Forwards Latest Version of 1982 Proposed Committee for Review of Generic Requirements Review Candidate
ML20049J655
Person / Time
Issue date: 03/12/1982
From: Schwink W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Eisenhut D, Jordan E, Mausshardt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), Office of Nuclear Reactor Regulation
References
NUDOCS 8203190067
Download: ML20049J655 (15)


Text

m MAR 12 1982 o

A C

k NEft?Q HEMORANDUM FOR: Darrell G. Eisenhut, NRR 7

l'$

1 g

Edward L. Jordan, IE

  1. d D A'

Donald B. Mausshardt, HMSS Robert M. Bernero, RES g

Clemens J. Heltemes, Jr., AEOD

'/

I4 Joseph Scinto, ELD FROM:

Walt Schwink Regional Operation Generic Requirements 5taff

SUBJECT:

PRELIMINARY VERSION OF THE 1982 PROPOSED CRGR REVIEW CANDIDATES Enclosed is the latest version of the subject document. Using this version, I will work with contacts from the involved offices on an infomal basis to prepare a final version which I then plan to formally forward for office comment. As appropriate, I will incorporate comments in the document and then forward it for your approval prior to fomal distribution to include the Public Document Room. Once distributed in final form. I will maintain the document current by means of periodic updating.

Please note that this document principally addresses relatively long-l tem items. Short-tem items shall be added via the updating process.

l Of course, all agenda items for a specific CRGR meeting will be i

addressed in the meeting agent published one week prior to a scheduled i

meeting. Urgent items will continue to be addressed on a case-by-case basis. The infomation in the subject document is the principal CRGR portion of a larger " cradle to grav3" tracking system, that is being designed to report regulatory requirement development, approval and implementation.

Any comments regarding this subject shall be appreciated.

S DISTRIBUTION W t chwink TMurley Regional Operation & Generic DEDROGR staff Requirements Staff DEDR0GR cf Central File

Enclosure:

As stated PDR(NRG/CRGR) l l

t 1C I

~~- D O l l

.D..E.D..RO...G.R "

. 6,..,

l

...g.g.

ome,,

l sua m e>.WS.shw.i.9.k.i.....

PDR REvoP Naccaca

- - - - - ~ ~

1;

~

g.g.Q....

.u&.8 2...........

ena om>

,..y.

j unc ronu sta tio-so3 nacu ano OFFICIAL RECORD COPY MW' usam mi-us..

l 1982 PROPOSED CRGR REUTEW CANDIDATES Date of Offico 3 DEDROGR o2 Item Doscrintion CPGR Roview Priority Catonorv Contact Contact States 1

Reg. Guide 1.68.3-Preoperational 01-21-82 B

2 RES M.

Taylor Recommended to EDO approval Testing of Instrument and Wenzinger subject to clarifying Control Air Systems quido's applicability &

implenentation.

ELD review suqqosted for final wording.

2 Equipment Qualification Program 01-22-82 A

2 NRR M.

Taylor Recommondod EDO sont to Ros toczy Commission prop. rule on accreditation of testing labs for equipment qualification with modif-ications to clarify implomontation schedulo.

3 Electrical Terminal Blocks 01-27-82 A

2 RES M.

Taylor Recommended to EDO that NRR, IE & RES reach f

Gollar agrooment en courso of

\\

action.

Suqqosted holding reply to Cong. Udall until resolved.

4 Emergency Response Facilities 02-03-82 A

2 IE/NRR/RES E.

Blackwood DEDROGR staff drafted 1 Soveral refined basic requirements for office comment and CRGR discussions at several mtas, through 2/3/82.

IE and NRR directors concurred with requirements.

CRGR recommended implomontation to EDO.

5 Revised Rulo Concerning 02-03-82 A

2 NRR T.

Cox Rocommended to EDO that Documentation of Differences Grimes rulo not be adopted as from Revised Standard proposed.

Review Plan 6

Technical Specification Chango 02-03-82 A

2 NRR T.

Cox Suqqosted that NRR develop Procedures Nanauer and implomont ofc.

procedures to control retrofit of current std.

toch. specs. on oper.

reactors licensed to earlier tech. specs.

