| Site: | Crystal River |
| Issue date: | 11/09/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML20062F901 | List: |
| References | |
| NUDOCS 7812210344 | |
| Download: ML20062F907 (2) | |
See also: IR 05000302/1978025
Text
_
_
,
.
.
,e
- "8 C o,
UNITED STATES
f
o
NUCLEAF4 REGULATORY COMMISSION
O
e
R EGION il
,
"* -
$
1o1 M ARIETT A STREET. N.W.
3*
f
ATLANTA GEORGIA 30303
o
%,'s.
,r
NOV 0 9 B78
In Reply Refer To:
RII:WHB
50-302/78-25
.
Florida Power Corporation
Attn:
Mr. W. P. Stewart, Director
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
~
Gentlemen:
This refers to the inspection conducted by Mr. W. H. Bradford of this
office on October 16-19, 1978, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River 3 facility, and to the discussion
of our findings held with Mr. G. P. Beatty at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Three new unresolved items resulted from this inspection and are
discussed in the enclosed report.
These items will be examined during
subsequent inspections.
(_)
During the inspection, it was found that certain activities under your
'
license appear to be in noncompliance with NRC requirements.
This
item and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
.
I
..
q$I?al034Y
~ ~ * '
.
_-
,
.
.
\\
'
,
NOV03 ;g7g
. .
,,
Florida Power Corporation
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a, copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Roam.
If this report cor.tains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include . full statement of the reasons on the basis of which it is
claimed that d:e information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear f rom you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
\\
'
F. J. Long, Chi e
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice
of \\'iolation
2.
Inspection Report No.
I
50-302/78-25
cc w/ encl:
,
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida
32629
.
$,*
-n
- -- - - , - . - . . - - - - -
.
,.