

After the material has become

" tack free", temperatures may rise above 120*F.

Phenoline 305 may be thinned up to 2 quarts of Phenoline Thinner per gallon mix.

The ratio of thinner to Phenoline will be that which gives the best workable mix, i.e., usually advantageous to use more thinner at lower temperatures.

-WryT m

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE l

CCP-30A 3

12/06/83 10 of 13 2.

Minimum and maximum values of relative humidity shall be 0% and 85% respectively.

3.

As a guide, coating material shall be applied using a 50%

overlap with each pass while holding the gun 8 10 inches from the surface.

4.

Curing and time to recoat Phenoline 305 shall be as shown below:

Between Coats Temperature 'F Final Cure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 50 59 12 days 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 60 74 8 days 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> 75 89 4 days 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 90 and above 2 days Fhenoline thinned at 50% and applied as a seal coat may be recoated after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of cure at or above 75*f.

5.

Tack free shall be defined as the extent of cure at which foreigh contaminants will notadhere to the coating.

6.

The total coating system shall have an average dry film thickness range of 7 - 11 mils with a minimum spot check of 7 mils and a maxi =um spot check of 11.5 mils.

4.4.2.2 Repair of Runs and Sags Runs and sags will be abraded until the DFT of the Phenoline 305 is within 1.9 4.5 mils. If cracks are visible, then runs and sags will be removed to primer by power tool grinding followed by solvent wiping.

If no cracking accurs, topcoat will be considered acceptable. Refer to Section 4.4.2.1(4) for cure to recoat t ime.

4.4.2.3 Repair of Contamination - Contamination shall be removed by abrading and then recoated as outlined in the repair of pinholes and di-scontinuities. Refer to Section 4.4.2.1(4) for recoating times.

4.4.2.4 Repair of Pinholes and Discontinuities - Loose particles shall be removed by brushing or vacuum. The entire area shall be solvent wiped using Phenoline 305 Thinner and recoated using thinned down Phenoline 305 consisting of two quarts Phenoline Thineer per each gaoolon kit of Phenoline 305 applied at approximately 1 - 2 mils DFT.

(See Section 4.4.2.1(4) for recoating tLme.)

9

i BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE I

CCP-30A 3

12/06/83 11 of 13 4.4.2.5 Repair of Scratches and Damaged Areas - Any scratches or damaged areas will be abraded until loosely adherent particles are removed. The area vill then be solvent wiped (Amercoat 12 cleaner for primer, Phenoline Thinner #305 or Xylol for topcoat) and repaired with appropriate coating, i.e., Phenoline 305 if damage doesnot extend to primer; Dimetcote 6 and Phenoline 305 if primer is damaged (if area is considered a major defect). Thickness shall be as required for the pertinent coating. If damage extends to metal and is considered a major defect (Refer to Section 4.4.2.9), damaged area will be blasted, hand or machine ground until bare metal is exposed. All edges of existing coating around perimater of cleaned area shall be feathered back a sufficient amount to ensure a smooth blend with existing coating.

4.4.2.6' Brush touch-up painting shall be done on the finish coat in accordance with the following :

1.

Carboline Application Instruction (Phenoline 305) Bulletine 775.

2.

Carboline Product Data Sheet (Phenoline 305 Primer and Finish)

Bulletin 473. Brush touch-up and complete application is

-~s allowed with no area restrictions.

4.4.2.7 Treatment of Rust Stains - If the finish coated surface is contamicated with rust stains or minute metallic particles, the surface shall be

, solvent wiped with Phenoline 305 Thinner or Xylol and overcoating with

__, a coat of Phenoline 305 prepared in accordance with section 4.4.2.4.

4.4.2.8 Repair of Topcoat and/or D-6 Minor Defects - (Minor defects are

' defined as an area, either circular or linear, in which a h" diameter

- circle could not be completely inscribed at any point along the entire length.) Blast or abrade, by machine or hand, the Phenoline 305 finish

~ ~ _ _ -

surrounding the damaged area and clean any exposed steel to ensure contaminant free surface. Solvent wipe the surrounding 305 finish with Carboline's Phenoline Thinner or Xylol. Spray or brush Phenoline 305 finish at approximately 4 mil DFT over the damaged area. Overlap onto the surrounding coating a sufficient amount to insure a smooth and continuous topcoat system.

4.4.2.9 Repair of Phenoline 305 Topcoat and/or Dimetcote 6 Primer Major Defects - (Major defects are defined as an area, either circular or linear, in which a " diameter circle could be completely inscribed at any point or along the entire length.) Spot blast or abrade, by machine or hand, the damaged area. Power tool or hand abrading must be very thorough in order to prepare the surface for Dimetcote 6 couch-up. The surface shall not be polished by wire brushing or other means.

l[:2fi l I

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE CPSES NUMBER REVISION DATE PAGE CCP-30A 3

12/06/83 12 of 13 4.4.3.0 Coating Interface - At coating interface for finish and/or primer coat, the existing coating shall be " feathered back" a sufficient distance to ensure a smooth final coating system. When performing coating interfacing the interface of the coatings or systems shall be' a maximum of approximately 1h inch in width. Within the inter-face area, overlapping of any materials or systems is acceptable.

4.4.3.1 Cure of Minor Topcoat Repair - Minor defects, as defined in Section 4.4.2.8, which are noted in the topcoat and repaired, may be inspected for final acceptance af ter cure to recoat time as stated in Section 4.4.2.1(4) has been satisfied. full cure to topcoat reapirs shall be satisfied prior to placement into srvice.

4.5.

FINAL ACCEPTANCE TESTING 4.5.1 Final acceptance inspection may be performed af ter a minimum topcoat cure of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and cure for recoat time as state in section 4.4.2.1 paragraph 4 is satisfied.

Touch up of minor defects, as described in section 4.4.2.8 of this procedure may be done at time of final inspection without later reinspection of the repair.

Af ter final inspection and resolution of all discrepanciew are completed the QC inspector shall document the final acceptance by completing and signing the final acceptance record. A copy will then be transmitted to the B&R Paint Superintendent as soon as possible af ter final accept-ance is made.

4.6 HOLD POINTS 4.6.1 Onsite receipt of coating materials.

4.6.2 Substrates before and following surface preparation.

4.6.3 Mixing and preparation of coating material for application.

4.6.4 Film characteristics after drying and curing.

4.6.5 Control of ambient conditions and surface temperatures during all phases of the coating work.

l 21:2Ei__1

.i

BROWN & ROOT, INC.

PROCEDURE EFFECTIVE.

CPSES NUMBER REVISION DATE PAGE i

CCP-30A 3

12/06/83 13 og 13 5.0 SUPPORTING INFORMATION 5.1 ATTACHMENTS 1.

Painter Qualification Record 2.

Special Coating Procedure 3.

Pot Life Phenoline 305

5.2 REFERENCES

1.

Gibbs & Hill Specification 2323-SS-14,

" Containment Steel Liner", latest revision 2.

Steel Structures Paint Council, Volume 2, Second Edition 3.

Carboline Corporation " Application Instruction",

October 76-N Revision and 473, latest revision 4.

Ameron Protective Coating Division Dimetcote 6

" Application Instructions". R 11-78, Dimetcote 6 Production Bulletine R 6-79 5.

Gibbs & Hill Specification 2323-AS-31,

" Protective Coatings", latest revision 6.

Gibbs & Hill Specification 2323-MS-101,

" Equipment. Erection", latest revision 7.

Gibbs & Hill Specification 2323-MS-43B,

" Nuclear Piping", latest revision 8.

Gibbs & Hill Specificati6n 2323-MS-44B, "Non-Nuclear Piping" 9.

Gibbs & Hill Specification 2323-MS-100,

" Piping Erection" 10.

Gibbs & Hill Specification 2323-SS-17,

" Miscellaneous Steel", latest revision

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 3

12/06/83 1 of 2 ATTACHMENT 1 BROWN & ROOT, INC.

COMANCHE PEAX STEAM ELECTRIC STATION o

~

Painter Qualification Record GENERAL DATA Data Report Number TECHNICAL DATA Name of Painter Sumary of Field Experience Experience with Following Product Types Application Test for Specified Substrate Additional Qualifications (School)

Signature Distribution: Painting Supt.

Q.C. Decarment Tugco QA Vaul (Originah J_- }

I BROWN & ROOT, INC.

~ PROCEDURE EFFECTIVE NUMBER REVISION DATE~

PAGE CPSES JOB 35-1195 CCP-3@

3 12/06/83 2 of 2 ATTACFNEAT 2 "Q" Coating Sheet of Procedure #

"Non-Q" Coating Rev.

Date SPECIAL C0ATING PROCEDURE NO. _

SCOPE REQUIREMENTS:

REFERENCE DOCUMENTS APPROVALS PDE QA/QC TUSI ENGINEER REV.

DATE:

~

$5

l PROCEDURE EFFECTIVE I

l BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES CCP-30A 3

12/06/83 1 of 1 l

ATTACHMENT 3 POT LIFE PHENOLINE 305 TEMPERATURE (*F)

UNTHINNED THINNED-50%

50-54 10 hrs 24 hrs l

55-59 7 hrs 24 hrs 60-64 4 hrs 24 hrs 65-69 3b hrs 24 hrs 70-74 2 hrs 24 hrs 75-79 lb hrs 24 hrs 80-84 1h hrs 24 hrs 85-89 1 hrs 24 hrs 90-95 1 hrs 24 hrs Pot life stated above for unthinned coatings are the recommended times and should be utilized as a guideline for coating usage time, however, actual pot life may be longer. For unthinned coatings or coatings thinned 50% or less, actual pot life is determined by the applicability of the coating.

l l

I I

I gm.

8

.__ A_

E ARMS

.i BROWN & ROOT, INC.

PROCEDURE y

y CPSES NUMBER REVISION v ic PAGE JOB 35-1195 UAN l

CCP-30 A 1

11/11/81 i

1 of 13 TITLE:

ORIGINATOR:

[M dN /

//-/,- f- /

^

. ((f COATING STEEL REACTOR BUILDINGS v

qq >,

J

// 'h'O '

SUBSTRATES INSIDE REVIEWED BY:

/ /<

DATE AND RADIATION AREAS 4e

/eV2/[9/

APPROVED BY:

v CONSTRUCTION PROJECT MANAGER CATE DCA! NI o.1 TABLE OF CONTENTS g

g

1.0 INTRODUCTION

O CA, 3

/

1:1 Es;"

=7 1.3 GENERAL DISCUSSION E#I 2.0 DEFINITIONS OF TERMS, ABBREVIATIONS AND SYMBOLS 2.1 TERMS 2.2 ABBREVIATIONS 2.3 SYMBOLS 3.0 SPECIAL ITEMS AND OPERATIONS 3.1 QUALIFICATION OF PERSONNEL 3.2 SAFETY REQUIREMENTS 3.3 INSTRUMENTS AND THEIR USE 3.4' DOCUMENTATION 3.5 RECEIVING, STORING AND DISPENSING OF VENDOR APPLIED COATINGS 3.6 SPECIAL COATING PROCEDURE 3.7 TOUCH-UP & C0ATING 0F VENDOR APPLIED COATINGS 4.0 PROCEDURE FOR COATING 4.1 PREPARATION OF SUBSTRATES AND C0ATING MATERIALS 4.2 SURFACE PREPARATION FOR FINISH C0AT 4.3 PREPARATION OF C0ATING MATERIALS 4.4 APPLICATION OF PRIME AND FINISH C0ATING 4.5 FINAL ACCEPTANCE TESTING 4.6 HOLD POINTS 5.0 SUPPORTING INFORMATION 5.1 ATTACHMENTS

5.2 REFERENCES

r~

aug INDEXED JOB 35-1195 Comanche Peak Steam Electric Station Sheet 1 of 2 Construe:fon Procadure 5

00CLHENT CHANGE NOTICE NLHBER This notice applies to Construction Procedure No. 35-1195-CCP-30A Revision 1

This change will be incorporatad in the next revision of the procedure.

Change the procedure as follows:

Replace the following page with the attached:

Page 6 of 13 Reason for change:

Additional requirement Reviewed by:

[ /M d

4 Opginator f4te arewn & Rect Quali:y Assuranca Casa __

Revd f

(

l g,, -[l }g,g,

/

L Approved by:

yg da utur.n 5-f /- V2 -

5/11/82 Construc :en Pre;ect. Manager Ca:a Eff ective Ja a N'-

,.~-.,y 7

.n..n Mnma INDEXED JOB 35-1195

%1h Comanche Peak Steam Electric Station Sheet 1 of 2 Construction Procacure DOCUMENT CHANGE NOTICE NUMBER 4

This notice applies to Construction Procedure No. 35-1195-CCP-30A Revision 1

This change will be incorporated in the next revision of the procedure.

4 Change the procedure as follows:

Replace the following page with the attached:

Page 5 of 13 Reason for change:

Additional requirements Reviewed by:

k, DEJ l-l6-?2

/j/# W 784//i*-

Originator Ca:e drown 3-Rect quai t:y Assurance Date Revie' d by:

Approved by:

" ^" g 2

T::GC0 Quali:y Asspang Dace

/. ham /

2-/7-9 '-

2/17/82 Construction Pro;ect.vanager Oate Effective Oa

a n

.n nama INDEXED JOB 35-1195 M4 Casanche Peak Steam Electric Station Sheet 1 of 3 Construction Procedure DOCUMENT CHANGE NOTICE NUMBER 3

This notice applies to Construction Procedure Nc. 35-1195-CCP-30A Revision 1 This change will be incer; crated in the next revision of the precedure.

Change the procedure as follows:

Replace the following pages with the attached:

Page 9 of 13 Page 10 of 13 Reason fcr change:

Additional requirements This change approved by:

Reviewed by:

$dbk/8J

/-23-9Z Y b

/-2562 Or1ginatcr Date

/ irewn & Rocc quality Assurance Gate Revie d by:

"4'-

  1. '2 ME Approved by:

TUGCO Quality Assupineg/

Data t

A

/ _*

61A dd{'EVVD llSOl02 Construc:1cn Project Manger Jate iffec:1ve Ja:e

'1

~'

popg lilDEXED JOB 35-1195 Comanche Peak Steam Electric Station Sheet 1 of 3 Construction Procedure DOCUMENT CHANGE NOTICE NUMBER 2 This notice applies ta Construction Procedure No. 35-1195-CCP-30A Revision 1

This change will be incorporated in the next revision of the procedure.

Change the procedure as follows:

Replace the following page with the attached:

Page 10 of 13 Page 11 of 13 Reason,for change:

CHANGE IN RECUIREMENT This change approved by:

Reviewed by:

7%A odh ll-M4l

& 37b "A&!

Or1ginator Date Brown & Rocc Quality Assuranca Cata

/.[/ - r

/

Revie d

i

/ ' ' > /

Reviewed by:

TUGC0 Qualtty' Assurance Date O. Sq,,,4

^' Up e -

11/19/81 Construc: ton PrcJect Manager Oate Effec:1ve Data

ARMS IfiDEXED JOB 35-1195 Comanche Peak Steam Electric Station Sheet 1 of 3 Coastruction Procedure DOCUMENT CHANGE NOTICE NtlMBER 1 This notice applies to Construction Procedure No. 35-1195-CCP-30A Revision 1 This change will be incorporated in the next revision of the procedure.

Change the procedure as follows:

Replace the following pages with the attached:

Page 9 of 13 Page 12 of 13 Reason,for change:

Additional requirements This change approved by:

Reviewed by:

??dd Ok n-n-ri de Ahc shk Or196nator Date arown Hoot QuaTity Assurance Date R

d by:

/

8/&St Reviewed by:

L TUG'C0 Qua%t? Assurance Date A

J,ep J/' /

[///[

11/18/81 Constrsction Project 44anager Date Effective Date

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES I

J08 35-1195 CCP-30A 1

11/11/81 2 of 13

1.0 INTRODUCTION

1.1 PURPOSE 1.1.1 The purpose of this procedure is to establish an alternate prime coat system utilizing existing topcoat system. Coatings shall be applied to the containment liners and radiation areas in accordance with specification, drawing, and manufacturer's requirements. This procedure may also be used for coating any steel substrate inside the reactor buildings scheduled to receive primer or Dimetcote 6 and Phenoline 305 finish coat manufactured by Ameron and Carboline respectively.

1.2 SCOPE

- 1.2.1 The scope of this procedure covers the surface preparation and coating of Unit I and 2 steel substrates inside the reactor buildings and radiation areas scheduled to receive protective coatings.

t.3 GENERAL DISCUSSION 1.3.1 All coating materials covered by this. procedure shall be as manufactured by Carboline Corporation of St. Louis, Missouri or Ameron Protective Coatings Division, Brea, California. The coating system will consist of a prime coat of Dimetcote 6 by Ameron with a finish coat of Phenoline 305 by Carboline.