Priorities:

A - Should have CRGR review Catocories:

1 - Urgent requiremont nooding B - Optional CRGR review CRGR review within 2 days C - Unlikely to nood CRGR review 2 - Non-urgent requi rcraont

1992 PROPOSED CRGR REVIEW CANDTDAYES Date of Office &

DEDROGR o

Item Descrintion CPGR Review Priority Catocorv Contact Contact Status m

7 Prioritization of Generic 02-03-82 A

2 NRR M.

Taylor Recommended additional Safety Issues Hanauer briefing in the future to koop CRGR informed of HRR's actions to prioritizo issuos.

8 Meteorological Measurement 02-24-82 A

2 RES M.

Taylor Returned to RES 11/25/81 Program (R.G.

1.23)

Beratan/

for more information on Brown costs and safety benefits.

Scheduled for CRGR review based on resubmittal of 1/27.

Second CRGR Review (2/24/82) completed and R.G.

boinq returned again for RES reconsidoration.

9 Post CP Chango Rule Briefing 02-24-82C A

2 RES T. Cox Probable CRGR and Comm.

Campbell Agenda Item 10 Quality Assurance (Incliding 03-17-82 A

2 RES/HRR E. Blackwood Comm. Agenda Item ?

Reportinf of Changes and Richardson Appl. of App. B to a)

Bolke 11 Instrumentation for Detection 03-17-82 A

2 HRR M.

Taylor Asked for Briefing by of Inadoquate Core Cooling Mattson/

2/4/82 memo.

Rubenstein 12 Revised Value-Impact Procedures 03-24-82 A

2 ADM W.

Schwink Comm. Agenda Item and Guidelines Grimsley 13 Roq. Guide on Snubbers (A-13) 04-00-82 A

2 RES E.

Blackwood Ask for Briefing 14 R.G.

1.145 - Atmospheric 04-00-82 A

2 RES M.

Taylor R.G.

in since stages of Disporsion Models Beratan/

preparation.

Memo Kornasiewicz request for briefing sent 15 Systems Interaction (USI A-17) 04-00-82 A

2 HRR T.

Cox 01-26-82 memo to NRR Coffman requested Briefing 16 Prop. Rule Part 50 - Emerq.

04-00-82 A

2 IE E.

Blackwood Comm. Aqcnda Item Responso Facil. 8 Assoc.

Porkins Implementation Datos 17 Rulemaking on Frequency of 04-00-82 A

2 IE E.

Blackwood Comm. Agonda Item?

Emergency Exercises Grimes 18 Final Rule Part 50 - TMI-Rolated 04-00-82 A

2 HRR T. Cox Possible Comm. Agenda Item Lic. Roqmts for Pending OL Verrelli Applications 20 Final Rules on Elim. of Offsite 04-00-82 A

2 RES/IE E.

Blackwood Comm. Agenda Item?

Emero. Prop. Adequacy Rqmts.

Jamgochian for LP & ZP micenses Grimes

1982 PROPOSED CPGR REVIEW CANDIDATES Date of Office &

DEDROGR BLu 13tm Descriotion CRGR Review Prioritv Catcoorv Contact Contact Status 21 Final Rule Part 50 on Clarif.

04-00-82 A

2 RES/IE E. Blackwood Comm. Aqcnda Item?

of Full-Scale Emerg. Prep.

Jamqochian Exercises Grimes 22 Prop. Rule on Extradordinary 04-00-82 A

2 RES M. Taylor Rule under revision, has Nuclear Occurrence Peterson not been' released for other offico concurrences.

Possible Comm. Agenda Item (CRGR tentative review late April - early May projected) 23 Final Rule on Fracture Toughness 04-00-82 A

2 RES M. Taylor Comm. Aqcnda Item Rqmts, for Nucl. Pwr, Plants Randall Office concurrences rec'd; (expect memo from RES addressing no CRGR review needed.)

24 National Reliability Evaluation 04-00-82 A

2 NRR/IE M.

Taylor Comm. Agenda Item?

Program (NREP)

Ernst/

Ready to give CRGR Thadani briefing - carly to mid April.

(Information paper to Commission should be ready end of March.)

