Responds to 781109 NRC Ltr Re Violations Noted in Inspec Rept 50-302/78-25.Corrective Actions:Formal Qual Training Guide Was Rev,Upgraded & Distrib for Implementation
ML20062F902
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/30/1978
From: Fredonia Stewart
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20062F901 List:
References
NUDOCS 7812210337
Download: ML20062F902 (2)


Text

.

occ u"

^e os 4

jfLl1 6%

hbY$'

h F)\\) b

=

Eg J,h$,Cf' Sh~)UN/

M 30 November 1978 3-0-3-a-2 7

c a., o....n,

CS-78-243 a

Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement License No. DPR-72 U.S. Nuclear Regulatory Commission Ref:

RII: WHB 101 Marietca St., Suite 3100 50-302/78.25 Atlanta, GA 30303

Dear Mr. O'Reilly:

We offer the following responses to the apparent Items of Noncompliance in the referenced Inspection Report.

NOTICE OF VIOLATION A.

Section 6.4.1 of the Technical Specification states in part that a retraining and replacement training program for the facility staff shall be maintained and shall meet or exceed the requirements and recommendation of Section 5.5 of ANSI N18.1-1971.

Section 5.5 of ANSI N18.1-1971 states, in part, that a training program shall be established which maintains the proficiency of the Operating Organization through periodic training exercises, instruction periods, and reviews covering those items and equip-

{'

ment which relate to safe operation of the facility and through special training sessions for replacement personnel.

Contrary to the above, a training program for non-licensed operators had not been established, and non-licensed operators are not receiving the training required to properly prepare them for their work assignments, in that of the 15 non-licensed operators in the area of system training qualification which involves a total of 24 systems; 6 operators had completed 12 systems or less, and 9 operators had not completed any.

In the area of annual shift procedure reviews, 8 operators had reviewed 8 or less procedures and 7 had not completed any procedure reviews for this year (1978).

In the Replacement Operator Evolution, only 1 operator had completed 3 items and 14 operators had completed none.

DFFICIAL COPY, 7f /AR/0337 4 r

J. P. O'Reilly Ref: RII:WHB 50-302/78-25 Page 2 A. Response:

In accordance with the commitment made to the NRC on 19 October 1978, immediate action was taken to evaluate the Non-Licensed Operator Qualification Program.

All evaluations were completed and filed in each individual training record jacket located in the Training Office. A letter dated 19 October 1978 from the Operations Superintendent to the Shift Supervisors, directed the non-licensed operator qualifications evaluations be completed by 26 October 1978.

The formal qualification training guide was revised and upgraded and distributed for implementation on 8 November 1978.

o A memo from the Operations Superintendent dated 15 November 1978 to all Shift Supervisors directed a review of the documentation regarding the annual shift procedure review for all shift members, and formulation of a program to completa the required reviews for

(

each man by 31 December 1978.

Full compliance will be achieved on 31 December 1978.

Should there be further questions, please contact us.