Forwards Corrected Amend 189 to License NPF-1,revising TS 3/4.3.3.7 Re Fire Protection Instrument.Page 3/4 3-49a Retyped to Reflect Correct Spelling of Kziu in Items 4.c & 6.c
ML20128K086
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/11/1993
From: Assa R
Office of Nuclear Reactor Regulation
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20128K091 List:
References
TAC-M84863, NUDOCS 9302180065
Download: ML20128K086 (3)


Text

_ _ _ _ _ - _ - - _

February 11, 1993 Docket No. 50-344 Mr. James E. Cross Vice President and Chief Nuclear Officer Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Cross:

SUBJECT:

CORRECTION OF ADMINISTRATIVE ERROR IN TECHNICAL SPECIFICATION-TABLE 3.3-10, FIRE DETECTION INSTRUMENTS (TAC NO. M84863)

Amendment No.189 was issued for Trojan Nuclear Plant on January 26, 1993.

The amendment revised Specification 3/4.3.3.7, " Fire Protection Instrumentation." This amendment intended to revise the list of fire detection instruments in Table 3.3-10 to reflect modifications made to the fire detection system. Unfortunately, the "KZIV" in items 4.c. and 6.c. in Table 3.3-10, page 3/4 3-49a, was mistyped as "KZUI."

We have corrected "KZVl* in items 4.c. and 6.c. to read "KZ1V" and retyped page 3/4 3-49a to show these corrections.

The corrected page'is forwarded to you by this letter.

These corrections are editorial and do not effect the Amendment No. 189 safety evaluation.

Please place this corrected page in your controlled Technical Specifications.

Original signed by Ramin R. Assa, Acting Project Manager Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION Revised TS page Docket File NRC & Local PDRs PDV Reading File JRoe cc w/ enclosure:

MVirgilio TQuay See next page RAssa DFoster OGC, 15B18 DHagan, 3E36 GHill(2), PI-37 WJones, P370 CGrimes, llE22 ACRS(10), P315 OPA, 2G5 0C/LFDCB, 4503 PDV Plant File Region V(4)

KPerkins. RV i

0FC PDV/LA POV/PM PDV/D NAME DFosterNA/C RAssa:lhh TQuay Y q

l DATE M///Y93 S lO/93 N11/93

/

b\\'

'0FFICIAL RECORD COPY DOCUMENT NAME:TJCOR.LTR'

\\

70074 9302100065 930211 w

yDR ADOCK 0500 4

linD

,os,

psttav y

jo UN11ED STATES l

/.i NUCLEAR REGULATORY COMMISSION l

[

WASHINoTON. D.C. Jones

'f 8

\\,...../

february 11, 1993 i

Docket No. 50-344 Mr. James E. Cross Vice President and Chief Nuclear Officer Portland General Electric Company

!?! S.W. Salmon Street Portland, Oregon 97204 1

Dear Mr. Cross:

SUBJECT:

CORRECTION OF ADMINISTRATIVE ERROR IN TECHNICAL $PECIFICATION TABLE 3.3-10, FIRE DETECTION INSTRUMENTS:(TAC NO. M84863)-

Amendment No.189.was issued for Trojan Nuclear Plant on January 26, 1993.

The amendment revised Specification 3/4.3.3.7, " Fire Protection Instrumentation." This amendment intended to revise the' list of fire detection instruments in Table-3.3-10 to reflect modifications made to.the-fire detection system. Unfortunately, the "KZIU" in items 4.c. and 6.c. in-l Table 3.3-10, page 3/4 3-49a, was mistyped as "KZUI." We have corrected i

"KZUl" in items 4.c. and 6.c. to read "KZIU" and retyped page 3/4 3-49a to show these corrections. -The corrected page is forwarded to you by this letter.

These corrections are editorial and do not effect the Amendment No.189 safety, evaluation.

Please place this' corrected.page in your controlled. Technical Specifications.

sf g i

Ramin R.-Assa, Acting Project Manager Project Directorate V Division of Reactor Projects l!!/IV/V Office of Nuclear Reactor Regulation-

Enclosure:

Revised TS page cc w/ enclosure:

See next page

+.

Hr. James E. Cross Portland General Electric Company Trojan Nuclear Plant cc:

Senior Resident. Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 250 Rainier, Oregon 97048 Mr. Michael J. Sykes, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 Mr. David Stewart-Smith Oregon Department of Energy Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Tom Walt General Manager, Technical Functions Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 97048