ML20064L178
Text
e C
>5 N$ to
'Y
[
UNITED STATES
[y.
~j NUCLEAR REGULATORY COMMISSION AE0D/E206 WASHINGTON. D. C. 20555
- .g
.,g e,.
j MAR 151332 i
i i
1 MEMORANDUM FOR: Edward L. Jordan, Deputy Director i
Division of Engineering and Quality Assurance, IE l
}
FROM:
Carlyle Michelson, Director Office for Analysis and Evaluation of Operational Data t
SUBJECT:
EQUIPMENT MALFUNCTIONS DURING A TURBINE LOAD REDUCTION i
OPERATION AT SALEM UNIT 2 l
~
1 Attached is a memorandum relating to the events that transpired during i
the load reduction transient at Salem Unit 2 on January 14, 1982. Final
[
corrective actions to be taken by the licensee for such an event will be issued at a later date. Region I is pursuing this matter with the licensee j
and we will follow it up.
Based on our review of the final report from
~ 'the licensee and Region I, we will complete our evaluation of the event for
- its generic implications..
j i
)sef M
1 Carlyle Michelson, Director Office for Analysis and Evaluation of Operational Data
}
i t
Attachment:
As stated l
cc w/ attachment:
RDeYoung, IE i
JHSniezek, IE XA DGEisenhut, NRR l
RCHaynes, Region I RWStarostecki, Region I RO
/,005J l
. _.,. _... _.,. _ _