25 Operational Experience Data 04-00-82 A

2 AEOD M.

Taylor Ask for Briefing Reporting Hebdon 26 Atmospheric Dispersion Models 04-00-82 A

2 RES M. Taylor Ask for briefing (Potential Accident Sequence Assessment) 27 Reg. Guide 1.33. Loose-Parts 04-00-82 A

2 NRR M. Taylor Ask for Briefing Detection Program for Phillips Primary System of LWRs (B-60) 28 Inservice Inspection and 04-00-82 A

2 NRR E. Blackwood Ask for Briefinq Inservice Testing - Backlog Sellers (B-47) 29 Endorsement of an Industry Std.

04-00-82 A

2 HRR E. Blackwood Ask for Briefing on Time Allowed for Operator Action (Manual vs Automatic) 30 Guidelinos on Frequency of 04-00-82 A

2 HRR E. Blackwood Ask for Briefing Testing for Diesel

(

Generators

(

31 Environ. Tech Spec (B-1) 04-00-82 A

2 HRR T. cox Ask for Briefinq Cain i

1902 PROPOSED CRGR REVIEW CANDIDATFJ Date of Office &

DEDROGR 3L.

Item Descriotion CRGR Review Priority Catocorv Contact Contact Status 32 l1ydrogen Control Measures 8 04-00-82 A

2 NRR M.

Taylor 1 sk for Briefing Effects of Hydrogen Burns H. Anderson on Safety Equip. (USI A-48) 33 Lic. Action on Tech Specs 04-00-82 A

2 NRR E.

Blackwood Ask for Briefing in an Emergency Trammell 34 Prop. Rulemaking, Parts 50 04-00-82 A

2 RES/NRR M.

Taylor Comm. Agenda Item 8 100 on Qualif. of Grcqq Mechanical Equipment 35 Early Resolution of Safety 04-00-82 A

2 NRR P Taylor Ask for Briefing Issues 36 Regulatory Agenda 05-00-82 A

2 ADM W. Schwink Ask for Briefing 37 Status of HRC Petitions 05-00-82 A

2 ADM W. Schwink Ask for Briefinq for Rulemaking 38 Baron Dilution 05-00-82 A

2 RES/NRR T. Cox Ask for Briefing 39 Licensing Process 05-00-82 A

2 NRR W.

Schwink Ask for Briefing 40 Prop. Rule on Protection of 05-00-82 A

2 RES W.

Schwink Ask for Briefing Employees (Parts 19, 30.

Campbell 40, 50, 70, 72, 105) 41 Clarification of Inspection 05-00-82 A

2 RES/IE E. Blackwood Comm. Agenda Item?

Procedures Ennis 42 Prop. Rule Change to Specify 05-00-82 A

2 RES E.

Blackwood Comm. Agenda Item?

Reporting Rqmts. Rqmts. Relative to Emergency Preparedness 43 Reactor Operator Qualifications 05-00-82 A

2 NRR/RES E. Blackwood Possible Comm. Agenda Merschoff 44 Reg. Guide 1.33, Rev.

05-00-82 A

2 RES E. Blackwood Ask for Briefing QA Proq. Rqmts. (Operations) 45 Prop. Rule - Anticipated 05-00-82 A

2 RES/NRR T.

Cox Comm. Agenda Item?

Transient Without Scram Pyatt/Thadani (ATWS - Part 50) 46 Final Rule Parts 2, 50, 8 51 05-00-82 A

2 RES T. Cox Comm. Agonda Item?

on Alt. Site Reviews Ott Under NEPA

1982 PROPOSED CRGR REVIEW CANDKDATES Date of Office 3 DEDROGR BL.,

Item Descrintion CRGR Review Priority Catocorv Contact Contact Status 47 Final Rule Part 50 on Immed.

05-00-82 A

2 RES/AEOD/

E. Blackwood Ask for Briefing Notification Ramts.

IE/NRR Jamgochian 48 Final Rule Part 73 - Searches 05-00-82 A

2 NMSS W.

Schwink Comm. Agenda Item of Individuals at NPPs 49 Prop. Rule Parts 50 1 73 -

05-00-82 A

2 NMSS W. Schwink Comm. Agenda Item Personnel Access Authorir.

Prell Rqmts. for NPPs 50 Prop. Rule Part 73 -

05-00-82 A

2 NMSS E.

Blackwood Ask for Briefing Misc. Amdmts. Dealing with Allen Physical Security at NPP 51 Licensing Actions for Plants 05-00-82 A

2 NRR T.

Cox Ask for Briefing Older than 5 Years 52 Possible Amdmts. to Immed.