In order to protect the prime coat from prolonged exposure, a seal coat consisting of approximately one mil of Phenoline 305, thinned in accordance with Section 4.4.2.4, may be applied over the prime coat. Surface preparation of the ' seal coat prior to finish coating, shall consist of solvent wiping if exposed longer than 30 days.

Finish coating shall be applied when convenient prior to completion of the building --- or, prior to placement of concrete, equipment, or obstructions which would make finish coating impossible.

In order to maintain traceability on protective coatings applied to shop coated steel cited for installation in the Reactor Building,l these items shall be steel stamped with'a unique coating code number. The code number shall be assigned by QC Paint and applied by craft personnel. Upon division of materials, this unique number will be transferred alcng with all other unique identifying numbers.

2.0 DEFINITIONS OF TERMS, ABBREVIATIONS AND SYMBOLS 2.1 TERMS 4

2.1.1 Substrate - The uncoated surface to which a coating is applied.

R_

e y.,-

n a

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISIOR DATE PAGE CPSES J08 35-1195 CCP-30A 1

11/11/81 3 of 13 s

2.2 AB8REVIATIONS 2.2.1 (NONE) 2.3 SYMBOLS 2.3.1 (NONE) 3.0 SPECIAL ITEMS AND OPERATIONS 3.1 QUALIFICATION OF PERSONNEL 2.1.1 Coating application personnel shall be qualified per previous experience and practical application.

In addition, each paint-er shall have been instructed by the Paint Superintendent or his representative in the use of. the product as consistent with carboline's and Ameron training procedures, which includes both classroom instruction and a field application demonstration. This shall be verified by completing a form similar to Attachment 1.'

This form shall be executed by the B&R Paint Superintendent or his representative. A coating manufacturer's representative will be available for technical supervision upon initial painting effort. Applicators performing work to Attachment 2 shall be qualified for "Q" coatings, when applicable.

3.2 SAFETY REQUIREMENTS 3.2.1 All appropriate health, safety, and fire protection requirements pertaining to surface preparation and coating application shall be followed. It shall be the responsibility of the Safety Department Representative who will be present to establish the frequency of monitoring of the coating work.

3.3 INSTRUMENTS AND THEIR USE 3.3.1 The painting Foreman and General Foreman shall have access to and be familiar with the use of all instruments necessary to insure efficiency of coating applications. This shall include surface profile comparators, holiday detectors, thermometers, and wet and dry film gauges. Viscosity measuring devices will not be used.

PROCEDURE EFFECTIVE f

PAGE BROWN & ROOT, INC.

NUMBER REVISION DATE CPSES 4

f JOB 35-1195 CCP-30A 1

11/11/81 4 of 13 Wet film gauges will be randomly used during coating appli-cation as an aid to field personnel on Phenoline 305 only.

Readings will be limited to the minimum necessary to control coating thickness.

3.4 DOCUMENTATION 3.4.1 Records shall be maintained on Attachinents 1 and 2 listed in I

Section 5.1.

After completions, each form shall be forwarded to the Brown & Root Document Control Center for filing and distri-bution to the various parties as listed on the distribution sheet.

3.5 RECEIVING, STORAGE AND DISPENSING OF COATING MATERIALS 3.5.1 Receiving and Storage - Upon receipt of a shipment of coating materials, the B&R QC Representative accepting shipment shall be responsible for completing all necessary receiving inspection documentation. General receiving procedures shall be done in accordance with Brown & Root Construction Procedure CP-CPM 8.1.

It shall then be segregated from Non "Q" materials and. stored in the paint storage building where temperatures will be maintained between 450F - 1100F.

Infrequent dips in air temperature in storage areas as low as 32 F for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is acceptable.

0 Temporary storage may be required at the receiving warehouse due to receiving or other problems.

3.5.2 Dispensing - When coating materials are needed in the field, they shall be transferred from the controlled storage area to temporary storage in the field; due to limited shelf-life this shall be done on a "first-in", "first-out" basis. After materials have been partially used from an individual container, the same container cannot be resealed and returned to "Q" storage area. Containers opened and partially used in the "Q" paint storage area may be resealed and the contents used for later "Q" painting. With the exception of thinners, the contents from partially used containers will not be reused after a period of one week has elapsed from date of initial opening.

3.6 SPECIAL COATING PROCEDURE 3.6.1 When items require special coating not covered under the content of this document, the appropriate Project Engineer (Mechanical, Civil, Electrical) shall complete Attachment 2 and transmit it to the Paint Superintendent. A log of all procedures from Attachment 2 shall be maintained by the Project Mechanical Engineer. The following information shall be filled out on each procedure.

m.

M

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 4

CCP-30A 1

11/11/81 5 of 13 4

3.6.2 Each procedure shall be given a unique number. The scope will describe the working limits of the procedure with detailed work requirements being listed under the r2quirenents section.

The approvals section shall have signatures of the following:

Project Discipline Engineer (Mechanical, Civil, etc.), TUGC0 Quality Engineering if coating of item is safety related, TUSI representative when required, Engineer wno prepared document, and a revision number and date. Upon completion of the document, distribution shall be made to all holders of this procedure.

3.7 TOUCH-UP AND FINISH COATING OF VEN' DOR APPLIED COATINGS 3.7.1 Prior to touch-up of primer or application of topcoat, an adhesion test shall be performed by the Brown & Root QC Department.

If results are acceptable, week may proceed in accordance with sections 4.4.2.2 through 4.4.2.9.

3.7.2 The QC Inspector or his representative shall notify the responsible area engineer and/or the Paint Superintedent as soon as possible l

after receipt of a non-conforming item tn need of paint repair to allow time for Attachment 2 preparation and a planned schedule for repair.

4.0 PROCEDURE FOR COATING 4.1 PREPARATION OF SUBSTRATES AND. COATING MATERIALS Surface Preparation for Primer - Final surface preparation shall not begin unless the temperature of the surface to be blasted and/or power tooled is SoF above the dew point.

If needed, the surface to be primed shall then be cleaned of any heavy oil or grease deposits i

in accordance with SSPC-SF-1-63 Solvent Cleaning".

Small amounts of grease or cil deposits may be removed by blast operations. The surface shall then be cleaned by blast, hand or power tool operations to achieve an equivalent of SSPC-SP10-63, "near wnite" blast cleaning. Although 1-3 mil, surface prcfile is preferred, a minimum of 1 mil. profile is required. After the above surface preparation, the surface to be primed shall be air blasted and/or solvent wiped to remove dust, sand or foreign contaminants from the surface. Air blasting shall not be performed where air-borne contaminants could adhere to tacky paint. Suffi-cient time shall be provided to allow suspended particles to settle before beginning primer appifcation.

If rust forms after surface preparation, the rusted area shall be re-cleaned before

, primer application. Under no case shall a blast, hand, or power tool cleaned surface be exposed for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to priming without additional cleaning of the surface. When applying coatings that will be joined together by a later coating operation, i

the interface shall be constructed as follows:

j 4

'-.~.

CCP-30A Rev. 1 DCN #4 n17 /gg Shaet 2 of 2

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 6 of 13 a.

Blasting using no border tape - Overblast the steel to near white metal approximately 12" - 18" beyond the point which will receive primer. Hold back approximately 12" - 18" from edge of blasted area when applying primer.

b.

Blast, hand or power tool cleaning using border tape - Clean the steel to near white metal approximately 3" - 6" beyond the point which will receive primer. Place border tape approximately 1" in from edge of cleaned area and prime.

When applying seal or finish coat on either of above methods hold back approximately 12" - 18" from edge of primer.

4.1.2 Removal of Wald Spatter and Other Minor Surface Imperfections (NOT TO EXCEED.031" FOR CONTAINMENT LINERS) - If needed, weld spatter not removed by others shall be removed by Painting Personnal i

in accordance with SSPC-SP-2, and SP-3.

In areas where grinding and needle scaling is required, this will be witnessed by a Brown & Root QC Representative. -If it is determined that surface defects are severe enough to require later repair, then the area to be repaired will be blocked out and spot painted at a later date. All protrusions and peaks shall be ground to a rounded contour.

4.1.3 If coating removal is required from an area or item which has pre-viously been coated in accordance with this procedure, shadows or tight residue of primer which may remain in the profile of the previously prepared substrate is acceptable.

4.2 SURFACE PREPARATION FOR FINISH COAT 4.2.1 Surface preparation for the finish coat shall consist of the removal, if needed, of any oil and grease. This shall be accomplished by use of a manufacturer reconnended cleanser or cleansing method on areas that have been seal-coated. On areas where the Dimetcote 6 primer is exposed, oil and grease will be removed by sand blasting, hand or power tool grinding and needle scaling and then by solvent wiping the E

area prior to replacing the primer. Power tool grinding and needle scaling should be equivalent to a near white blast SP-10 specification with no size limitation as long as the millage requirements are ob-tained.

4.2.2 The ambient temperature and relative humidity shall be measured to determine the dew point tenperature. Phenoline 305 finish coat shall not be applied unless the substrate temperature is more 0

than 5 F above the d'w point.

