ML20128K100

From kanterella
Jump to navigation Jump to search
Corrected TS Page 3/4 3-49a to Amend 189 to License NPF-1, Reflecting Correct Spelling of Kziu in Items 4.c & 6.c
ML20128K100
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/11/1993
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20128K091 List:
References
NUDOCS 9302180069
Download: ML20128K100 (1)


Text

O l

INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE

  • Snqkg Thermal b.

Train B Elevation 61 ft l

KZlu 6-#6, Zone 3 5

c.

Train A Elevation 65 ft KZIU 6-#6, Zone 4 2

5.

Station Battery Rooms a.

Train A Elevation 65 ft KZIU 6-#6, Zone 2 1

b.

Train B Elevation 65 ft KZIU 6-#6, Zono 1 1

6.

Containment a.

KZlU 6-#5, Zone 2 1

b.

KZIU 6-#5, Zone 3 1

c.

KZiU 6-#19, Zone 3 2

7.

Auxiliary Feedwater Pump Rooms a.

KZIU 6-#16, Zone 1 2

b.

KZiU 6-#16, Zone 2 1

c.

KZlU 6-#16, Zone 3 1

8.

Residual Heat Removal and Safety injection Pump Rooms a.

KZiU 6-#13, Zone 1 2

b.

KZlU 6-#13, Zone 2 4

9.

Service Water Pump Area a.

KZIU 6-#8, Zone 1 1

b.

KZiU 6-#8, Zone 2 1

c.

KZlu 6-#8, Zone 3 1

TROJAN-UNIT 1 3/4 3-49a Amendment No M, 60, 69, 92, 189 9302180069 930211 ESE

^ " "

j