05-00-82 A

2 OGC T.

Cox Ask for Briefing Effectiveness Rule in CP Parrish Proceedings 53 Occupational ALARA Rule 05-00-82 A

2 RES/NMSS W. Schwink Possible Comm. Agenda item Bell 54 Reactor Plant Shift Staffing 05-00-82 A

2 RES E.

Blackwood Possible Comm. Agenda Item

& Working Hours Limitation Merschoff (Part 50.54) 55 Reporting Requirements 05-00-82 A

2 IE W.

Schwink Ask for Briefing Fisher 56 Prop. Rule on Fire Protection 06-00-82 A

2 RES T.

Cox Comm. Age..Ja Iten.

Notley 57 Fi..a1 Rule, Part 50 on Environ.

06-00-82 A

2 RES/NRR M.

Taylor Comm. A gen d.) I '. em ?

Qualif. of Elect. Equipment Aqqarwal 58 Req. Guide 1.28, Rev. - QA Prog.

06-00-82 A

2 RES T.

Cox Ask fur Briefing Rqmts. (Design & Construction) 59 Alcohol and Drug Use by NPP 06-00-82 A

2 RES E.

Blackwood Possible Comm. Agenda Personnel Merschoff Item?

60 Primary Reactor Containment 06-00-82 A

2 RES/NRR E.

Blackwood Comm. Aqenda Item?

Leakage Testing (GI A-23)

Arndt

1982 PROPOSED CRGR REVIEW CANDIDATES Date of Office &

DEDROGR 2.

Item Descrintion CRGR Review Priority Cateco.ry Contact Contact 11alus 61 Prop. Rule on Interim Hydrogen 06-00-82 A

2 RES T. Cox 03-01-82 memo to RES Control Ramts. (BWR Mark III Fleishman (82-031) requested response (

and PWR ICE Condenser concerning CRGR Containments) participation.

62 Notice of Prop. Rulemaking on 06-00-82 A

2 RES/NRR E. Blackwood Comm. Agenda Item?

Acceptance Criteria for Sullivan ECCS for Light-Water-Cooled Hucl. Power Plants (Part 50) 63 Reg. Guide 1.94, Rev. - QA Prog.

06-00-82 A

2 RES T.

Cox Ask for Briefing Rqmts. for Install., Inspect.,

& Testing of Structural Concrete 64 Stds. for Determining Whether 06-00-82 A

2 ELD T.

Cox Ask for Briefing

(

Lic. Amdmts. Involve Signif.

Dorian Hazards Consideration &

Criteria on State Consultation 65 Interin Operating Licenses 06-00-82 A

2 ELD T.

Cox Ask for Briefinq Parler 66 Decommissioning Criteria for 06-00-82 A

2 RES/NRR E.

Blackwood Possible Comm. Agenda Nucl. Facilities, Parts Stever/

Item 30, 40, 50, 70, 1 72 Mathews (B-64) 67 Prop. Rule on Codes & Standards 06-00-82 A

2 RES/HRR E. Blackwood Ask for Briefing

(

for HPPs (Part 50)

Baker 68 Station Blackout (USI A-44) 06-00-82 A

2 HRR M.

Taylor Ask for Briefing Baranowski 69 Reg. Guide 1.105, Rev. -

06-00-82 A

2 RES M.

Taylor Ask for Briefinq Instrument Setpoints 70 Severe Accident Rulemaking 06-00-82 A

2 RES M.

Taylor CRGR Briefed 12/10/81; i

Ross

=uqqosted that rulemaking be oriented towards standardized plant designs.

71 Change in Radiation Protection 06-00-82 A

2 RES/NMSS W. Schwink Possible Comm. Agenda and Dose Limiting Stds.

Cool / Baker Item (parts 19, 20) 72 Req. Guide on Response Time 06-00-82 A

2 RES M.

Taylor Ask for Briefing Testing of Prot. System Instrument Channels

~.