e

&~A

~~~'

CCP-30A Rev. 1 DCN #5 5/11/82 Sheet 2 of 2

Ik PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES J08 35-1195 c

CCP-30A 1

11/11/81 7 of 13 i

4.3 PREPARATIONOFCOATINGMATERIALS

~

4.3.1 Primer - The primer, Dimetcote 6, is packaged in a two compo-nent kit consisting of a base and zine filler. The base shall be thoroughly mixed first. Zinc filler shall then be added un-der constant agitation and mixed until free of lumps. Partial mixes shall be mixed by weight in a proportion of 6.4 parts base to 15 parts zinc filler using a suitable scale to achieve a plus or minus 2 percent accuracy. The mixture shall then be strained through a 30-mesh screen. Viscosity shall be controlled by add-ing thinner as required up to the maximum allowed by the latest revision of Dimetcote 6 application instructions. Primer coat shall be reddish gray. Pot life of Dimetcote 6 shall be 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l 4.3.2 Finish Coat - The finish coat consists of carbolines Phenoline 305, to which is added a catalyst. This shall be thoroughly mixed while combining in a ratio by volume, of four parts Phenoline 305 to one part catalyst; the finish color shall be as required by the governing specification. Viscosity control shall be accomplished by adding thinner as required, but shall not exceed two quarts of thinner per gallon of 305. Pot life for finish coating shall be in accordance with Attachment 3.

4.4 APPLICATION OF PRIME AND FINISH COATING 4.4.1 Prime Coat: (Ameron Dimetcote 6) 4.4.1.1 Coating materials shall be ap' plied using conventional spray equip-ment with agitated pressure pots having a maximum hose length of 75 feet. The primer shall be allowed to become tack free before i

start of other construction operations which could create contam-ination problems. Any runs or sags having a detrimental effect on the coating system shall be removed and repaired. The following application parameters shall also be followed:

i 1.

Normal conditions of ambient and surface temperature shall be 120 F and 400 - 130 F, respectively; however, primer may 0

400 4 0

be applied within an ambient range of 0 - 130 F and a surface 0 - 2000F. Under other than normal temperature range of 0 conditions, it may be advisable to use more thinner to reduce 4

0 dry spray.

If surface temperature is above 85 F, it is advis-able to use between 1 pint and 2 quarts of Amercoat thinner

., #101 per gallon of Dimetcote 6 to get wet application.

o W.

...m

~.

I PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 8 of 13 2.

Humidity values may vary from 10 to 95% however, coating shall not be applied to a wet or damp surface.

4 1

~

3.

Thickness of prime coat shall be a minimum dry film of 2 mils i

and a maximum of 5 mils. Minimum spot test values shall be 1.5 mils and 5.5 mils respectively.

4.

A double regulated pot having an adequate air volume supply shall be used.

1 I

5.

As a guide, coating materials shall be applied using a 50%

overlap with each pass while holding the gun 8-10 inches from the surface. Cross hatch application is permissible.

6.

Curing time shall be as follows, depending upon approximate surface temperature and relative humidity conditions:

l Curing Time i

TEMPERATURE WITH OVER 50% R.H.

Before Topcoating 40 - 99 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 1000 and above 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 0

When water curing, below 40 F, and/or below 50% R.H., rely NOTE:

on " coin test" method for determining cure.

" Coin Test" is defined as: the coating is sufficiently cured for topcoat when the coating may be burnished rather than removed when rubbed with the flat portion of a coin such as a nickle.

If required, the cure of Dimetcote 6 may be accelerated by use of water spray after allowing at least one hour cure after applica-tion. This shall be done as of ten as required using clean water having a ph range of.6 to 8.

If used, a filter system will be installed in order to assure proper cleanliness of the curing water.

4.4.1.2 Recoating of Dimetcote 6 Primer - Surface shall be free of all oil, grease and other contaminants. (Remove oil or grease per Section4.2.1) A wash down with Trisodium Phosphate (T.S.P.)

or detergent, using a stiff bristle brush, followed by flushing with fresh water is required. Do not solvent wipe the surface as a final cleaning method. If no major defects as defined in Section 4.4.2.9 are present and the primed surface to be recoated is cured and prepared in accordance with this procedure, recoating may be performed.

M

-. -~

~

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 9 of 13 4.4.1.3 Repair of Sags and Runs - Sags or runs in excess of 5.5 mils will be abraded with an aluminum screen or sandpaper to 2.0 to 5.5 mils.

Sags or runs 5.5 mils or less which show no evidence of mud-cracking will not be repaired. If coating surface is satisfactory after abrading, then Carbolines finish coat may be applied; however, if coating surface is unsatisfactory, blast, hand abrade or power tool grind to near white metal is required and primer coat re-applied.

A satisfactory coating is considered one having no mud-cracking to the metal surface as visible to the unaided eye.

4.4.1.4 Brush touch-up painting shall be done on the prime coat in accor-dance with the following:

Prime Coat:

1.

Dimetcote 6 application instruction R 11-78. Max. allowable touchup - 144 square inches.

2.

Dimetcote 6 Product bulletin R 6-79.

4.4.1.5 Repair of Embedded Foreign Particles - Embedded foreign particles sht,ll be removed by abrading. If icw millage or major defects result, recoat or repair per Section 4.4.1.2 or 4.4.2.9 respectively.

4.4.1.6 Treatment of Rust Stains - Remove residue, though not necessarily the stain, with bristle brush and wat'er with Carboline #33 thinner or Amercoat #12 cleaner. Allow to dry thoroughly.

4.4.1.7 Coating Interface - Refer to Section 4.4.3.0 for coating interfacing.

4.4.2 Finish Coat; Carboline, Phenoline 305 4.4.2.1 Finish coating shall be applied using conventional, airless, brush or roller. Weld seams, edges and other sharp geometrical t

discontinuities may receive an initial-coat of 1-2 mils finish coating thinned by using two quarts Phenoline Thinner per gallon kit of Phenoline 305. To aid in continuity at edges, edges may be " striped" with Phenoline unthinned instead of the 50?, mixture as stated above. In either " striping" or initial coating of edges, welds, etc., time should be allotted for the coating to harden sufficiently to maintain a " sealing" effect prior to continuing coating operations. The initial coating of edges, striping, etc.,

as stated above, shall be considered part of the total initial finish coating operation. The material shall be allowed to become tack free before any other construction operations proceed which could create contamination problems by dust or other foreign matter.

A continuity check shall be performed in accordance with NACE-T-6F-3 Condition "C".

No gross discentinuities are acceptable such as holidays, voids, skips, bubbles, and misses. Any runs or sags having a detrimental effect on the coating system shall be removed CCP-30A Rev. 1 DCN #3 1/26/82 Sheet 2 of 3

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 10 of 13 and repaired. The following application parameters shall govern:

I 1.

The permissible range of surfage and ambient temperature for application shall.be 500 - 120 F.

After the material has become " tack free", temperature may rise above 1200F, Pheno-line 305 may be thinned up to 2 quarts of Phenoline Thinner per gallon mix. The ratio of thinner to Phenoline will be that which gives the best workable mix; i.e., usually advantageous to use more thinner at lower temperatures.

2.

Minimum and maximum values of relative humidity shall be 0%

and 85% respectively.

3.

As a guide, coating material shall be applied usir.g a 50% over-lap with each pass while holding the gun 8-10 inches from the surface.

4.

Curing and time to recoat Phenoline 305 shall be as shown below:

C Between Coats Temperature F Final Cure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 50 - 59 12 days 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 60 - 74 8 days 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> 75 - 89 4 days 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 90 and above 2 days g

Phenoline thinned at 50% and applied as a seal coat may be recoated after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> cure at or above 750F, 5.

Tack free shall be defined as the extent of cure which foreign contaminants will not adhere to the coating.

6.

The total coating system shall have a dry film thickness range of 7-11 mils with a minimum spot check of 7 mils and a maximum spot check of 11.5 mils.

4.4.2.2 Repair of Runs and Sags - Runs or sags will be abraded until the DFT of the Phenoline 305 is within 1.9 - 4.5 mils.

If cracks are visible, then runs and sags will be removed to primer by power tool grinding followed by solvent wiping. If no cracking occurs, top coat will be considered acceptable. Refer to Section 4.4.2.1(4) for cure to recoat time.

4.4.2.3 Repair of Embedded Foreign Particles - Foreign particles shall be renoved by abrading and then recoated as outlined in the repair of pinholes and discontinuities. Refer to Section 4.4.2.1(4) for recoating times.

Y5

~

CCP-30A Rev. 1 DCN #3 1/26/82 Sheet 3 of 3

PROCEDURE EFFECTIVE BR M & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES J08 35-1195 l

CCP-30A i

11/11/81 11 of 13 4.4.2.4 Repair of Pinholes and Discontinuities - Loose particles shall be removed by brushing or vacuum. The entire area shall then be solvent wiped using Phenoline 305 Thinner and recoated using thinned down Phenoline 305 consisting of two quarts Phenoline Thinner per each gallon kit of Pheno-lins 305 applied at approximately 1-2 mils DFT.

(See Section i

4.4.2.1(4) for recoating time.)

I 4.4.2.5 Repair of Scratches and Damaged Areas - Any scratches or damaged areas will be abraded until loosely adherent particles are removed. The area will then be solvent wiped (Amercoat 12 cleaner for primer, Phenoline Thinner #305 or xylol for topcoat),

and repaired with appropriate coating, i.e., Phenoline 305 if damage does not extend to primer; Dimetcote 6 and Phenoline 305 if primer is damaged (if area is considered a major defect). Thick-ness shall be as required for the pertinent coating.

If damage extends to metal and is considered a major defect (Refer to Section 4.4.2.9), damaged area will be blasted, hand or machine ground until 4

bare metal is exposed. All edges of existing coating around peri-meter of cleaned area shall be feathered back a sufficient amount to ensure a smooth blend with existing coating.

4.4.2.6 Brush touch-up ' painting shall be done on the finish coat in accordance with the following:

1.

Carboline Application Instruction (Phenoline 305) Bulletin 775.

2.

Carboline Product Data Sheet (Phenoline 305 Primer and Finish)

Bulletin 473. Brush touch-up and complete application is allowed with no area restrictions.

4.4.2.7 Treatment of Rust Stains - If surface is contaminated with rust stains or minute metallic particles, then surface shall be pre-pared by solvent wiping with Phenoline 305 Thinner or xylol and overcoating with a coat of Phenoline 305 prepared in accordance with Section 4.4.2.4.

4.4.2.8 Repair of Topcoat and/or D-6 Minor Defect - (Minor defects are de-fined as an area, either circular or linear, in which a h" diameter circle could not be completely inscribed at any point along the entire length.) Blast or abrade, by machine or hand, the Pheno-l line 305 finish surrounding the damaged areas and grind any exposed steel to a bright finish. Solvent wipe the surrounding 305 finish with Carboline 305 thinner or xylol. Spray or brush apply Pheno-line 305 finish at four mils nominal DFT over the damaged area, overlap at least one inch onto the surrounding 305 finish.

i CCP-30A Rev. I DCN #2 11/19/81 Sheet 3 of 3

i PROCEDURE EFFECTIVE !

BROWN & ROOT, INC.

NUMBER REVISION DATE l

PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 12 of 13 4.4.2.9 Repair of Phenoline 305 Top' coat and/or Dimetcote 6 Primer Major Defects - (Major defects are defined as an area, either circular or linear, in which a " diameter circle could be inscribed at any point or along the entire length.) Spot blast or abrade, by machine or hand, the damaged area. Power tool or hand abrading must be very thorough in order to prepare the surface for Dimetcote 6

+

touch-up. The profile shall be equivalent to a near white SP-10 Specification. The surface shall not be polished by wire brushing or other means.

4.4.3.0 Coating Interface - At coating interface for finish and/or primer coat, the existing coating shall be " feathered back" a sufficient distance to ensure a smooth final coating system.

When interfacing the 305/CZ11 system and the 305/06 system, the interface of the two primers shall be no greater than Ih" in width.

4.5 FINAL ACCEPTANCE TESTING 4.5.1 Following completion of total coating system, a final accept-ance test shall be performed. Brown & Root Paint Superinten-dent shall maintain a log of all final acceptance tested areas.

4.6 HOLD POINTS 4.6.1 Onsite receipt of coating materials.

4.6.2 Substrates before and following surface preparation.

4.6.3 Mixing and preparation of coating material for application.

4.6.4 Film characteristics after drying and curing.

4.6.5 Control of ambient conditions and surface temperatures during all phases of the coating work.

5.0 SUPPORTING INFORMATION 5.1 ATTACHMENTS 1.

Painter Qualification Record 2.

Special Coating Procedure 1

3.

Pot Life Phenoline 305 i

CCP-30A Rev. I DCN #1 11/18/81 Sheet 3 of 3

T PROCEDURE EFFECTIVE BROWN & ROOT, IfC.

NUMBER REVISION DATE PAGE CPSES I

JOB 35-1195 CCP-30A 1

11/11/81 13 of 13

5.2 REFERENCES

1.

Gibbs & Hill Specification 2323-SS-14,

" Containment Steel Liner". Latest Revision 2.

Steel Structures Paint Council, Volume 2, Second Edition 3.

Carboline Corporation " Application Instructions",

October 76-N Revision, and 473, Latest Revision F

4.

Ameron Protective Coating Division Dimetcote 6

" Application Instructions". R 11-78, Dimetcote 6 Production Bulletin R 6-79 6.

Gibbs & Hill Specification 2323-AS-31,

" Protective Coatings", Latest Revision 7.

Gibbs & Hill Specification 2323-MS-101,

" Equipment Erection", Latest Revision 8.

Gibbs & Hill Specifi;ation 2323-MS-43B,

" Nuclear Piping", La.est Revision 9.

Gibbs & Hill Specification 2323-MS-448, "Non-Nuclear Piping"

10. Gibbs & Hill Specification 2323-MS-100,

" Piping Erection"

11. Gibbs & Hill Specification 2323-55-17

" Miscellaneous Steel", Latest Revision

1 PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 1 of 2 ATTACHMENT.1 BROWN & ROOT, INC.

COMANCHE PEAX STEAM ELECTRIC STATION

~

I Painter Qualification Record l

i GENERAL DATA j

Date Report Number TECHNICAL DATA Name of Painter Susinery of Field Experience Experience with Following Product Types Application Test for Specified Substrate l

l Additional Qualifications (School)

Signature Applicator's F1eic Superv1scr Distribution: Painting Supt.

0.C. Deoart:nent l

Tug:o QA Vault (Originall _

'- E ~'

D

I BROWN & ROOT, INC.

~ PROCEDURE EFFECTIVE NUMBER REVISION DATE--

PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 2 of 2 ATTACif1ENT'2 "Q" Coating Sheet of Procedure #

"Non-Q" Coating Rev.

Date SPECIAL COATING PROCEDURE NO.

SCOPE REQUIREMENTS:

s I

I REFERENCE DOCUMENTS APPROVALS PDE QA/QC TUSI ENGINEER R EV.

DATE:

-g

,3

PROCEDURE EFFECTIVE CROWN & ROOT, INC.

NUMBER REVISION DATE '

PAGE CPSES JOB 35-1195 CCP-30A 1

ll/11/81 1 of 1 ATTACHMENT 3 (CT LIFE PHENOLINE.305 '

~~

TEMPERATURE (O )

UNTHINNED THINNED-50%

F 50 -

5.".

10 hrs 24 hrs 55 - 51 7 hrs 24 hrs 60 - 64 4 hrs 24 hrs 65 - 69 3 hrs 24 hrs 70 - 74 2 hrs 24 hrs 75 - 79 1 hrs 24 hrs 80 - 84 I hrs 24 hrs 85 - 89 I hrs 24 hrs 90 - 95 1 hr 24 hrs Pot life for coatings thinned up to but not including max, amount of thinner allowed, use pot life for unthinned material.

0 l

PROCEDURE EFFECTIVE i BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES l

JOB 35-1195 CCP-30A 1

11/11/81 9 of 13 4.4.1.3 Repair of Sags and Runs - Sags or runs in excess of 5.5 mils will be abraded with an aluminum screen or sandpaper to 2.0 to 5.5 mils.

Sags or runs 5.5 mils or less which show no evidence of mud-cracking will not be repaired.

If coating surface is satisfactory after abrading, then Carbolines finish coat may be applied; however, if coating surface is unsatisfactory, blast, hand abrade or power tool grind to near white metal is required and primer coat re-applied.

A satisfactory coating is considered one having no mud-cracking to l

the metal surface as visible to the unaided eye.

Brush touch-up painting shall be done on the prime coat in accor-dance with the following:

Prime Coat:

p 1.

Dimetcote 6 application instruction R 11-78. Max. allowable touchup - 144 square inches.

2.

Dimetcote 6 Product bulletin R 6-79.

g 4.4.1.5 Repair of Embedded Foreign Particles - Embedded foreign particles k

shall be removed by abrading.

If low millage or major defects result, recoat or repair per Section 4.4.1.2 or 4.4.2.9 respectively.

9 4.4.1.6 Treatment of Rust Stains - Remove residue, though not necessarily y

the stain, with bristle brush and water with Carboline #33 thinner N

or Amercoat #12 cleaner. Allow to dry thoroughly.

4.4.2 Finish Coat; Carboline, Phanoline 305 4.4.2.1 Finish coating shall be applied using conventional, airless, brush or roller. Weld seams may be given an initial coat of I-2 mils finish coating thinned by using two quarts Phenoline Thinner per each gallon kit Phenoline 305. The material shall I

