Responds to Re Assessment of Operability of Large Diameter Purge & Vent Valves Mfg by Pratt.Purge & Vent Valves Closed & Will Be Verified Every 31 Days When in Modes 1,2,3 or 4
ML20071C764
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/01/1983
From: Westafer G
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
3F-0383-01, 3F-383-1, NUDOCS 8303080077
Download: ML20071C764 (1)


Text

$1@$$$8 eCC{"$ %

GQu 0

e6p%ylel)a

. i3

%u; m 2 Dmwr Power C on Poa aT en=

March 1,1983 3F-0383-01 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Valve Operability of Large Pratt Butterfly Purge and Vent Valves

Dear Sir:

Florida Power Corporation (FPC) hereby responds to your February 16, 1983, letter requesting FPC's assessment of the operability of our large diameter nurge and vent valves manufactured by Pratt. FPC was also requested to inform the NR vhether or not we intend to close the valves and verify they are closed every 31 days wht. in Modes 1, 2, 3, or 4.

FPC has continued its assessment of the operability of the large-diameter Pratt purge and vent valves based on Pratt's findings. Pratt has performed additional tests with elbows immediately upstream and two diameters upstream of the valves with the valve shaft in several positions, including "out of plane." Pratt has assured FPC that in every case, torques were lower than calculated by the analysis program using the existing data base.

However, FPC currently does not have a combined (LOCA and seismic) stress analysis for the valves in the blocked partially-closed position. A proposal has been requested from Pratt to perform the required work. Once this analysis has been completed and reviewed, Florida Power will submit a complete report on the operability of the valves.

FPC has closed the purge and vent valves. We will also verify every 31 days that the valves are closed when in Modes 1,2,3, or 4.

Sincerely,

/

G. R. Westafer I

Manager hpi Nuclear Licensing and Fuel Management I