1982 PROPOSED CRGR REVIEW CANDVDATES Date of Office &

DEDROGR

leu, Item Descriotion CRGR Review Priority Catcoorv Contact Contact Status 73 Protection of Control Room 06-00-82 A

2 RES M. Taylor Ask for Briefinq Operators Mu phy 74 Prop. Rule, Part 20 on 06-00-82 A

2 RES/HMSS/IE W. Schwink Possiblo Comm. Agenda Radiation Protection Neel Item Instrument Test and Calibration 75 Reg. Guide oa Instrument 06-00-82 A

2 RES M. Taylor Ask for Briefing Sensing Lines 76 Long-Term Improvements in 06-00-82 A

2 NRR E. Blackwood Comm. Agenda Item Licensee Mqt. Organiz.

Thompson (Rpt. to Congress) 77 Reg. Guide on Installation 06-00-82 A

2 RES E. Blackwood Ask for Briefinq of Transducers 78 Reg. Guide on Endorsing IEEE std.

06-00-82 A

2 RES M.

Taylor Ask for Briefinq on Criteria for Electrical Instrum. & Control Portions of Safety Systems 79 Reg. Guide 1.8, Rev. - Personnel 06-00-82 A

- 2 RES E. Blackwood Ask for Briefing Selection and Training 80 Prop. Rule, Part 21 on 06-00-82 A

2 RES E. Blackwood Ask for Briefinq Reporting of Defects Cameron 81 Reg. Guide 1.89, Rev. - Environ.

07-00-82 A

2 RES/NRR M. Taylor Ask for Briefing Qualif. of Elect. Equip.

Rosztoczy 82 Amdmts. to Immediate Effectiveness 07-00-82 A

2 OCG T. Cox Ask for Briefing.

Rule for Operating Reactors Malsch 83 Emerg. Prep. Prompt Public Notif.

07-00-82 A

2 RES E. Blackwood Ask for Briefing System Deferral Jamqochian 84 Notice of Prop. Rulemaking 07-00-82 A

2 RES M. Taylor Ask for Briefinq Consideration of Degraded Fleishman or Molted Cores in Safety Regulations

1982 PROPOSED CRGR REVIEW CANDIDATES Date of Office 4 DEDROGR BL.

Item Descriotion CRGR Review Priority Catonorv Contact Contact Status 85 Reg. Guide 1.142. Rev. - Safety 07-00-82 A

2 RES T.

Cox Ask for Briefinq Related Concrete Structures j

86 Prop. Rule 50.55 on Reporting of 07-00-82 A

2 RES E.

Blackwood Ask for Briefing Design & Construction Tomlin Deficiencies 87 Water Hammer (USI A-1) 07-00-82 A

2 NRR M.

Taylor Ask for Briefing i

Serkiz l

l 88 Asymetric Blowdown Loads on 07-00-82 A

2 HRR M.

Taylor Ask for Briefing l

Reactor Primary Coolant Snaider Systems (GI A-2) 89 Westinghouse Steam Generator Tubo 07-00-82 A

2 RES M.

Taylor Ask for Briefing Integrity (USI A-3)

Strosnider 90 CE Steam Generator Tube Integrity 07-00-82 A

2 RES M.

Taylor Ask for Briefing (USI A-4)

Strosnider 91 B8W Steam Generator Tube Integrity 07-00-82 A

2 RES M.

Taylor Ask for Briefing (USI A-5)

Strosnider 92 Hotice of Prop. Rulemaking, Part 50 07-00-82 A

2 HRR T. Cox Ask for Briefinq on Tech Specs for NPPs Skovholt 93 Mark II Containment Pool Dynamic 07-00-82 A

2 NRR M.

Taylor Ask for Briefing Loads - Long-Term Program C.

Anderson (USI A-8) 94 Reactor Vessel Materials Toughness 07-00-82 A

2 HRR M.

Taylor Ask for Briefing (USI A-11)

R.

Johnson 95 Fracture Toughness of Steam 07-00-82 A

2 HRR M.

Taylor Ask for Briefinq Generator 8 Reactor Coolant R.