be tack free before any other construction operations proceed which could create contamination problems by dust or other foreign matter. A continuity check shall be performed in accor-dance with NACE-T-6F-3 Condition "C".

No gross discontinuities are acceptable such as holidays, voids, skips, bubbles, and misses.

Any runs or sags having a detrimental effect on the coating system shall be removed and repaired. The following application parameters shall govern:

o

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 12 of 13 4.4.2.9 Repair of Phenoline 305 Topceat and/or Dimetcote 6 Primer Major l

Defects - (Major defects are defined as an area, either circular or linear, in which a " diameter circle could be inscribed at ny point or along the entire length.) Spot blast or abrade, by

/

achine or hand, the damaged area. Power tool or hand abrading ust be very thorough in order to prepare the surface for Dimetcote 6 t

1,. -

touch-up. The profile shall be equivalent to a near white SP-10 h

Specification. The surface shall not be polished by wire brushing or other means.

FINAL ACCEPTANCE TESTING 4.5.1 Following completion of total coating system, a final accept-ance test shall be performed. Brown and Root Paint Superin-tendent shall maintain a log of all final acceptance tested areas.

4.6 HOLD POINTS 4.6.1 Onsite receipt of coating materials.

4.6.2 Substrates before and following surface preparation.

4.6.3 Mixing and preparation of coating material for application.

4.6.4 Film characteristics after drying and curing.

4.6.5 Control of ambient conditions and surface temparatures during all phases of the coating work.

5.0 SUPPORTING INFORMATION 5.1 ATTACHMENTS 1.

Painter Qualification Record

~

2.

Special Coating Procedure 3.

Pot Life Phenoline 305 l

h

~

I PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 10 of 13 1.

The permissjble range of surface and ambient temperature shall be 50 F - 120 F.

Phenoline 305 may be thinned up Pg to 2 quarts of Phenoline thinner per gallon mix. The ratio of thinner to Phenoline will be that which gives the best workable mix; i.e., usually advantagecus to use more thinner at lower temperatures.

2.

Minimum and maximum values of relative humidity shall be 0% and 85% respectively.

3.

Thickness of coating shall have a minimum of 2.5 mils and a I

maximum of 5.5 mils. Minimum and maximum spot test values shall be 1.9 and 6.5 mils respectively.

4.

As a guide, coating material shall be applied using a 50% overlap I with each pass while holding the gun 8-10 inches from the surface.

5.

Curing and time to recoat Phenoline 305 shall be as shown below:

O y

Between Coats Temoerature F Final Cure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 50-59 12 days k

36 ho0rs 60-74 8 days 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> 75-89 4 days 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 90+

2 days Phenoline thinned at 50% and applied as a seal coat may be y

0 recoated after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> cure at or above 75 F, 6.

Tack free shall be defined as the extent of cure which foreign

,]

contaminants will not adhere to the coating.

d 7.

The total coating system shall have a dry film thickness range of 7-11 mils with a minimum spot check of 6 mils and a maximum spot check of 11.5 mils.

4.4.2.2 Repair of Runs and Sags - Runs or sags will be abraded until the DFT of the Phenoline 305 is within 1.9 - 4.5 mils.

If cracks are visible, then runs and sags will be removed to primer by power tool grinding followed by solvent wiping. If no cracking occurs, top coat will be considered acceptable. Refer to Section 4.4.2.1(5) for cure to recoat time.

4.4.2.3 Repair of Embedded Foreign Particles - Foreign particles shall be removed by abrading and then recoated as outlined in the repair of pinholes and discontinuities. Refer to Section 4.4.2.1(5) for recoating times.

i PROCEDURE EFFECTIVE i

BROWN & ROOT, INC.

NUMBER

,1 REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 11 of 13 I

4.4.2.4 Repair of Pinholes and Discontinuities - Loose particles shall be removed by brushing or vacuum. The entire area shall then be solvent wiped using Phenoline 305 Thinner and recoated using thinned down Phenoline 305 consisting of two quarts Phenoline Thinner per each gallon kit of Pheno-1 5 applied at approximately 1-2 mils DFT.

(See Section

) for recoating time.)

4.4.2.

Scratches and Damaged Areas - Any scratches or areas will be abraded until loosely adherent particles oved. The area will then be solvent wiped (Amercoat 12 aner for primer, Phenoline Thinner #305 or xylol for topcoat),

I repaired with appropriate coating, i.e., Phenoline 305 if damage does not extend to primer; Dimetcote 6 and Phenoline 305 if primer is damaged (if area is considered a major defect). Thick-ness shall be as required for the pertinent coating.

If damage extends to metal and is considered a major defect (Refer to Section 4.4.2.9), damaged area will be blasted, hand or machine ground until bare metal is exposed. All edges of existing coating around peri-meter of cleaned area shall be feathered back a sufficient amount 7

to ensure a smooth blend with existing coating.

4.4.2.6 Brush touch-up painting shall be done on the finish coat in accordance with the following:

1.

Carboline Application Instruction (Phenoline 305) Bulletin 775.

2.

Carboline Product Data Sheet (Phenoline 305 Primer and Finish)

Bulletin 473. Brush touch-up and complete application is allowed with no area restrictions.

4.4.'2.7 Treatment of Rust Stains - If surface is contaminated with rust stains or minute metallic particles, then surface shall be pre-pared by solvent wiping with Phenoline 305 Thinner or xylol and l

overcoating with a coat of Phenoline 305 prepared in accordance with Section 4.4.2.4.

4.4.2.8 Repair of Topcoat and/or D-6 Minor Defect - (Minor defects are de-I fined as an area, either circular or linear, in which a h" diameter circle could not be completely inscribed at any point along the entire length.) Blast or abrade, by machine or hand, the Pheno-line 305 finish surrounding the damaged areas and grind any exposed steel to a bright finish. Solvent wipe the surrounding 305 finish with Carboline 305 thinner or xylol. Soray or brush apply Pheno-l line 305 finish at four mils nominal DFT over the damaged area, overlap at least one inch onto the surrounding 305 finish.

M_N

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 9 of 13 4.4.1.3 Repair of Sags and Runs - Sags or runs in excess of 5.5 inils will be abraded with an aluminum screen or sandpaper to 2.0 to 5.5 mils.

Sags or runs 5.5 mils or less which show no evidence of mud-cracking will not be repaired. If coating surface is satisfactory after ading, then Carbolines finish coat may be applied; however, if ting surface is unsatisfactory, blast, hand abrade or power tool 9

d to near white metal is required and primer coat re-applied, j

d tisfactory coating is considered one having no mud-cracking to metal surface as visible to the unaided eye.

Brush touch-up painting shall be done on the prime coat C. accor-dance with the following:

Prime Coat:

1.

Dimetcote 6 application instruction R 11-78. Max. allowable touchup - 144 square inches.

2.

Dimetcote 6 Product bulletin R 6-79.

4.4.1.5 Repair of Embedded Foreign Particles - Embedded foreign particles shall be removed by abrading.

If low millage ci major defects y

result, recoat or repair per Section 4.4.1.2 or 4.4.2.9 respectively.

4.4.1.6 Treatment of Rust Stains - Remove residue, though not necessarily 4

the stain, with bristle brush and water with Carboline #33 thinner y

or Amercoat #12 cleaner. Allow to dry thoroughly.

4.4.1.7 Coating Interface - Refer to Section 4.4.3.0 for coating interfacing.

D-%

\\ 4.4.2 Finish Coat; Carboline, Phenoline 305 4.4.2.1 Finish coating shall be applied using conventional, airless, brush or roller. Weld seams may be given an initial coat of 1-2 mils finish coating thinned by using two quarts Phenoline Thinner per each gallon kit Phe'noline 305. The material shall N

be tack free before any other construction operations proceed which could create contamination problems by dust or other A.d foreign matter. A continuity check shall be performed in accor-dance with NACE-T-6F-3 Condition "C".

No gross discontinuities

- (

are acceptable such as holidays, voids, skips, bubbles, and misses.

Any runs or sags having a detrimental effect on the coating system shall be removed and repaired. The following application parameters shall govern:

M"%

~

CCP-30A Rev. 1 OCN #1 11/18/81 Sheet 2 of 3

9

)

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 10 of 13 1.

The permissible range of surface and ambient temperature shall be 50 F - 1200F. Phenoline 305 may be thinned up to 2 quarts of Phenoline thinner per gallon mix. The i

ratio of thinner to Phenoline will be that which gives the best workable mix; i.e., usually advantageous to use more th t lower temperatures.

[2 iniMurg maximum values of relative humidity shall be

'OT an&

respectively.

l' A uide, coating material shall be applied using a 50% over-with each pass while holding the gun 8-10 inches from the surface.

,,4.

Curing and time to recoat Phenoline 305 shall be as shown below:

O Between Coats Temoerature F Final Cure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 50 - 59 12 days 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 60 - 74 8 days 18 hour2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br />s-75 - 89 4 days 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 90 +

2 days Phenoline thinned at 50% and applied as a seal coat may be recoated after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> cure at or above 750F.

5.

Tack free shall be defined as the extent of cure which foreign contaminants will not adhere to the coating.

6.

The total coating system shall have a dry film thickness range of 7-11 mils with a minimum spot check of 7 mils and a maximum i

spot check of 11.5 mils.

4.4.2.2 Repair of Runs and Sags - Runs or sags will be abraded until the DFT of the Phenoline 305 is within 1.9 - 4.5 mils.

If cracks are visible, then runs and sags will be removed to primer by power tool grinding followed by solvent wiping.

If no cracking occurs, top coat Will be considered acceptable. Refer.to Section 4.4.2.1(4)

I for cure to recoat time.

4.4.2.3 Repair of Embedded Foreign Particles - Foreign particles shall be removed by abrading and then recoated as outlined in the repair of pinholes and discontinuities. Refer to Section 4.4.2.1(4) for l

recoating times.

CCP-30A Rev. 1 DCN #2 11/19/81 Sheet 2 of 3

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 CCP-30A 1

11/11/81 5 of 13 3.6.2 Each procedure shall be given a unique number. The scope will describe the working limits of the procedure with detailed work requirements being listed under the requirements section.

The approvals section shall have signatures of the following:

Project Discipline Engineer (Mechanical, Civil, etc.), TUGC0 Engineering if coating of item is safety related, resentative when required, Engineer who prepared document, vision number and date. Upon completion of the document, tion shall be made to all holders of this procedure.

1 CH-UP AND FINISH COATING OF VENDOR APPLIED C0ATINGS 3.

Prior to touch-up of primer or application of topcoat, an adhesion test shall be performed by the Brown & Root QC Department.

If results are acceptable, work may proceed in accordance with sections 4.4.2.2 through 4.4.2.9.

3.7.2 The QC Inspector or his represetative shall notify the responsible area engineer and/or the Paint Superintendent as soon as possible after receipt of a non-conforming item in need of paint repair to allow Cme for Attachment 2 preparation and a planned schedule for repair.

4.0 PROCEDURE FOR COATING 4.1 PREPARATION OF SUBSTRATES AND C0ATING MATERIALS I

T, Surface Preparation for Primer - Final surface preparation shall I

not begin unless the temperature of the surface to be blasted is k

50F above the dew point.

If needed, the turface to be primed U

shall then be cleaned of any heavy oil or grease deposits in S

accordance with SSPC-SP-1-63 " Solvent Cleaning".

Small amounts of grease or oil deposits may be removed by blast N

operations. The surface shall then be cleaned by blast, hand or power tool operations to achieve an equivalent of SSPC-SP10-63, "near white" blast cleaning. Although 1-3 mil. surface profile is preferred, a minimum of 1 mil. profile is required. After the above surface preparation, the surface to be primed shall be air blasted and/or solvent wiped to remove dust, sand or foreign contaminants from the surface. Air blasting shall not be performed where air-borne contaminants could adhere to tacky paint. Suffi-

\\f cient time shall be provided to allow suspended particles to 4

settle before beginning primer application.

If rust forms after surface preparation, the rusted area shall be re-cleaned before primer application.

Under no case shall a blast, hand, or power tool cleaned surface be exposed for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to priming without additional cleaning of the surface. When applying coatings that will be joined together by a later coating operation, the interface shall be constructed as follows:

M_C

PROCEDURE EFFECTIVE BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES f

JOB 35-1195 CCP-30A 1

11/11/81 6 of 13 a.

Blasting using no border tape - Overblast the steel to near white metal approximately 12" - 18" beyond the point which

'n%

11 receive primer. Hold back approximately 12" - 18" from ge of blasted area when applying primer.

p

  • A ast, hand or power tool cleaning using border tape - Clean i

he steel to near white metal approximately 3" - 6" beyond the point which will receive primer. Place border tape approximately 1" in from edge of cleaned area and prime.

When applying seal or finish coat on either of above methods hold back approximately 12" - 18" from edge of primer.

k 4.1.2 Removal of Weld Spatter and Other Minor Surface Imperfections M

(NOT TO EXCEED.031" FOR CONTAINMENT LINERS) - If needed, weld 9

spatter not removed by others shall be removed by Painting Personnel 3

in accordance with SSPC-Sp-2, and SP-3.

In areas where grinding 4

and needle scaling is required, this will be witnessed by a Brown & Root QC Representative. If it is determined that surface defects are severe enough to require later repair, then the area d

to b+ repaired will be blocked out and spot painted at a later

(

dats. All protrusions and peaks shall be ground to a rounded contuur.

4.2 SURFACE PREPARATION FOR FINISH COAT 4.2.1 Surfr.ce preparation for the finish coat shall consist of the removal, if needed, of any oil and grease. This shall be accomplished by use of a manufacturer recommended cleanser or cleansing method on areas that have been seal-coated. On areas where the Dimetcote 6 primer is exposed, oil and grease will be removed by sand blasting, hand or power tool grinding and needle scaling and then by solvent wiping the area prior to r eplacing the primer. Power tool grinding and needle L 8ing should be equivalent tb a near white blast SP-10 specification with no size limitation as long as the millage requirements are obtained.

4.2.2 The ambient temperature and relative humidity shall be measured I

to determine the dew point temperature. Phenoline 305 finish coat shall got be applied unless the substrate temperature is l

more than 5 F above the dew point.

  • .?'

October 17, 1979

$kMS INDEXED

  1. - g, ' h REVISION 0 Y

DATES JOB 35-1195 COMANCHE PEAK STEAM El.ECTRIC STATION ALTERNATE CONSTRUCTION PROCEDURE

_ g i ;.

3,,,

35-1195-CCP-30-A s,

C0ATING STEEL SUBSTRATES INSIDE REACTOR BUILDING AND RADIATION AREAS APPROVED BY:

APPROVED BY:

bjh w

' l~ l * ??

6 spy f N. 779 i

()

Date Date J. H. Magner U. D. Douglas Project Chief Engineer Construction Project Manager PREPARED BY:

REVIEWED BY:

Mtt O O-2F) ~1C)

M6-

!/t -

'Nfhf a<

' Date

//

Date

(/

G. D. MacPhail J. P. Clarke, III.

Civil Engineer Quality Assurance BROWN & ROOT, INC.

HOUSTON, TEXAS

w 35-1195-CCP-30-A, October 17, 1979 REVISION O Page 2 of 16 TABLE OF CONTENTS SECTION TITLE PAGE 1.

INTRODUCTION........................................

3 1.1 PURPOSE.............................................

3 1.2 SC0PE................................................

3 1.3 GENERAL DISCUSSION..................................

3 2.

DEFINITIONS OF TERMS, ABBREVIATIONS AND SYMBOLS.....

3 2.1 TERMS...............................................

3

.2 AB BR EV I AT I O N S.......................................

4 2

2.3 SYMBOLS.............................................

4 l

3.

SPECIAL ITEMS AND OPERATIONS........................

4 3.1 QUALIFICATION OF PERSONNEL..........................

4 3.2-SAFETY R EQU IR EMENT S.................................

4 3.3 INSTRUMENTS AND THEIR USE...........................

4 3.4 DO CUM ENTAT ION.......................................

5 3.5 RECEIVING, STORING AND DISPENSING OF C0ATING MATERIALS...........................................

5 3.6 SPECIAL C0ATING PROCEDURE...........................

6 3.7 TOUCH-UP & FINISH COATING OF VENDOR APPLIED C0ATINGS............................................

6 4.

PROCEDURE FOR COATING...............................

6 4.1 PREPARATION OF SUBSTRATES AND 'C0ATING MATERIALS......

6 l

4.2 SURFACE PREPARATION FOR FINISH C0AT.................

7 4.3 PREPARATION OF. C0ATING MATERIALS....................

8 l-4.4 APPLICATION OF PRIME AND FINISH C0ATING.............

8

