ML20070V230
| ML20070V230 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/11/1983 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 3F-0283-11, 3F-283-11, TAC-48325, NUDOCS 8302170166 | |
| Download: ML20070V230 (1) | |
Text
. - - -
CCC OC In gG Og
.^
V M
Power CD R FO R 4 ? #0%
February 11, 1983 3F-0283-11 Director of Nuclear Reactor Regulation Attn: Mr. John F. Stolz, Chief Licensing Branch #2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-77 Appendix R to 10CFR50, Fire Protection
Dear Sir:
Florida Power Corporation (FPC) has received and reviewed your Safety Evalua-tion Report on the above subject, dated January 6,1983.
As requested, FPC hereby commits to install a source range neutron flux moni-tor as part of the process monitoring instrumentation at the dedicated shut-down panel. This monitor will be installed in conjunction with the dedicated shutdown panel installation to take place during Refuel V which is scheduled for the Spring 1985.
Sincerely, k
Y Dr. Patsy Y. Baynard Assistant to Vice President Nuclear Operations Bright (AppenR)Df171-1 cc: Mr. J.P. O'Reilly, Regional Administrator Office of Inspecting & Enforcement U.S. Nuclear Regulatory Commission
[ [
101 Marietta Street NW, Suite 3100 q
Atlanta, GA 30303 8302170166 830211 PDR ADOCK 05000302 F
PDR 001let di Assiivo oev a..-.y-fourth Street South e P O Box 14042. St Petersburg. Flonda 33733 e 813-866-5151