Johnson Pump Supports (USI A-12) 96 Determination of Safety Relief 07-00-82 A

2 HRR M. Taylor Ask for Briefing Valve Pool Dynamic Loads and Helson Temp. Limits (USI A-39)

9982 PROPOSED CRGR REVIEW CANDIDATES Date of Office 8 DEDROGR ju.

Item Descrintion CRGR Review Prioritv Catecorv Contact Contact Status 97 Seismic Design Criteria - Short-Term 07-00-82 A

2 NRR T.

Cox Ask for Briefing Program (USI A-40)

Bagehi 98 Containment Emergency Sump 07-00-82 A

2 NRR M.

Taylor Ask for Briefing Performance (USI A-43)

Serki:

99 Shutdown Decay Heat Removal 07-00-82 A

2 NRR M.

Taylor Ask for Briefinq Requirements (USI A-45)

Marchese 00 Seismic Qualif. of Equipment 07-00-82 A

2 HRR T. Cox Ask for Briefing in Oper. Reactors (USI A-46)

Burns 01 Safety Implications of Control 07-00-82 A

2 HRR M.

Taylor Ask for Briefing Systems (USI A-47) 5:ukiewic

02 Seismic and Geologic Siting Criteria 07-00-82 A

2 RES T. Cox Ask for Briefing Beratan 03 Reg. Guide 1.12, Rev. - Earthquake 07-00-82

'A 2

RES T.

Cox Ask for Briefing Instrumentation i

04 Reg. Guide 1.56, Rev. -

07-00-82 A

2 RES M.

Taylor Ask for Briefing Maintenance of Water Purity in BWRs 05 Req. Guide 1.84, Rev. - Design 07-00-82 A

2 RES T. Cox Ask for Briefing and Fabrication Code Case Acceptability h06 Req. Guide 1.85, Rev. - Materials 08-00-82 A

2 RES T. Cox Ask for Briefing Code Case Acceptability l07 Reg. Guide 1.147, Rev. - Inservice 08-00-82 A

2 RES T.

Cox Ask for Briefing Inspect. Code Case Acceptability l08 Reg. Guide 1.136 on Material for 08-00-82 A

2 RES T. Cox Ask for Briefing Concrete Containments I

I

--. - ~., - -,

~...

1982 PROPOSED CRGR REVIEW CANDIDATES Late of Office &

DEDROGR WL, Item Descriotion CRGR Review Prioritv Catcaorv Contact Contact Status 09 Req. Guide on Cable Penetration 08-00-82 A

2 RES E. Blackwood Ask for Briefing Fire Stop Qualifications 110 Req. Guide on Qualif. Tests of 08-00-82 A

2 RES E. Blackwood Ask for Briefinq Class IE Cables & Field Splices E

III Compilation of Repting. Rqmts. for 08-00-82 A

2 RES W. Schwink Ask.for Briefing Persons Subject to HRC regs.

112 Reg. Guide 8.14, Rev. - Heutron 08-00-82 A

2 RES W.

Schwink Ask for Briefing Surveys and Dosimetry 113 Pressurized Thermal Shock 08-00-82 B

2 RES M. Taylor Comm. Agenda Item for (USI A-49)

Week of March 8, 1982 114 Prop. Rule on Personnel 08-00-82 B

2 RES W. Schwink Comm. Agenda Item Dosimetry Processing Dennis 115 Behavior of BWR Mark III 08-00-82 B

2 HRR M. Taylor Ask for Briefinq Containments (B-10)

Fields 116 Access, Clearance and 08-00-82 B

2 ADM W. Schwink Possible'Comm. Agenda Item Classification, Parts 2, Brady 11, 21, 25, 70, 73, 8 95 l17 Reg. Guide on Criteria for 08-11-82 B

2 HRR W. Schwink Ask for Briefinq Programmable Digital Computer Morris Systems in Safety Systems (G.I. A-19) 118 Reg. Guide On Prenatal Exposure 08-11-82 B

2 RES M. Taylor Ask for Briefinq Cool 119 IREP Guidance Documents 08-00-82 B

2 RES M. Taylor Ask for Briefinqr 12 0 Reliability Engineering 08-00-82 B

2 RES T. Cox Ask for Briefinq on Contract Effort for Drafting Plan 12 1 Safety Goal Development 08-00-82 B

2 RES M.

Ta y'lo r Ask for Briefing

1982 PROPOSED CRGR REVIEW CANDTDATES e

Date of Office &

DEDROGR BLu Item Descriotion CRGR Review Prioritv Catcoorv Contact Contact Status 12 2 Environ. Protection Regs. for 08-00-82 B