- 4. 5 FINAL ACCEPTANC E. TESTING............................

13 l

4.6 HOLD P0!NTS'.........................................

13 l

5.

SU P PO RT I NG I N FO RMAT ION..............................

13 5.1 ATTACHMENTS..........................................

13-5.2 R EF ER E N C E S........................................... 14 4

G l.

c l<

i AL L.

e 35-1195-CCP-30-A, October 17, 1979 REVISION O Page 3 of16 1.

INTRODUCTION 1.1 PURPOSE 1.1.1 The purpose of this procedure is to establish an alternate prime coat system utilizing existing topcoat system. Coatings shall be applied to the containment liners and radiation areas in accordance with specification, drawing, and manufacturer's requirements. This procedure may also be used for coating any steel substrate inside the reactor butidings scheduled to receive primer or Dimetcote 6 and Phenoline 305 finish coat manufactured by Ameron and Carboline respectively.

1.2 SCOPE 1.2.1 The scope of this procedure covers the surface preparation and coating of Unit 1 and 2 steel substrates inside the reactor buildings and radiation areas scheduled to receive protective coatings.

1.3 GENERAL DISCUSSION 1.3.1

- All coating materials covered by this procedure shall be as manufactured by Carboline Corporation of St. Louis, Missouri or Ameron Protective Coatings Division, Brea, California. The coating system will consist of a prime coat of Dimetcote 6 by Ameron with a finish coat of Pheonoline 305 by Carboline.

In order to protect the prime coat from prolonged exposure, a seal coat consisting of approximately one mil of Pheonoline 305, thin-ned in accordance with Section 4.4.2.4, may be applied over the prime coat. Surface preparation of the seal coat prior to finish coating, shall consist of solvent wiping if exposed longer than 30 days. Finish coating shall be applied when convenient prior to completion of the building ---- or, prior to placement of concrete, equipment, or obstructions which would make finish coating im-possible.

2.

DEFINITIONS OF TERMS, ABBREVIATIONS AND SYMBOLS 2.1 TERMS 2.1.1 Substrate - The uncoated surface to which a coating is applied.

i l

i.

l m

L

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 4 of 16 2.2 ABBREVIATIONS l

2.2.1 (NONE) 2.3 SYMBOLS 2.3.1 (NONE) 3.

SPECIAL ITEMS AND OPERATIONS 3.1 QUALIFICATION OF PERSONNEL 3.1.1 Coating application personnel shall be qualified per previous experience and practical application.

In addition, each paint-er shall have been instructed by the Paint Superintendent or his representative in the use of the product as consistent with carboline's and Ameron training procedures, which includes both classroom instruction and a field application demonstration. This shall be verified by completing a form similar to Attachment 1.

This form shall be executed by the B&R Paint Superintendent or his l

representative. A coating manufacturer's representative will' be available for technical supervision upon initial painting effort. Applicators performing work to Attachment 2 shall be l

qualified for "Q" coatings, when applicable.

3.2 SAFETY REQUIREMENTS 3.2.1 All appropriate health, safety, and fire protection require-ments pertaining to surface preparation and coating applica-l tion shall be followed.

It shall be the responsibility of the Safety Department Representative who will be present to estab-lish the frequency of monitoring of the coating work.

3.3 INSTRUMENTS AND THEIR USE 3.3.1 The painting Foreman and General Foreman shall have access to and be familiar with the use of all instruments necessary to insure efficiency of coating applications. This shall include surface profile comparators, holiday detectors, thermometers, i

and wet and dry film gauges. Viscosity measuring devices will not l

I I

AL

~M L

35-1195-CCP-30A, October 17, 1979 REVISION O Page 5 of 16 be used. Wet film gauges will 'tue randomly used during coat-ing application as an aid to field personnel on Phenoline 305 only. Readings will be limited to the minimum necessary to control coating thickness.

3.4 DOCUMENTATION 3.4.1 Records shall be maintained on all attachments listed in Sec-tion 5.1.

After completions, each form shall be forwarded to the Brown & Root Document Control Center for filing and distribution to the various parties as listed on the distribution sheet.

3.5 RECEIVING, STORING AND DISPENSING OF COATING MATERIALS

3. 5.1 Receiving and Storage - Upon receipt of a shipment of coating materials, the B&R QC Representative accepting shipment shall be responsible for completing all necessary receiving inspec-tion documentation. General receiving procedures shall be done in accordance with Srown & Root Construction Procedure ACP-3.

It shall then be segregated from Non "Q" materials and stored in the paint storage building where temperatures l

will be maintained between 45 F - li f F.

Infgequentdipsin

~

air temperature in storage areas as low as 32 F for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is acceptable. Temporary storage may be required at the receiving warehouse due to receiving or other problems.

3.5.2 Dispensing - When coating materials are needed in the field, they shall be transferred from the controlled storage area to temporary storage in the field; due to limited shelf-life this shall be done on a "first-in", "first-out" basis. After mater-ials have been partially used from an individual container, the l

same container cannot be resealed and returned to "Q* storage area. Containers opened and partially used in the "Q" paint storage area may be resealed and the contents used for later "Q" painting. The contents from partially used containers will not be reused after a period of one week has elapsed from date of initial opening.

I i

l 1

l l

g l

i-

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 6 of 16 3.6 SPECIAL COATING PROCEDURE 3.6.1 When items require special coating not covered under the content of this document, the appropriate Project Engineer (Mechanical, Civil. Electrial) shall complete Attachment 2 and transmit it to the Paint Superintendent. A log of all procedures from Attachment 2 shall be maintained by the Pro-ject Mechanical Engineer. The following information shall be filled out on each procedure.

3.6.2 Each procedure shall be given an unique number. The scope will describe the working limits of the procedure with de-tailed work requirements being listed under the requirements section. The approvals section shall have signatures of the following: Project Discipline Engineer (Mechanical, Civil, etc.), QA Manager if coating of item is safety related, TUSI representative when required, Engineer who prepared document, and a revision number and date. Upon completion of the doc-ument, distribution shall be made to all holders of this pro-cedure.

3.7 TOUCH-UP AND FINISH COATING OF VENDOR APPLIED COATINGS 3.7.1 Prior to touch-up of primer or application of topcoat, an adhesion test shall be performed by the Brown & Root QC Department.

If results are acceptable, work may proceed in accordance with sections 4.4.2.2 through 4.4.2.9.

3.7.2 The QC Inspector or his representative shall notify the respon-sible area engineer and/or the Paint Superintendent as soon as possible after receipt of a non-conforming item in need of paint repair to allow time for Attachment 2 preparation and a planned schedule for repair.

4.

PROCEDURE FOR COATING 4.1 PREPARATION OF SUBSTRATES AND COATING MATERIALS 4.1.1 Surface Preparation for Primer - Under normal conditions, surface preparation shall got begin unless the temperature of the surface to be blasted is 5 F above the dew point.

If needed, the surface to be primed shall then be cleaned of any heavy oil or grease de-posits in accordance with SSPC-SPIO, "Near White Blast Cleaning",

hand, or power tool grinding and scaling to achieve 1-2 mil profile.

After sand blasting, hand or power tool grinding and scaling, the surface to be primed shall be air blasted and/or solvent wiped to remove all sand and foreign materials. This shall be done until the surface is clean and will not be performed where air-borne contaminants could adhere to tacky paint. Sufficient time shall

~

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 7 of16 be provided to allow suspended particles to settle before beginning primer placement.

If rust forms after blast cleaning, the surface shall be " shower blast" cleaned before painting. Under no case will a blast cleaned surface be exposed for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to priming. When applying coatings that will be x

joined together by a 1. iter coating operation, the interface shall be constructed as follows: Overblast the steel to near white metal approximately 12" - 18" beyond the point which will receive primer.

Drop back approximately 12" - 18" on the primer when applying the seal-coat.

' 4.1. 2 Removal of Weld Spatter and Other Minor Surface Imperfections (NOT TO EXCEED.031" FOR CONTAINMENT LINERS) - If needed, weld spatter omitted by others will be removed by Painting Personnel-

. in accordance with SSPC-SP-2, and SP-3.

In areas where grinding and needle scaling is required, this will be witnessed by a

- Brown & Root QC Representative.

If it is determined that surface

' defects are severe enough to require later repair, then the area to be repaired will be blocked out and spot painted at a later date. All edges, protrusions, and peaks shall be ground smooth to a rounded contour; as a guide -1/8 inch radius of the contour "may be used.

4.2 SURFACE PREPARATION FOR FINISH COAT 4.2.1 Surface preparation for the finish coat shall consist of the removal, if needed of any oil or grease. This shall be accomplished by use of a manufacturer recommended cleanser or cleansing method on areas that have been seal-coated. On areas where the Dimetcote 6 primer is exposed, oil and grease will be removed by sand blasting, hand, or power tool grinding and needle scaling and then by solvent wiping the area prior to replacing the primer. Power tool grinding and needle scaling should be equivalent to a near white blast SP-10 specification with no size limitation as long as the millage requirements are obtained.

4.2.2 The ambient temperature and relative humidity should be measured to determine the dew point temperature. Phenoline 305 finish coat should not be applied unless the substrate temperature is more than 5a F above the dew point.

=

35-1195-CCP-30 A, October 17, 1979 REVISION O Page 8 of 16 4.3 PREPARATION OF C0ATING MATERIALS 4.3.1 Primer - The primer, Dimetcote 6, is packaged in a two compo-nent kit consisting of a base and zinc filler. The base shall be thoroughly mixed first. Zinc filler shall then be added un-der constant agitation and mixed until free of lumps. Partial mixes shall be mixed by weight in a proportion of 6.4 parts base to 15 parts zine filler using a suitable scale to achieve a plus or minus 2 percent accuracy. The mixture shall then be strained through a 30-mesh screen. Viscosity shall be controlled by add-ing thinner as required up to the maximum allowed by the latest revision of Dimetcote 6 application instructions.

Primer coat shall be reddish gray.

4.3.2 Finish Coat - The finish coat consists of carbolines Phenoline 305, to which is added a catalyst. This shall be thoroughly mixed while combining in a ratio, by volume, of four parts Phenoline 305 to one part catalyst; the finish color shall be as required by the governing specification. Viscosity control shall be accomplished by adding thinner up to the maximum amount permitted by the latest revision of Carboline Publication Number 473, (except recoating mixes - refer to Section 4.4.1.4).

4.4 APPLICATION OF PRIME AND FINISH C0ATING 4.4.1 Prime Coat: (Ameron Dimetcote 6) 4.4.1.1 Coating material shall be applied using converitional spray equip-ment with agitated pressure pots having a maximum hose length of 75 feet. Care must be taken to assure that air and material pressures are adjusted to compensate the cdditional leagth of hose from 50' to 75' in length. The primer shall be al' owed to dry as much as possible (h hr. min. 0 700 F, 50% R.H.) cefore start of other construction operations which could create con-tamination problems. Any runs or sags having a detrimental effect on the coating system shall be removed and repaired. The following application parameters shall also be followed:

1.

Normal conditions of ambient and surfacg F, respectively; temperature 13 1200 F and 40u shall be 400 however, priger may be applied within an ambient range 0 - 130 F and a surface temperature range of Oo - 200 F.

of 0 Under other than normal conditions, it may be advisable to use more thinner to reduce dry spray.

If surface temperature is above 850 F, it is advisable to use be-tween 1 pint and 2 quarts of Amercoat thinner #101 per gallon of Dimetcote 6 to get wet application.

~~

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 9 of 16

- 2.

Humidity values may vary from 10 to 95% however, coat-ing shall not be applied to a wet or damp surface.

3.

Thickness of prime coat shall be a minimum of 2 mils and a maximum of 5 mils. Minimum spot test values shall be 1.5 mils and 5.5 mils respectively.

4.

A double regulated pot having an adequate air volume supply shall be used.

5.

Coating material shall be applied using a 50% overlap with each pass while holding the gun 8-10 inches from the surface. Cross hatch application is permissable.

6.

Curing time shall be as follows, depending upon approx-imate tenperature and relative humidity conditions:

Curing Time TEMPERATURE WITH OVER 50% R.H.

Before Toccoating

00F, 7 days 4

F.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6

F.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8

F.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 1000F.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> If required, the. cure of Dimetcote 6 may be accelerated by use of water spray after allowing at least one hour cure after application. This shall be done as often as required using clean water having a ph range of 6 to 8.

If used, a filter system will be installed in order to assure proper cleanliness of the curing. water,.

4. 4.1. 2 Recoatino of Dimetcote 6 Primer - Surface shall be free of all oil, grease or other contaminants. A wash down with Trisodium Phosphate (T.S.P.) or detergent, using a stiff bristle brush, followed by flushing with fresh water is required. Allow sur-face to dry before recoating. Do not solvent wipe the surface to remove grease or oils as a final cleaning.

t a

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 10 of 16 4.4.1. 3 Repair of Saas and Runs - Sags or runs in excess of 5.5 mils will be abraded with an aluminum screen or sandpaper to 2.0 to 5.5 mils.

Sags or runs 5.5 mils or less which show no evidence of mud-crack-ing will not be repaired.

If coating surface is satisfactory after abrading, then Carbolines finish coat may be applied; however, if coating surface is unsatisfactory, blast, hand abrade or power tool grind to near white metal is required and primer coat re-applied. A satisfactory coating is considered one having no mud-cracking _to the metal surface as visible to the unaided eye.

4.4.1.4 Brush touch-up painting shall be done on the prime coat in accord-ance with the following:

Prime Coat:

1.

Dimetcote 6 application instructions R 11-78. Max. allowable touchup - 144 square inches.

2.

Dimetcote 6 Product bulletin R 6-79.

4.4.1.5 Repair of Embedded Fcreign particles - Embedded foreign particles shall be removed by ibrading and recoated as outlined in Section 4. 4.1. 2.

4.4.1.6 Treatment of Rust Stains - Remove residue, though not necessarily the stain, with bristle brush and water with Carboline #33 thinner or Amercoat #12 clea mr. Allow to dry thoroughly.

4.4.2 Finish Coat; Carboline, Phenoline 305 4.4. 2.1 Finish coating shall be applied using conventional, airless, brush'or roller. Weld seams may be given an initial coat of I-2 mils finish coating thinned by using two quarts Phenoline Thinner per each gallon kit Phenoline 305. The material shall be allowed to dry as much as possible before any other construc-tion operations proceed which could create contamination problems by dust or other foreign matter. A continuity check shall be performed in accordance with NACE T-6F-3 Condition "C".

No gross discontinuitite are acceptable such as holidays, voids, skips, bubbles, and misses. Any runs or sags having a detri-mental effect on the coating system shall be removed and re-paired.

The following application parameters shall govern:

~

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 11 of 16 1.

The permissible range of surface and ambient temperature shall be 50 - 120 degrees F.

However, when surface temp-eratures are outside the range of 60 - 85 degrees F. or ambient temperature outside 65 - 85 degrees F., it is per-missible to use up to two quarts of Phenoline Thinner per gallon kit of Phenoline 305. The amount of thinner used under these conditions (1-1/2 pints-2 quarts) shall be that which gives the best workable mix under the given tempera-ture conditions, i.e., usually advantagious to use more thinner at lower temperature.

2.

Minimum and maximum values of relative humidity shall be 0% and 85% respectively.

3.

Thickness of coating shall be minimum of 2.5 mils and a maximum of 5.5 mils. Minimum and maximum spot test val-ues shall be 1.9 and 6.5 mils respectively.

4.

Coating material shall be applied using a 50% overlap with each pass while holding the gun 8-10 inches from the surface.

5.

Recoating time of Phenoline 305 is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> at 90 degrees F. or 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> at 75 degrees F. and 50% R.H.

Phenoline 305 thinned at two quarts Phenoline Thinner per gallon kit may be recoated after four hours. After 30 days it shall be solvent wiped prior to recoating with Phenoline 305 Thinner.

6.

Tack free time at 75 degrees and 50% R.H. is 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.

7.

Full cure is achieved in 7 days at 75 degrees F. and 50%

R.H.

4.4.2.2 Repair of Runs and Sags - Runs or sags will be abraded until the DFT of the Phenoline 305 is within 1.9 - 4.5 mils.

If cracks are visible, then runs and sags will be removed to primer by power tool grinding followed by solvent wiping.

If no cracking occurs, top coat will be considered acceptable. Area will be recoated as out-lined in the Repair of Pinholes and Discontinuities (Section 4.4.2.4).

4.4.2.3 Repair of Embedded Foreign Particles-Foreign particles shall be removed by abrading and then recoated as outlined in the repair of pinholes and discontinuities. Recoating shall not be performed until 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> 9 75 degrees F. or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 9 90 de-grees F. have elapsed.

35-il95-CCP=30-A, October 17, 1979 REVISION O Page 12 of16 4.4.2.4 Repair of Pinholes and Discontinuities - Loose particles shall be removed by brushing or vacuum. The entire area shall then be solvent wiped using Phenoline 305 Thinner and recoated using thinned down Pheonline 305 consisting of two quarts Phenoline Thinner per each gallon kit of Pheno-line 305 applied at approximately 1-2 mils DFT.

(See Sec-tion 4.4.2.3 for recoating time.)

4.4.2.5 Repair of Scratches and Damaged Areas - Any scratches or damaged areas will be abraded until loosely adherent parti-cles are removed. The area will then be solvent wiped (Amer-coat 12 cleaner, Phenoline Thinner #305 for topcoat), and repaired with appropriate coating, i.e., Phenoline 305 if damage does not extend to primer; Dimetcote 6 and Phenoline 305 if primer is damaged (if area is considered a major defect).

Thickness shall be as required for the pertinent coating.

If damage extends to metal and is considered a major defect (Refer to Section 4.4.2.9), damaged area will be blast 2d, hand or machine ground until bare metal is exposed. All edges of existing coating around perimeter of cleaned area shall be feathered back approximately 2 inches.

4.4.2.6 Brush touch-up painting shall be done on the finish coat in accordance with the following:

1.

Carboline Application Instructions (Phenoline 305) Bul-letin 775, 2.

Carboline Product Data Sheet (Phenoline 305 Primer and Finish) Bulletin 473. Brush touch-up and complete ap-plication is allowed with no area restrictions.

4.4.2.7 Treatment of Rust Stains - If surface is contaminated with rust stains or minute metallic particles, then surface shall be prepared by solvent wiping with Phenoline 305 Thinner and overcoating with a coat of Phenoline 305 prepared in accordance with Section 4.4.2.4 4.4.2.8 Repair of Topcoat /O-6 Minor Defect - (Minor defects are defined as an area, either circular or linear, in which a h" diameter circle could not be completely inscribed at any point along the entire length.) Blast or abrade, by machine or hand, the Phenoline 305 finish surrounding the damaged area and grind any exposed steel to a bright finish. Solvent wipe the surround-ing 305 finish with Carboline Surface Preparation I.

Spray er brush apply Phenoline 305 finish at Four mils nominal D.F.T. over the damaged area, overlap at least one inch onto the sur-rounding 305 finish.

-w

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 13 of l6 4.4.2.9 Repair of Phendine 305 Topcoat /Dimetcote 6 Primer Major Defects -

(Major defects are defined as 'an area, either circular or linear, in which a h" diameter circle could be completely inscribed at any point or along the entire length.) Spot blast or abrade, by machine or hand, the damaged area. Power tool or hand abrading must be very thorough in order to prepare the surface for Dimetcote 6 touch-up. The prof 11a shall be equivalent to a near white SP-10 Specification. The surface shall not be polished by wire brushing or other means.

4.5 FINAL ACCEPTANCE TESTING 4.5.1 After coating system cure, final inspection, and resolution of all discrepancies is completed, the QC Inspector shall document T the final acceptance by completing and signing 'the final accept-ance record and will transmit a copy of this record to the BAR Paint Superintendent as soon as possible after final acceptance

.is made.

4.6 HOLD POINTS 4.6.1 Onsite receipt of coating materials.

4.6.2 Substrates before and following surface preparation.

4.6.3 Mixing and preparation of coating material for application.

4.6.4 Film characteristics after drying and curing.

4.6.5 Control of ambient conditions and surface temperatures during all phases of the coating work.

5.

SUPPORTING INFORMATION 5.1 ATTACHMENTS 1.

Painter Qualification Record 2.

Special Coating Procedure (CONTINUED ON NEXT.PAGE)

~M

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 14 ofl6

5.2 REFERENCES

1.

Gibbs & Hill Specification 2323-S5-14

" Containment Steel Liner", Latest Revision 2.

Steel Structures Paint Council, Volume 2 Second Edition 3.

Carboline Corporation " Application Instructions",

October 76-N Revision, and 473 Latest Revision 4.

Ameron Protective Coating Division Dimetcote 6

" Application Instructions". R 11-78, Dimetcote 6 Production Bulletin R 6-79 5.

ANSI N101.2,

" Protective Coatings (Paints) fo. Light Water Nuclear Reactor Containment Facflities" 6.

Gibbs & Hill Specification 2323-AS-31,

" Protective Coatings", Latest Revision 7.

Gibbs & Hill Specification 2323-MS-101,

" Equipment Erection" Latest Revision 8.

Gibbs & Hill Specification 2323-MS-438,

" Nuclear Piping" Latest Revision 9.

Gibbs & Hill Specification 2323-MS-448, "Non-Nuclear Piping"

10. Gibbs & Hill Specification 2323-MS-100

" Piping Erection"

11. Gibbs & Hill Specification 2323-55-17,

" Miscellaneous Steel" Latest Revision S

6 9

m

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 15 of 16 ATTACHMENT 1 BROWN & R007, INC.

COMANCHE PEAK STEAM ELECTRIC STATION Painter Qualification Record GENERAL DATA Date Report Number TECHNICALDAYA Name of Painter Summary of Field Experience Experience with Following Product Types Application Test for Specified Substrate Additional Qualifications (Schcol)

Signatare Applicator's Field Supervisor Distribution: Painting Supt.

Q.C. Department P-w

35-1195-CCP-30-A, October 17, 1979 REVISION O Page 16 of 16 ATTAClWENT 2 "Q" Coating Sheet of Procedure #

"Non-Q" Coating Rev.

Date SPECIAL COATING PROCEDURE NO.

SCOPE l

i REQUIREMENTS:

i REFERENCE 00CUMENTS APPROVALS POE GA/QC TUS!

ENGINEER f

l REV.

DATE:

i 1

1 l

I

g i. -g 4

CPSES N R C_

TRT j

SSER. -Co4 TING.$ h MK PAcW4

)

vinacr i

i l

1 P-30A F0 /A 51

'g iN

,,,,e-

'r'~

=

i e.

. :..... w g bxl.V $$

II

7. gg 1

^f ' [f.

. g,

,,.}

'v p.-

i

..c,

.,... mv.

.. m.e

~

g. _,.a.

e

  • 7 4

"'c g

+

5

..,+,;

l khk.dd;.;,. 7 g/kh, l.

?

s,,

n,

r;

.e j

i.

?

x.

,c A+

9, d;,

(

l

  • - e ' i.. %.

t e

3

,p b

a j

w df,

'W 4'

i nr

      • T * '

.i p-l g

+>

2,

.g.

s

  • =

g

'l

E 1

..~

s

! rexAs ununas assannNo Co.

'*fSaa'n "

l l

W siCN MOI

.C casas (QI-QP-11.4-27 I 6

JUl.111984 1 of 32 PRE.=ARED BY: WW

/

l-/0-8Y INSPECTION OF CONCRETE [

Nd MET'/6N '

SUBSTRATE SURFACE

' APPROVED 3Y C h 3e j

PREPARATION AND COATINGS:

Arg APPLICATION AND REPAIR APPROVED SY

f./,. / /-/ -

"- e e.N tr J

QATE h.$,.__...-.......:..ta6-.$ d -

n.,

1.0 REFERENCES

i 1-A Gibbs and Hill Specification 2323-AS-31, " Protective Coatings"

^

1-8 QI-QP-11.4-28, " Protective Coatings Inspection Travelers" 1-C CP-QP-16.0, "Nonconfonnances" l

' 7[.

~l?

2.0 GENERAL 2.1 PURPOSE AND SCOPE '. :..

d i' im L; m

This instruction shall describe the methods used by Quality Control personnel while perfonning inspections of applica '

tion of coatings on a concrete substrate inside the Reactor i

Containment Building, Unit 1.

l l

3.0 INSTRUCTIONS 1

i Visual inspection of surfaces as addressed by this instruction shall be made at approximately an ann's length from the surface being inspected.

The area of inspection shall be adequately 1.ighted during the inspection activity.

l Adequate li by a two (2)ghting is defined as the minimum light produced 0-cell battery flashlight.

t Vi sual aids fabricated on site and approved by Quality l

Assurance and Engineering may be used by Inspectors as an aid in the perfonnance of' their inspections.

For definitions reference Attachment 6.

[

If a conflict arises between the requirements 'of this procedure and the requirements of the site specification, Ref. 1-A, the requirements of the site specification shall preva il.

i i

I l

' bc h

Ch TUGCC oA

,. a e DUI/U,W Y'T(., '

~

V-------------------------

l INSTRUCTION REVISION.

SSUE PAGE TEXAS UTIUTIES GENERATING CO.

4 CPSES Jul.11584 QI-QP-11.4-27 6

2 of 32

~

3.1 SURFACE PREPARATION i '

Under nonnal condi tions, the concrete su rface shall be allowed to cure a minimum of 28 days prior to application of protective coatings.

However, if the coatings are to be applied to pour backs, grouting, or patching to which NUTEC 10 has been applied as a curing compound, coating application may be perfonned after a minimum of 6 days has elapsed from NUTEC 10 application time.

Repaired abandoned Hilti bolt holes, tie holes, unacceptable spalled concrete, grout under l

i base. plates which have 3 square feet or less of exposed grouted surface to be coated, may be coated if Nutec 10 is applied as a curing campound and the Nutec 10 has cured in accordance with Section 3.1.1.7.

Abandoned Hilti Bolt holes and tie holes nay be coated after initial setting of the patch if no curing menbrane is used.

If other curing methods are utilized for cosmetic patches or grr.at under base plates as stated above, coating shall not proceed until 7 days cure has elapsed.

3.1.1 Acolication of NUTEC 10 Curino Compound (if applicable) 3.1.1.1 The QC Inspector shall verify that the creen concrete has been cleaned.

3.1.1.2 The QC Inspector shall verify the coating applicatcr is qualified per Section 3.3.5.

i.

3.1.1.3 The QC Inspector shall verify that NUTEC 10 is not applied under inclement conditions and that the surface temperatures are above 50*F.

Anbient conditions shall be verified per Section 3.3.1.

Areas of visible moisture or standing water

-are unacceptable (Reference Attachment 6).

3.1.1.4 NUTEC 10 shall be mixed per Paragraph 3.2.

The NUTEC 10 has a pot life -of (1) one hour at 75'F.

If the NUTEC 10 gives - the appearance of crawling and does not penetrate the concrete, the material shall be renoved fran the concrete by solvent and a clean cloth.

All the expired material shall be discarded.

l' 3.1.1.5 Pot life above is the reconmended time and should be utilized as a guideline for coating time, actual pot life is detennined by the applicability of the coating.

This applies to thinned and unthinned coatings.

TUGCO CA 4

,-,re----

,.-n.,-...,

-.,,.,..y.,-rme--_<

,y

---.--,,,9-e,--w

.+y--73,

,-wm


m_.

,y-,

,y-r

-v--

I INSTRUCTION ISSUE REVISION PAGE

~

TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

JUL 111984 3 of 32 3.1.1.6 Nutec 10 may be applied by spray, brush, or roller.

If spray application is used, the QC Inspector shall verify that the NUTEC 10 air supply shall be in accordance with Section 3.3.3.

I 3.1.1.7 Cure times for Nutec 10 is as follows:

I ST - 50*F - 69'F -- 72 houn 70*F - 89'F -- 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 90*F and above 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> 3.1.2 Preblast Cleaning Ooerations Prior to surface preparation, the QC inspector shall visually examine the surface to be water blasted for heavy deposits of oil and grease.

Any heavy oil or grease deposits shall be removed.

The QC inspector shall also verify that any detrimental surface irregularities such as projections, fins or ridges are renoved.

NOTE:

The preblast visual inspection is required only den surface preparation is by one of the following methods:

a.

Water blasting b.

Water blasting with sand injection c.

Dry sandblasting d.

Bush hammering 3.1.3 Methods of Surface Preparation Water blasting, water blasting wi th sand injection, acid 1

etching, sand blasting, and power tooling are all acceptable methods of surface preparation.

If NUTEC 10 curing membrane has been applied and gives a " glossy" appearance, the NUTEC 10 shall be abraded to renove the glossy appearance.

If chemical cleaning is performed on the concrete substrate, the QC Inspector shall verify that the surface is flushed clean with water.

3.1.4 Post Surface Preparatien Operations After surface preparation, the QC inspector shall visually examine the surface to verify the following:

a)

The su rface shall be free of construction dust, laitance, and loose deposits, and all adjacent areas cleaned to avoid contamination.

%g, TUGCC CA

,n,.

- - ~ -

INSTRUCTION ISSUE REVISION PAGE

^

TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

yi gg 4 of 32 b)

All holes greater than 1/2 inch in depth or greater than 2" diameter and cracks greater than 1/32" width are repaired prior to surfacer application.

c)

All sharp projections removed.

I d)

Markings (ink, pencil, chalk, fel t tip marker, etc.)

solvent wiped.

e)

Marting paint removed.

I f)

Objects protruding fram surface are ground or cut smooth until object is flush.

g)

All loosely adhering embedded objects are renoved,

h)

Embedded steel objects less than 4 square inches shall be power tool roughened and solvent wiped.

i)

Metal objects larger than 4 square inches are primed.

j)

Surface is free of grease, oil, and nonapproved curing membranes.

l 3.2 MIXING OPERATIONS 3.2.1 Materials A QC inspector shall verify on Attachment 5 that the shelf life has not expired.

3.2.2 Mixing / Thinning An inspector shall witness all mixing / thinning operations Per Attachment 7.

Induction times for finish mixes are shown in Attachment 2.

3.3 SURFACER APPLICATION The coating system will consist of a surfacer Nutec 115, touch-up with Nutec 11 surfacer as required and a finish coat of Nutec 1201.

In areas where the concrete surface to be coated exhibits only minor amounts of " bug holes" and surface imperfections, Nutec 11 and Nutec 1201 may be used without the use of Nutec 11S as primary su rfacer.

%g, TUGCO CA s

~

j ~_.

.[

INSTR ON RESION PAGE i

TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

jy(111004 5 of 32 3.3.1 Ambient Conditions The inspector shall monitor the ambient conditions being recorded on the Environmental Log (Attachment 4) at the

" paint distribution point" inside Reactor Uni t I.

A calibrated non-mercury filled dry bulb themometer or a calibrated tenperature recorder (Bristol 4069 TH or equivalent) shall be used for air temperature.detemination.

A calibrated non-mercury filled wet bulb themometer or a calibrated humidity recorder (Bristol 4069 TH or equivalent) shall be used to detennine relative humidity. The dew point shall be detemined by the difference in dry and wet bulb tenperature using the U.S. Department of Commerce Weather i

Bureau Psychrometric Tables, W.B. No. 235.

When dry bulb readings are greater than 100*F, the dew point and relative humidity should be detemined using the 100*F reading (note in Remarks Section).

The surface temperatu re shall be determined by placing a calibrated Range 0-250*F themometer or equivalent in contact with the surface to be coated. The thermometer probe shall remain in contact with the surface until the tenperature reading stabilizes.

Minimum and maximum values of surface and ambient temperatures shall be 50* F and 100*F respectively.

Infrequent dips in temperature to 40*F is pemissible during application and/or cure; howeve r, the elapsed time the temperature is below 50*F shall be added to the cure time.

Application of the coating shall not begin unless the surface teaperature is 5'F above the dew point.

Humidt ty may vary as high as 100%; however, free standing water shall be removed.

Coating application over a damp surface is pemissible. Under no conditions shall NUTEC 11S or Nutec 11 be applied to a surface containing free standing water. (Reference Attachment 6).

3.3.1.1 Documentation of Environmental Conditions a.

The Inspector assigned to the " paint di stribution point" in the Reactor Building shall, as a minimum, take a complete set of readings (air tenperature, relative humidity, dew point and surface temperature) on each floor elevation at least three (3) times each shift (preferably, the beginning, id point, and just prior to the end of each shift). More readings may be taken when necessary (i.e., noticeable change in air tenperature, request by field inspector to take readings in a specific area, etc.).

a, i

%g, TUGCC CA

1 INSTRU ON REVISION PAGE TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

JUL 11 1984-6 of 32 1

=

b.

The Inspector at the " paint distribution point" shall document these readings on Attachment 4 as follows:

1.

T'he Inspector shall fill in the applicable infornation as delineated on the fo rm, exceot fo r the "Repo rt No.

(The Fport No. will be filled in by tne Paper Flow Group when they assign numbe rs, prior to transmitting to.the QA vault.)

I 2.

Upon conpletion of the shift, the inspector shall i

turn all of the Environmental Log Sheets for that shift into the lead inspector (s).

c.

The lead - inspector (s) shall review the log sheets for completeness and correctness, sign and da te the "QC Review" block, obtain copies for QC reference and transmit the originals to the Paper Flow Group.