2 HMSS/ ELD W. Schwink Ask for Briefing Domestic Licensing 8 Related Mapes Reg. Functions (Parts 2, 30, 40, 50, 51, 70, 72, 8 110)

U23 Protection of Unclassified 08-00-82 B

2 HMSS W. Schwink Ask for Briefing Safeguards Information Kasun l24 Primary Coolant System 08-00-82 B

2 HRR M.

Taylor Ask for Briefing Decontamination 8 Steam P. Mathews Generator Chemical Cleaning (G.I. A-15) 25 Steam Effects on BWR Core Spray 08-00-82 B

2 NRR M. Taylor Ask for Briefing Distribution (GI A-16)

Sun 12 6 Main Steamline Break Inside 08-00-82 B

2 HRR M. Taylor Ask for Briefing Containment - Eval. of Environ.

Kudrick Conditions for Equip. Qualif.

(GI A-20) 27 Missile Effects (GI A-32) 08-OP-82 B

2 HRR M. Taylor Ask for Briefing Rothberg l28 Turbine Missiles (GI A-38) 08-00-82 B

2 HRR M.

Taylor Ask for Briefing Rothberg 12 9 Loads, Load Combinations, 1 08-00-82 B

2 NP.R/RES T. Cox Ask for Briefing Stress Limits (B-6)

Hou/ Richardson l30 Structural Integrity of Containment 08-00-82 B

2 NRR M.

Taylor Ask for Briefing Penetrations (B-26)

Rajan U5 f Implementation & Use of 08-00-82 B

2 HRR T. Cox Ask for Briefing Subsection HF (B-27)

Hartman D52 Design Basis Floods and 08-00-82 B

?

HRR/RES M. Taylor Ask for Briefing Probability (B-30)

Fliegal/

Jim Johnson l33 Dam Failure Model (B-31) 09-00-82 B

2 HRR T. Cox Ask for Briefing Staley

1982 PROPOSED CRGR REVIEW CANDXDATES e

Date of Office &

DEDROGR su, Item Descrintion CRGR Roview Priority Catocorv Contact Cnntact Status 34 Ice Effects on Safety-Related 09-00-82 B

2 HRR M.

Taylor Ask for Briefinq Water Supplies (B-32)

Codell 35 Assessment of Inelastic Analysis 09-00-82 B

2 HRR M.

Taylor Ask for Briefing Techniques for Equipment &

Hart: man Components (B-51) 36 Load Break Switch (B-53) 09-00-82 B

2 NRR E.

Black sood Ask for Briefing Lazernick 37 Improved Reliability of Target 09-00-82 B

2 NRR M.

Taylor Ask for Briefing Rock Safety Relief Valves Charny (B-55) 38 Review of (N-1) Loop Operation in 09-00-82 B

2

~IiR R E.

Blackwood Ask for Briefing BWRs and PWRs (B-59)

Loomis 39 Monitoring for Excessive Vibration 09-00-82 B

2 HRR E. Blackwood Ask for Briefing Inside the Reactor Pressure Hou Vessel (B-73)

'40 Risk Estimates for Health Effects 09-00-82 C

2 RES M.

Taylor Comm. Agenda Item of LL Ionizing Radiation

'41 Prop. Rule on Comparative Impacts 09-00-82 C

2 RES T.

Cox Comm. Agenda Item?

of Huel. and Alt. Fuel Cycles 42 Research Process 09-00-82 C

2 RES M.

Taylor Comm. Agenda Item?

43 Uranium Mill Licensing 09-00-82 C

2 RES W.

Schwink Minoque Memo to Stello Dated 1/4/82--Briefinq

'44 Transportation - Radiological 09-00-82 C

2 NMSS/RES W. Schwink Ask for Briefing and Safeguards Hulsen 45 Pr p.

Rule on Upgraded Emerq.

09-00-82 C

2 IE E. Blackwood Comm. Agenda Item?

Prop. for Research & Test Ramos Reactors i

k

1 1982 PROPOSED CRGR REVIEW CANDIDATES e

Date of Office &

DEDROGR su.