-d.

If at any time the inspector determines readings which do not comply with the paraneters set forth in this procedure, he shall proceed in the following manner:

1 1.

Immediately take an additional set of readings in the immediate area of the first set of unacceptable readings and record them on the Envirormental Log.

2.

If the additional set of readings are acceptable, take a third set of readings for referee purposes dnd record them.

If the referee set of readings are acceptable, then tne area in question is acceptable but should be closely monitored with readings as necessary.

3.

If the additional set of readings is unacceptable and/or the referee set of readings is unacceptable, the inspector is to notify the coatings inspectors i

in the areas affected so that coating work may be stopped at that time.

Coating wo rk shall not continue until the ambient conditions resume an acceptable status.

1 1

4.

When unacceptable ambient condi tions occur and are. verified by Step 3 above, the Inspector shall doctanent it on a Nonconfonnance Report (NCR) in accordance with Reference 1-C, and adequately identify the affected areas / elevations.

4

%g, TUGCO OA

PROCEDURE ISSUE REVISION PAGE NUMBER DATE a

TEXAS UTILITIES GENERATING CO.

USES QI-QP-11.4-27 6

J{J{,11 198 7 of 32 P.

i 3.3.2 Surface Acceptability The QC inspector shall visually examine the substrate surface immediately prior to surfacer application to verify that it is free of contamination (dus t, laitance, loose deposits and markings).

3.3.3 Air Supply Acceptability The inspector shall inspect the air supply systen for suitable filters / traps / separators.

The effectiveness of these itens snall be verified by exposing a piece of white cloth to a blast of air for approximately 30 seconds.

The cloth shall show no evidence of moistu re, oil or foreign matter den examined.

3.3.4 Pot Life The QC inspector shall verify that the pot life as shown in is not exceeded.

3.3.5 Qualification of Applicator (s)

The Inspector shall verify (by Qualification Record or list of qualified applicators fran QA file) that the coating applicators on each shift are qualified for safety-related coating wort.

3.3.6 Ory Film Thickness The QC inspector shall detennine the DFT of the applied surfacer by taking wet film thickness spot measurements and multiplying each reading by the % volume solids (taking in 4

account any thinner used).

A minimum of five (5) separate spot wet film thickness (WFT) measurements (See Nota 1) spaced evenly over the coated area shall be taken for every 100 square feet of coated su rface.

For areas less than 100 square feet, Refer to Note 2 below.

NOTE 1:

A spot measu renent is a

series of three measurements in the same general area.

The WFT gage should be moved a short distance for each gage reading.

Discard any unusually high or low gage reading that cannot be repeated consistently.

Take an average of these three gage readings as one spot measurenent.

9 TUGCO oA 3

b PROCEDURE REVISION ISSUE NUMBER DATE PAGE TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

Jg(111984 8 of 32 NOTE 2:

Five -spot tests shall be taken for every 100 square feet of coated su rface.

For areas less than 100 square feet, the following shall apply:

Area Sq. Ft.

No. Spots 100-80 5

80-50 4

50-10 3

10-3 2

3-0 1

Thickness of Nutec 115 may vary between 10 and 35 mils.

Nutec 11 may vary between 3 - 20 mils. (See Attachment 3 for method of determining percent volume solids.)

NOTE 3:

Tack free times shall be as follows:

Temperature *F

  1. 11

.#115 50 - 59 6 hrs.

8 hrs.

60 - 79 4 hrs.

6 hrs.

80 - 99 2 hrs.

4 hrs.

100 1 hr.

2 hrs.

Temperature 'F Full Cure 11. Ils 50 - 59 10 days 60 - 69 8 days 70 - 79 7 days 80 - 89 6 days 90 - 100 5 days 3.3.7 Monitoring of Surfacer Application Monitor the surfaces where NUTEC 11S or riutoc 11 is being applied to assure that 'it is not being applied to a surface containing free standing water.

(Application of ils over a damp surface is permissible.)

Reference Attachment.6.

Verify that the pot life as stated in Paragraph 3.3.4 is not exceeded.

3.3.8 Surfacer Repair Work 3.3.8.1' Repair cf Runs and Sags Runs and sags which show no evidence of mudcracking shall be abraded flush with the surrounding surface.

If after 3

TUGCO CA 1

5

~

l INSTRUCTION ISSUE REVISION PAGE TEXAS UTILITIES GENERATING CO.

.11,11.11. NN 9 of 32 QI-QP-11.4-27 6

abrading, surfacer is unsatisfactory due to.mudcracking remove unsatisfactory coating to substrate and reapply the su rfacer.

If after abrading the surfacer is satisfactory, no further repair is necessary.

3.3.8.2 Repair of Contamination Contamination shall be renoved by abrading.

If unsatisfactory coating still exists, then the area shall be repaired in accordance with Section 3.3.8.3.

NOTE:

Rust stains residue, not necessarily the stain, shall be renoved with bristle brush and water or Imperial Thinner #0L-54.

3.3.8.3 Repairs When Touch Up or Recoating is Necessary For repain that require either ' touch up or recoating with NUTEC 115, NUTEC 11 or NUTEC 1201, the QC inspector shall:

a)

Verify ambient conditions are acceptable per Section 3.3.1.

b)

Verify the surface has been prepared ' in accordance I

with Sec. 3.3.8.2 and is free from loose and foreign materials as per Section 3.1.4 and/or Paragraph 3.5.6.

c)

Verify acceptable materials are used, and shelf life is not exceeded.

d)

Verify' that NUTEC 115, NUTEC 11 or NUTEC 1201 is mixed / thinned in accordance with Section 3.2.

e)

Verify pot li fe is not exceeded per Attachment 2.

f)

Verify qualification of applicator (s) per Section 3.3.5.

g)

Visually inspect per Section 3.4.2.1.

h)

Verify that curing is in accordance with Section 3.4.2.2.

1)

Verify dry film thickness in the repair area is in accordance with the following millage requirements:

NUTEC 115 10 - 35 mils NUTEC 11 3 - 20 mils NUTEC 1201 3 - 16 mils m,

Tucco cA

1 INSTRUCTION R'EVISiON ISSUE PAGE

^

TEXAS UTILITIES GENER TING CO.

CPSES j

QI-QP-11.4-27 6

jyl111984l 10 of 32 NOTE 1:

See Section 3.3.6 and Attachment 3 fo r DFT calculation using Wet Film Thickness measurement i

and percent volume solids.

I 3.3.8.4 In-process repairs shall be documented on the Traveler in accordance with Reference 1-B, (Attachment 1) showing their l

status and/or completion.

3.4 FINISH C0AT PREAPPLICATION 3.4.1 Prespolication Inspection 3.4.1.1 Anbient Conditions Prior to finish coat application, the QC inspector shall detennine ambient conditions in accordance with Section

3. 3.1.

3.4.2 Surfacer Post Application Operation 3.4.2.1 Visual Defects Inspection The inspector shall perfonn a visual inspection of the surfacer coat NUTEC 11S and NUTEC 11 prior to the finish coat application for the following defects:

a)

Runs and sags which show no evidence of mudcracking shall be abraded down to adjoining coating thickness.

b)

Stains - rust (red) and zinc oxide (white) stains are acceptable provided loose particles are removed from NUTEC 11S or NUTEC 11 surfaces prior to application of finish coat.

c)

Damaged areas, skips, dry spray, holidays, blisters, bubbling, nudcracking, oil and grease, contamination are all unacceptable and shall be renoved and repaired in accordance with the applicable subsection of 3.3.8.

NOTE:

Ha1rline cracks appearing in concrete coatings after application are acceptable provided coatings show no loss of adhesion.

3.4.2.2 Surfacer Cure The inspector shall monitor ambient temperature after the surfacer is applied to detennine when cure is adequate for

%g, TUGCO CA

TEXAS UTIUTIES GENERATING CO.

CPSES QI-QP-11.4-27 6

JUL 111984 11 of 32 finish coating operations to conmence.

A calibrated non-mercury filled dry bulb thermometer or a calibrated tenperature recorder (Bristol 4069TH cr equivalent) shall be used for air temperature detennination.

Curing time shall be as follows:

Curing Time Before Temperature 0*F Topcoating with 1201 50-59 72 hrs.

60-69 48 hrs.

70-79 24 hrs.

80-89 18 hrs.90-100 12 hrs.

Temperature durations below 50*F will be added to the cure time on an hour for hour basis.

4 NUTEC 115 may be touched up or recoated with fli or #11S as soon as the initial coat has dried such that the paint shall not adhere to the thumb when downward pressure is exerted on the paint film dile turning a 90* angle.

(This does not refer to the two pass application method.)

3.4.3 Mixing Operations 3.4.3.1 Materials 1

The QC Inspector shall verify on Attachment 5 that shelf has not expired.

3.4.3.2 Mixing / Thinning An Inspector shall witness all mixing / thinning operations per Attachment 7.

Induction times for finish mixes are shown in Attachment 2.

3.5 FINISH COAT APPLICATION 3.5.1 Air Supply Acceptability The QC inspector shall verify the air supply is acceptable per Section 3.3.3.

%g, TUGCO CA

+

w e

---s

--wwc-

--w---

v er-~ne

-n--

r w-~

~

,-r-e w

s-f

--wwm-w---*w vw w

INSTRUCTION ISSUE REVISION PAGE TEXAS UTILITIES GENERATING CO.

QI-QP-11.4-27 6

jgg,111984 12 of 32 l

3.5.2 Qualification of Applicator (s)

~

The Inspector shall verify (by Qualification Record or list of qualified applicators fran QA file) i.ha t the coating applicators on each shift are qualified for safety-related coating work.

3.5.3 Pot Life I

The QC inspector shall verify that the pot life of NUTEC i

1201 has not been exceeded.

Pot life is shown on.

3.5.4 Dry Film Thickness The inspector shall detennine the DFT of the applied finish coat by taking wet film thickness spot measurements and multiplying (,each reading by the % volume solids.

A minimum of five

)

separate s wet film thickness (WFT)

(See Note 1) pot measurenents spaced evenly over the coated area shall be taken for every 100 square feet of coated surface.

For areas less than 100 square feet, refer to Note 2 below.

1 NOTE 1:

A spot measu renent is a

series of three measurements in the same general area.

The WFT gage should be moved a short distance for each gage reading.

Discard any unusually high or low gage reading that cannot be repeated consistently.

Take an average of these three gage readings as l

one spot measurenent.

(

NOTE 2:

For spot test areas, Ref. Sec. 3.3.6 Note 2.

(See Attachment 3 for method of detennining percent volume i

solids.)

3.5.5 Monitoring of Finish Coat Application a.

During application of finish coat, the inspector shall monitor the wet film to assure no fish eyes appear.

If fish eyes occur, the inspector shall notify the paint forenan of their presence.

Fish eyes should be renoved while the coating is still wet, previous coat (surfacer) cleaned with solvent and finish coat reapplied, b.

If applicable, the inspector shall monitor that the hose length does not exceed 75 feet.

TUGeo oA

1 s

1 INSTRUCTION ISSUE REVISION PAGE TEXAS UTIUTIES GENERATING CO.

CPSES JR111981 13 of 32 QI-QP-11.4-27 6

c.

Monitor the cure time for recoat of NUTEC 1201.

Recoating time of NUTEC 1201 is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The total DFT of NUTEC 1201, recoat and existing coat shall not exceed 16 mils.

~

3.S.6

. Finish Coat Repairs For repairs in the NUTEC 1201 Finish Coat, the QC Inspector shall verify the following:

a)

The inspector shall detennine the DFT of the existing

~

coated surface (prior to recoating) by either, or one of the two following methods.

1)

Using the DFT readings acquired during the backfit doctmentation.

2)

The scratch test of the tiUTEC 1201 finish coat shall be performed using a Mark II Tooke-Inspection Gage equipped witn a 2x tip.

Five separate readings spaced randomly over each finish i

coated area of 100 square feet shall be taken.

For areas less than 100 square feet, Note 2 of Section 3.3.6 shall apply.

b)

Repairs of Runs / Sags Runs / sags showing evidence of truderacking shall be removed.

Runs or sags which exhibit no other coating defect shall be abraded to the thickness of adjoining coatings.

1)

Verify that all loose particles and foreign particles are removed from surface.

2)

Verify that the surface is solvent wiped.

3)

Perfonn inspections in Sections 3.2, 3. 4.1, 3.5, and 3.6.

c)

Repair of Scratches and/or Damaged Areas Any scratches or damaged areas shall be abraded until loosely adherent particles are renoved.

The following minimum coating requirements _ shall be maintained for damages extending to concrete:

%g, TUGCC CA

._,-.--.-- -, ~ - -

~ --

INSTRUCTION ISSUE REVISION PAGE TEXAS UTIUTIES GENERATING CO.

^

CPSES QI-QP-11.4-27 6

JUL 111984I 14 of 32 I

=

Damage 1/2" or less regardless of length -

no additional surfacer required prior to topcoat.

Damage greater that 1/2" in width - nonnal coating system required.

When perfQnning surfacer and/or topcoat repair work, and the damaged area is 2 sq/ in. or less in size, or the damage is a scratch 1/4 in, width or less, regardless of length, substantiating or recording wet film thickness of the damaged area repair shall not be required.

NOTE:

Hairline cracks appearing in concrete coatings after application are acceptable provided coatings show no loss of adhesion.

~

d)

Repair of Contamination The QC inspector shall verify 'that contamination is removed by abrading and the surface recoated.

The inspector shall perfonn inspections delineated in Sections 3.2, 3.4.1, 3.5 and 3.6.

e)

Repair of Pinholes and Small Discontinuities 1)

Verify all loose particles are removed and area is solvent wiped.

2)

Pinholes and small discontinuities may be repaired at the time of final inspection without a later reinspection of the repair.

The inspections in Section 3.2, 3.4.1, 3.5 and 3.6 still apply.

f)

Repair of Dry Spray Repair of dry spray identifiable by visual inspection defined within this prqcedure shall be removed.

(A minor amount of adherent dry spray is acceptable on the final finish coat.)

1)

Verify all loose particles are removed.

~

2)

Verify coating film thickness is still within allowable range.

Tucco cA

.- ~~ - _. _.

~'

~

  • i].

INSTRUCTION IS UE REVISION I

TEXAS UTILITIES GENERATING CO.

^

PAGE

.s CPSES QI-QP-11.4-27 6

Jul.111984 15 of 32 i

')

3)

If film thickness is not within allowable range a

perfonn inspections in Sec. 3.2, 3.4.1, 3.5 and 3.6.

g)

Repair of Excessive Orange Peel 1)

Verify the affected area is abraded and solvent wi ped.

2)

Verify the affected area is refinished and perfonn the inspections delineate 1 in Section 3.2, 3.4.1, 3.5 and 3.6 if required.,

h)

Repair of Gloss and Color Nonunifamity 1)

Verify the.affected area is solvent wiped.

2)

Verify the affected area is recoated without exceeding the neximum film thickness and perfonn inspections in Sections 3.2, 3.4.1, 3.5 and 3.6.

3)

Top coated areas which.have been abraded for various reasons (i.e., runs, sags, high millage, etc.)

and are within acceptable procedural thicknes s, following repai rs, do not require recoating for gloss enhancing.

4)

For small repair areas such as pinholes, color and gloss unifonnity is not required, provided the coating is smooth and continuous.

NOTE 1:

If present, the tie in interface between concrete coatings and steel coatings shall be vi sually inspected during the finish coat final acceptance of both coating systems.

s NOTE 2:

(If applicable) coating interface - at coating interface for finish and or primer coat, the existing coating shall be " feathered back" a sufficient distance to ensure a smooth final coating systen. When perfonning coating interface the interface of the coating of systens shall be

^

a neximum of ih inch in width. Within the interface area overlapping of any materials or systens is acceptable.

TUGCC oA

_ _ _. ~..

]

i 3

INSTRUCTION REVISION ISSUE TEXAS UTILITIES GENERATING CO.

^

PAGE j

CPSES QI-QP-11.4-27 6

Jy(111c84 16 of 32 4'l NOTE 3:

Repair and touch-up - For repair and/or touch-up purposes, Nutec filS or #11 surfacer may be placed over the initial systen as required to ccurplete the required repair or touch-up.

Roughen the topcoa t, if present, by sanding, or stoning prior to applying repair surfacer, f

3.5.6.1 In-process repairs shall be doctanented on the Traveler (Attachment 1) showing their status and/or cooIletion.

3.6 FINISH CDAT FINAL ACCEPTANCE INSPECTION PRIOR TO AREA TURNOVER A final visual inspection in accordance with the following subsections _ shall be perfonned on exposed finish coated concrete substrates.

3.6.1 Finish Coat Cure Prior to perfonning finish coat final acceptarce inspections, the inspector shall verify that the finin eat c has cured for the minimum of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.6.2 Finish Coat Continuity Inspection The QC Inspector shall visualbf inspect the continuity of the finish coat. The maximum number of permissible pinholes is shown on Attachment 3.

No more than 2 points of discon-tinuity shall occur within an area having a radius of six inches (using a p int of discontinuity as the center of the circle).

No more than 40% of the total number of allowable points of discontinuity shall occur within any one area equal to 25% of the total area. The pinholes that are beyond the acceptance of Attachment 3 shall be repaired in accordance with Section 3.5.6.

3.6.3 Visual Examination The QC inspector shall visually examine the finish coated surface for the following defects:

a)

Runs and sags which show no evidence of mudcracking are acceptable.

Unacceptable runs and sags will _be repaired in accordance with Section 3.5.6.

b)

At the time of the final inspection, pinholes and small discontinuities nay be repaired with no later reinspection required of these areas.

%g, TUGCC CA

1 INSTRUCTION ISSUE REVISION PAGE N

TEXAS UTILITIES GENERATING CO.

AE CPSES JUL111 Bf17 of 32 QI-QP-11.4-27 6