Item Descrintion CRGR Review Prioritv Catcoorv Contact Contact Status 46 Modif. of Emerq. Plans for 09-00-82 C

2 IE E.

Blackwood Comm. Agenda Item?

f Research & Test Reactors Grimes 47 Criteria for Criminal Penalties 09-00-82 C

2 RES/NRR/IE T. Cox Comm. Agenda Item?

for Violation of Reqs.

During Construction 48 IAEA 09-00-82 C

2 IP/NMSS W. Schwink Possible Comm. Agenda Kessler Item 49 Feasibility and Value of Lic.

09-00-82 C

2 NRR E. Blackwood Comm. Agenda Item Nucl. Plant Managers and Sr. Licensee Officers 50 Revision of Licensee Fee 09-00-82 C

2 ADM W.

Schwink A sk fo r Briefing Schedule Miller 51 ANSI /IEEE Procedures Guidance 09-00-82 C

2 RES M.

Taylor Ask for Briefing 52 Prop. Rule, Part 70 on Sfqds.

09-00-82 C

2 RES/HMSS/

W. Schwink Comm. Agenda Item?

Ramts. for Licensees w/SNM NRR of Low or Moderate Strategic Markulis Significance 45 3 Req. Guide 2.6, Rev. - Emerq.

09-00-82 C

2 RES E. Blackwood Ask for Briefing Planning for Res. 8 Test Reactors 15 4 Prop. Rule on Level of Nuclear 09-00-82 C

2 SP T.

Cox Comm. Agenda Item?

Property Insurance 15 5 Electromagnetic Pulse Rept.

09-00-82 C

2 RES M.

Taylor Comm. Agenda Item?

l56 Reporting of Material 09-00-82 C

2 NMSS W. Schwink Possible Comm. Agenda Item Accounting Data 157 SNM Material Control and 09-00-82 C

2 NMSS/RES W.

Schwink Ask for Briefing Accountability (NEU & LEU)

Markulis/Dube

O 1982 PROPOSED CRGR REVTEW CANDIDATES o

Date of Office &

DEDROGR I _

Itom Descrintion CRGR Roview Priority Catonorv Contact Contact Status JL.

58 Safeguards Requirements for 10-00-82 C

2 NMSS W. Schwink Comm. Agenda Item?

Non power Reactors Dube 59 Performance Testing for Health 10-00-82 C

2 RES W.

Schwink Ask for Briefinq Physics Survey Instruments Jones 16 0 Performance Testing for Bioassy 10-00-82 C

2 RES W.

Schwink Ask for Briefing Labs Brodsky

(

16 1 Breeder Reactor /GDC for Reprocessing 10-00-82 C

2 RES/NRR W.

Schwink Ask for Briefing (Part 50)

Hilsen l62 Storage and disposal of Nuclear 10-00-82 C

2 NMSS W.

Schwink Ask for Briefing Waste (Parts 50, 51) 46 3 Forecasting Elect. Demand 10-00-82 C

2 NRR T. Cox Ask for Briefing (B-2)

Feld 16 4 Contempt Computer Code Maintenance 10-00-82 C

2 NRR M.

Taylor Ask for Briefing (B-15)

Ruth 16 5 Radionuclide/ Sediment Transport 10-00-82 C

2 NRR T. Cox Ask for griefinq Program (B-28)

Codell 16 6 Effectiveness of Ultimate 10-00-82 C

2 HRR T.

Cox Ask for Briefinq Heat Sinks (B-29)

Codell 167 Socioeconomic Environmental 10-00-82 C

2 NRR T. Cox Ask for Briefinq Impacts (B-42)

Cleary 16 8 Value of Aerial Photos for 10-00-82 C

2 NRR E. Blackwood Ask for Briefing Site Evaluation (B-43)

La Roche 16 9 Forecasts fo Generating Costs 10-00-82 C

2 NRR T.

Cox Ask for Briefing of Coal & Nucl. Plants (B-44)

Hash 170 Assessment ef Agricultural Land 10-00-82 C

2 NRR T. Cox Ask for Briefinq in Relation to Power Plant Gears Siting and Cooling System Selection (C-16) s s

W-d w