c)

Ski ps,

holidays, color and gloss nonunifo nni ty, excessive orange, peel, dry spray, damaged areas, blisten, bubbles, and fish eyes will be repaired in accordance with Section 3.5.6.

d)

Contamination is unacceptable.

Area must be repaired per Section 3.5.6.

NOTE:

Minor repairs limited to 4 square inches or less and requiring finish coat only may be performed at the time of final inspection without later rein-spection of the repair. Conditions may exist which will warrant reinspection at the inspector's discretion.

3.7 NONCONFORMANCES

~

3.7.1 Unacceptable conditions which are not readily repaired or corrected per the approved procedures shall be documented as unsatisfactory on the inspection traveler.

3.7.2 Nonconfonning conditions such as coating failure due to loss of adhesion or indetenninate/ unacceptable conditions which cannot be repaired or corrected as per existing procedures

-shall be docunented on a Nonconfonnance Report (NCR) in 3

i accordance with Reference 1-C.

The NCR number shall be referenced on the inspection traveler, if applicable.

3.8 DOCUMENTATION (REFER TO ATTACHMENT 1) 3.8.1 A'11 inspections required by this procedure shall be recorded in the inspection attributes on the back of the travelers (Attachment 1).

Preparation and processing of the traveler shall be per Reference 1-8.

3.8.2 When the inspections required by Sections 3.1 through 3.2.2 have been satisfactorily completed, Step 1 shall be signed and dated by the inspector.

3.8.3 When the inspections required by Sections 3.3 through 3.3.7.2 have been satisfactorily com Step 2 (for NUTEC 11S) or Step 4 (for NUTEC 11) pleted, shall be signed and dated by the inspector and the other Step ma rked not applicable (N/A), initialled and dated.

gg, TUGCC CA

~

INSTRUCTinN ISSUE REVISION N

ER DATE PAGE TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

JU(11 fcgq 18 of 32 3.8.4 When the inspections required by Sections 3.3.8 through 3.4.2.2 have been satisfactorily completed, Step 3 (for NUTEC 115) or Step 5 (for NUTEC 11) shall be signed and dated by the inspector and the other Step marked not applicabic (N/A), initialled and dated.

3.8.5 When the inspections required by Sections 3.5 through 3.5.5 have been satisfactorily capleted, Steo 6 shall be signed and dated by the inspector.

3.8.6 When the inspections required by Sections 3.5.6 through 3.6.3 have been satisfactorily' completed, Step 7 shall be signed and dated by the inspector.

3.9 CLARIFICATION 3.9.1 Repair of Mechanical Damage to Completed Itens 3.9.2-Areas that have been completed, inspected, accepted and traveler package closed which incur major damage' at a later date may be

repaired, inspected and documented on

" Concrete Protective Coating Inspection Repair Traveler". Otherwise, the minor areas of mechanical damage, which occur after completion of an area, will be repaired during the final protective coatings walkdown Reference CP-EI-4.0-51.

3.10 INACCESSIBLE / LIMITED ACCESS AREAS If questions arise concerning inaccessible or limited access areas per (Reference 1-A) nondeleterious embedded foreign material in the final finish coat, the above condition (s) will be evaluated by the Project Civil Engineer or designee.

Clarification and acceptance of the above stated condition (s) shall be so denoted by signature of the Engineer with date and comments as required, in the comments section of the applicable step.

3.11 ATTACHENTS 3.11.1, Concrete Protective Coating Inspection Traveler" 3.11.2, " Shelf and Pot Life Reference Sheet" 3.11.3. " Allowed Points of Discontinuity Table" and "0FT Detennination"

%g, TUGCC CA z

-m,

INSTRUCTION ISSUE REVISION N

BER DATE PAGE TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

JUL 111984 19 of 32 3.11.4. " Environmental Log Sheet" 3.11.5 " Paint Mix Slip" 3.11.6, " Definitions" 3.11.7, " Preparation of Coating Materials" 3.11.8 A, " Table for Partial Mixing of NUTEC 11S" 3.11.9 Attachmific 78, " Table for Partial Mixes of NUTEC 1201" 3.11.10. " Concrete Protective Coating Repair Traveler" a

pon %,

TUGCC CA n


n a.

-arnn.---,,,

N INSTMUCTION ISSUE REVISION PAGE NUMBER Op' TEXAS UT!UTIES GENERATING CO.

CPSES QI-QP-11.4-27 6

JUL 111984 20 of 32 ATTACliMENT 1 CONQtETE PROTECTIVE COATING NSPECTION TRAVELER woRR PII&w PCI TRAVELet #

ELEVANE'

! TEM # # DESCRIPTION RER owes.

PaEPARa svi CATE STEP SURFACE PREPARAftces mspecTED ANO FouNo ACCEPTAsLE PER et-4P 11.4-2T A40 RELEASED FOR NuTEC us APPt4AMON.

I msPECTOR DATE couMENTE STEP NUTEC lls SURFACER AFPUCAT10N VE9tFIED ANO INsP9CTE0 IN eernananecer wlTH QI-QP 14-87 A40 FOute0 ACCEPTASLE.

E INSPECTOR DATE 4

=

comuseTs STEP

'"#nC ns suRFACM PnEPARAriON asPECTED ANo pouNo accEPTAstE Pet ot-op IL4-af ANO RELEASED FOR FuRTum CoATINs ACTiv TIES.

180sPECTOR DATE 3

ceuumis 3TEP NuTECll suRFACSt APPUCAT10M ValFIED ANO WesPECTED se wiTM et-op IL4-aTAND FOuMo ACCEPMsLE.

sesPECTOR DATE 4

i comucats STEP-NuTECis sustFACER PREPARAllose WSPECTED ANO FOUNO ACCEPTAsLE PUt 01-0P IL4-ET ANO RELEASE 0 FOR FURTHm CCATmG ACT1VITits, i

sesPECTop OATE 5

comuesTm STEP NuTEC 205 TCGGAT APPUCATION VERIFIED AND iMSPECTED IN l

  • eeamaa "

WITM 41-oPIL4=ET AND FOUNO ACCEPTAsLE.

f 6

sisPECTOR OKrt comm T.

STEP FINash coat usPECTED seR nNaa. AuariANCE ANO FOuMO AccEPTAsLE ssAccorauscE wlTM er-4P s.4-8T 7

sisPECTOR DATE cenauerTs STEP couPLETtoss OP sesPECTiose TRAvtLat vtRinED.

eC REvtitw OATE S

ceneserts i

N I) DecladENT sesPECfl00s ATTRIGUTEs cet ATTACHED suPP08tTiers OocusserTATion amerTts:

O 23 00cuuof? REPAuts ANO ATTRIOUTEs.tr REQUtRED,0N ATTACHE 0 T

SUPPORTING 00CutsO TAT 10ft sM8tETisi E

31 Poa ENviRoNise TAL coNo Tions REFERosCETut S

esviRoNestmTAs. Loe, a

43 00cunsENT NUTEC 10 APruCATices ON ATTACHED SUPPORT 190s 00CubeDETATIces shut.

i I

Lg, TtJGCCCA

f INSTRUCTION IS U REVISICN PAGE NUMBER CATE TEXAS UTluT1ES GENERATING Co.

JUL 111984 21 of 32 QI-QP-ll.4-27 6

T ATTACHMENT 1 (Continued)

)! [

v E

5 5

5 g

I ii i l t

8..

led B

hh

[

=,.

y So g g I

g-m 8 ::m m

O 53 5 22 e.a g

1 4

~

In

~

- n6 e s 5

1 I Es

=

TtJGCC CA p,- -

- < +,

-v-.

~

mg..

g.,+--

,,,y

,w,-

--,o,,

m e,

e

.,,w,

-e

-,m-w.,

a.--

ISSUE PROCEDURE REVISION PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.

I 22 of 32 CPSES QI.qp.11.4-27 6

JUL 111984 l

I t

ATTACHMENT 2 SHELF AND POT LIFE REFERENCE SHEET Material Shel f Li fe 4

Nutec 11 Base & Curing Agent 12 months Nutec 11S Base & Curing Agent 12 months Nutec 1201 Base & Curing Agent 12 months Thinners and Sand Filler Unlimited POT LIFE NUTEC 11 AND NUTEC 11S 2.o) 1.u-Mrs.' s$

\\

i an -

Alarge IIS 25

....i....i....i.......i....i.,,i...,

,,,,i,

..ri...l...,I 40*

so=

do*

To*

Lo*

sce too*

TEMAc2A72/22" *F NUTEC 1201 24 :

se

  1. 41 2

so -i

+i

....i....i....ii..,i....I....I,,,,I...,t,,,,I m iI,,,,lii,,I 50*

60*

To*

Bo*

90*

I00*

TAMPEiEWTUA26 *F INDUCTION TIMES FOR NUTEC 1201 Temp. (*F) 50-59 45 min.

60-69 30 min.

70-79 20 min, j

80-90 10 min.90-100 None

.I l

TUGCC CA l

.,. -=.

PROCEDURE ISSUE l REVISION PAGE NUMBER OATE TEXAS UTILITIES GENERATING CO.

CPSES QI.QP.11.4 27 JUL 111984 23 of 32 6

ATTAOiMENT. 3 PART I Allowed Points of Discontinuity Table Total Allowable Number of Surface Area (sq. f t.)

Points of Discontinuity Up to 10 1

10-50 2

50-100 5

100-500 10 500-1000 15 1000-5000 25 No gross discontinuities are acceptable.

PART II Dry Film Thickness Detemination Using Wet Film Thickness Readings and the Percentage (%) Volume Solids Percent volume solids for unthinned concrete coatings are as follows:

NUTEC 11 78%

NUTEC 115 88%

NUTEC 1201 54%

EXAMPLE: 11 mils WFT X 54% = 5.94 mils DFT For thinned mixes:

Volume of unthinned coatinq 1 Volm Solids = Volume of unthinned coating + Volume tninner X

% Volume Solids (unthinned)

NOTE:

In above equation, volume must be expressed in the same unit of measure.

TUGCO CA

INSTRUCTION ISSUE REVISICr' PAGE NUMBER OATE TEXAS UTluTIES GENERATING CO.

CPSES JUL 111984 QI-QP-11'.4-27 6

24 e 32 ATTACHMENT 4

=

Report No.

Sheet of sneet _

Sheet Number ENVIRONMENTAL LOG SHEET M&TE 8's E1ention 81dg.

Da te

$htft Unit INSPECTOR TIME ORY SULB WET BUL8 SURFACE TEMP.

HUM 10!TY DEW POINT STEEL ! CONCPETE i

f OC REY!EW signature Date penn m,

T1.'3CC CA

INSTRUCTION ISSUE REVISION PAGE NUMBER DATE TEXAS UT!UTIES GENERATING CO.

CPSES QI-QP-ll.4-27 6

JUL 111934 25 f 32 ATTACHMENT 5 4

PAINT MIX SLIP Report.%.

81dg.

DATE POT LIFE SHIFT TIME MIX NU8p*R _

ELDATION MATHIAL GAL. MIXED SHELF LIFE ACCEPATSLE: YES NO M&TE s's DATE & TIM MIXED BASE CUR!)e6 AGENT' FILLER THINNED ACCEPTED sv DATE POT LIFE SHIFT TIME MIX NUMSG ELDATION MATERIAL GAI.. n!XED SHELF LIFE ACCEPTA8LE: YES NO MATE #'S DATE & TIME MIXED 5ASE CURING AG B T FILLER THIMMER ACCEPTED SY DATE POT LIFE SHIFT TINE MIX NIMIER E'.DATION M TERIAL GAL. MIXED SHELF LIFE ACCEPTA8LE: YES NO MSTE t's DATE & TIME MIXED BASE CURING AGENT FILLER THINNER ACCEPTED BY QC RU!EW & ACCEPTANCE stgnacure cete P

me

-e-y-

-w-r-

+

w w-w-mww7,w.,ur p-r

--e.vw p-*-ww


y---,rw-w--amqvyw-.g--

m,,

y w-w-------y,w-r yy y-,

ww

-n-m, y.-p y-y-y+-y-.-

--.w-.

-n---

f PROCEDURE ISSUE REVISION PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-27 6

JUL 111984 2s of 32 ATTACHMENT' 6 DEFINITIONS Color and Gloss Nonunifonnity:

A milky haze or mist in the finish of a recently applien coating.

Contaminant: _ A foreign substance, inadvertently added to a coating or found on the substrate that adversely affects the application, adhesion, curing and/or subsequent perfonnance of the applied coating.

Dry Soray:

A dry powdery primer or finish coat readily renoved by light sanding with either sandpaper or a wire screen.

A minor amount of adherent dry spray is acceptable on the final finish coat.

Feathering:

An area that is roughened and tapered to obtain a smooth '

and continuous surface with an existing damaged coating.

Fisheyes:

Small openings

(" fish eyes") in wet film exposing old surface or previous coat.

Free Standing Water: May be identified by:

a.

Reduced viscosity of the surfacer during application, and excessive sagging from bug holes.

b.

Wet rings around bug holes, c.

Visible signs of surface water.

d.

Running hand over the surface resulting in moisture on the hand.

e.

Product instability resulting in white streaks.

f.

Failure of the surfacer to adhere to the substrate during the sqeegeeing or troweling process.

l Full Hiding:

The coating provides sufficient coverage so that the preceding coat is not readily visible with an unaided eye.

l Holiday:

A pinhole, s ki p, discontinuity or void in coating film.

Laitance: A fine, whitish accumulation on concrete surfaces.

It con-sists mainly of cement particles that were carried by water rising to the surface of freshly placed concrete. The resulting concrete surface is unsuitable for proper adhesion or bond of subsequent fillers or protective coatings.

Monitor: Confonnance verification by physically observing a task being perfonned on a periodic or random basis.

TUGCO CA m,

~a.

V.,

1 Y

PROCECURE ISSUE REVISION PAGE d

NUMBER DATE v

TEXAS UTILITIES GENERATING CO.

CPSES QI.Qp.11.4 27 6

JUL 111984 27 of 32 h.

I a

l Mudcracking:

Irregular cracking as in a dried mud puddle.

Orange Peel: Dents in the surface resembling orange skin. A moderate amount is acceptable.

Over Spray:

A deflected spray mist that settles on dry or partially dry coated surfaces.

Pinholes:

Minor discontinuities in coating which expose primer or substrate.

Verify: Confirm or make certain.

Visual:

To examine with an unaided eye (correctional eye glasses or

. contact lens are acceptable).

t

,)

1 t

i

'3 j

U

-TUGCC OA

~

.i i'

PROCEDURE ISSUE REVISION PAGE NUMBER DATE l

TEXAS UTILITIES GENERATING CO.

CPSES QI.qp.11,4 27 Jul.111984 28 of 32 6

5 y

u 6

l ATTACHMENT 7 i

PREPARATION OF COATING MATERIALS Surfacer Coat The surfacer, NUTEC 115, is packaged in a three camponent kit consisting of a base, curing agent, and filler.

The base and curing agent shall be thoroughly mixed first.

If necessary, box the mixture to assure that all the base and l

NJ

~'

cure has been used. The filler shall then be slowly added under constant agitation and mixed until a smooth blend is achieved. The patching material, NUTEC 11, is prepared the same way. Partial mixes for NUTEC 11S shall be in accordance with Attachment 7A. No provision is given for partial mixes of NUTEC 11.

Finish Coat l

The finish coat,.NUTEC 1201, is a two caponent epoxy topcoat consisting of a base and cure.

These shall be-thoroughly mixed under constant agitation until a homogenous blend is achieved.

Partial mixes of NUTEC 1201 shall be in accordance with Attachment 78.

Minimum induction times shall be as per Attachment 2.

SEALER / CURING COMPOUND i

The sealer / curing campound, NUTEC 10, i.s nomally a two component material consisting of a base and a curing agent.

If applying to surfaces below 60*

F, a third camponent accelerator may be used.

Slowly mix by power agitation or by hand the entire volume of the cure caponent with the entire volume of the 'Jase camponent.

If an accelerator is used, add the preseasured portion to the base-cure mixture and agitate slowly.

Avoid rapid agitation which may result in air entrapment. Thinning may be perfomed by adding fram i

10-40% by volume #DL-56 solvent.

Do not vary mixing proportions.

I

't i

l' n

TU"40 oA

, - - -, +

.,,,--,,---,-.,,,e-.---,-p

-,,----,,-,--------,n,

,,-,---w,---<e~<

r

N INSTRUCTION ISSUE EN SE DAM N

TEXAS UTluT1ES GENERATING CO.

CPSES

.j QI-QP-11.4-27 6

JUL 111984 29 of 3z t

U j

g ATTACHMENT 7A TABLE FOR PARTIAL MIXING OF NUTEC 11s I

arrts

  • TT s 4ASE CURE IILLIA y

Ibs)os.

Its.l os. i its.

ca.

sts., oa.

, 7-l 6.3 l1.8 I Ot.

10.8 0

O Gal.

3 0

0

\\

l12.4 ll l3.2 2 Ot.

1 51 0

4 0

0 0 Gal.

' *

  • Ga l.' <

9 0

0 l 4.,8 3 On-1 15.1 1

l3

-s 3

, 6.4 1 Gal.

0

  • ,t.

2 10.2 1

f.3 it 0

0 l

I Gal.

1 Ot.

3 4.3 1

15.6 15 0

0 8

I Gal.

2 Ot.

3 15.4 2

5.S 18 0

0 9.8 1 Gal.

3 Ot.

4 f.9 2

12.2 21 0

0 11.2 li2.8 2 sai.

0 Ot.

i 4.5 3

, 2...

24 0

0 3.3 l 27 l15.0 l14.4 2 Gal.

1 Ot.

5 3

0 0

2 Ot.

4 l1.6 3

15.2 30 0

0 l16 2 Gal.

l 4.2 li.5 3 Ot.

7 2 G.i.

4 5.5 u

0 i

l3.2 O Ct.

T 14.7 '4 11.8 38 0

1 3 Gal.

l4.8

,\\

3 Gal.

1 Ot.

8 f.3 5

2.2 39 0

1 2 Ot.

9 3.8 5

8.5 42 0

1 l6.4 3 Gal.

3 Ot.

1 14 5

14.8 45 0

l l5 3 Gal.

0 Ot.

10 9

5 5.1 48 0

I l 1.6 4 Gal.

i Ot.

11 3.5 ' 6 11.4 51 0

1 11.2 4 Gal.

4 Gal.

2 Ot.

11 14.1 T

1.8 54 0

1 12.8 3 Ot.

12 5.0 1

3.1 17 0

1 l14.4 4 Gal.

0 Ot.

13 3.2.

T 14.4 to 0

2 l0 5 Gal.

l i

l I

i I

I 1

r TUGCC CA g9.gg y-e

-w-ry-wr----

M ew pas--u---e---.-r

-e---g----

m--y---qi-3-ysww y--

ew-w

-e-

-mw---

+-

.rve---

---m*-+-*Wwws w-m-+---rw-==wy

=i=------w-g-w-

--W

  • =

'w'--e-ww'-

'r

+

INSTRUCTION ISS E REVISION NUMSER DATE PAGE TEXAS UT!UTIES GENERATING CO.

i CPSES QI-QP-11.4-27 6

JUL 111984 30 of 32 ATTACHMENT 78 TABLE FOR PARTIAL MIXES OF NUTEC #1201 Maxinum Base Cure Permissibl e t

Thinne" Gal.

Qts.

lbsjoz.

Ibs,az, qts. oz.

O 1

2 96 0

'6. 4 0

9.6 0

2 5

3.2 0

12.8 0

19.2 O

3 5

14.4 1

3.2 0

28.8 1

0 10 8

1 8

1 G.4 1

1 13 1.5 1

14.4 1

16 1

2 15 11.2 2

4.5 1 25.6i 1

3 18 4.8 2

11.2 0

3.2 2

0 20 14.4 3

1.E 2 12.8 2

1 23 3

3 0

2 22.4 2

2 26 3.2 3

14.4 3

0 2

3 23 12.8 4

3.2 3

9.6 3

{

0 31 6.4 4

9.6 3

19.2 3

1 34 0

5 0

3 28.8 3

2 36 9'. 6 5

6.4 4

6.4 3

3 39 3.2 5

12.8 4

16 4

0 fl 12.8 6

3.2 4 85.6 4

1 44 0

6 8

5 l 3.2 4

2 f7

'O 6 14.4 5

12.0 4

3 49 11.2 7 14.8 5 p2.4 5

l 0

52 4.8 7l11.2, 6 l0 [

6

%g, 11JGCC CA p

y

l INSTRUCTION ISSUE REVISICN U

NUMBER DATE PAGE TEXAS UTILITIES GENERATING CO.

JUL 111984 QI-QP-ll.4-27 6

31 g 32 i

'l' ATTACHMENT 8 CONGETE PROTECTIVE COATING INSPECTION REPAIR TRAVEL.ER

,=C7mp

-P s'amT==

iriu masscwrnN neR owse.

PaEPanso sTr 04TE swT oF STEP sunPACE PnEPAnAfton WsPECTED ANO PouMO ACCEPTAat.E Pan of-op u.4-gr AMc uLEassa Pon seuTEc Es APPucAficd.

I EISPECTon DATE coneso Tm STEP MUTE ass sunPACEn Arm.iCArioM vEn Pito ANo iMsPsCTEn us tr'r - A W wffM 48-4P IL4-tT AND FOuse0 ACCEPTAaLE.

g IIssPEMn DAfr consessmTs gygp NvTE Ils sunPACEn PnEPAnAT1ofe essPsCTED AfeO FOUNO ACCFTAgt.E Pan es=oP LL4-ST Afe0 MsLsAssD PQn PunTNen CQATING ACnVITits.

IleSPsCfon DATE 3

coisasaf:

STEP MuTEC48 sun.*Acan APPuCADCae VGmED AND NECTED We

- WITH QI-QP IL4-ZTANO PQuMO ACCEP11aLL serscT0m OATE 4,

consasENT3 STEP sevTEC u sunPAcan PnEPAnAflose WesPECTED Ale 0 P0useo ACCsFTasL&

Pan 01-47 it.4-stT AMc nsLEAsto Pan PunTHE': coat 3s0 ACTIVfMEs.

=g M

GATE coensamts STEP MuTEC GCs TwwAT APPUCAUoM VERIFIED AND 68esPECTED de

-" WITH QE-QP IL4-AT Asso PouMO ACCEPTABLE.

g 58sPWftND QATE coisaseste STEP FinisN COAT essPacTEn son FINA4. ACCEPTANCE Asso Fouseo ACcsPTASLE "-*= WITM QI-4P E.*-tT 1

7 88PECM8 OATE consNanTs 4

STEP ComPLETmN oP sePanoM Tnava.sn vEmma.

QC nEVIEW OATE S

comanests N

l) OoCuMOT tNsPET'.CN ATTattuTEs oN ATTACHED suP*oftTING occumsmTAnom sNEETts:

O al coCuisOT mEPAins AMc ATTntauTEs. P nsouinG,oM ATTACM(O T

suPPoltTING DocumetTAT1oM SH E Tts)

E 31 Pon savinchmaxTAa. ecMomous atrEntnCETut S

  • v'88"mEnTA4 i.ca.

41 ocCunaENT MuTEC to AppuCAficN oN ATTACMsD suPPOnTING coCuasceTAriose SHEET.

p.,,,, g,

TUGCC CA

\\

_.. _ _ _ _ -, _ _ _ _. _ _ _. _ _. _. -,..i

-- L-.

INSTRUCTION ISSUE MSlON NUMBER DATE PAGE TEXAS UTIUTIES GENERATING CO.

CPSES JUL 111984 QI-QP-ll.4-27 6

32 of 32 i

ATTACHMENT 8 (Continued) l Ca Ys" I

~

5 5

E l

I s I 1

.5 g

[g E

A e

,s -t 5! !*

I!"il w

p s W8 5E 5!,gll t

m l

cm u_'

g-gg E

xi.

',h al

]-

s j

f s:

i y N O*

g

!:C

~

6

..s.

l I is l

>.L i

TUGCC CA me m,

,