ML20045H495
| ML20045H495 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 07/15/1993 |
| From: | Fox J GENERAL ELECTRIC CO. |
| To: | Poslusny C Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20045H496 | List: |
| References | |
| NUDOCS 9307200286 | |
| Download: ML20045H495 (1) | |
Text
Y
)
(6C GE Nuclear Energy f
GeneralEicctra Com;wy 175 Curtner Atenue. San Juse. CA 95125 July 15,1993 Docket No. STN 52 001 Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Schedule - Technical Specifications
Dear Chet:
Enclosed are the bases for shutdown technical specifications LCOs 3.7.2 RCW/RSW and UHS-Shutdown, and 3.7.3 RCW/RSW and UHS-Refueling which were submitted in my June 30,1993 letter. Bases for shutdown technical specification LCOs (also submitted in my June 30,1993 letter) 3.4.8 RHR-Cold Shutdown,3.5.2 ECCS-Shutdown,3.9.7 RHR-Iligh Water Level, and 3.9.8 RHR-Low Water Level remain the same as those previously submitted for these LCOs.
Also enclosed is the revised LCO 3.7.1 RCW/RSW and UHS-Operating and associated bases. The revision is necessary to be consistent with the shutdown technical specification LCOs 3.7.2 and 3.7.3 and is based upon a markup of the STS for BWR/6.
Please provide a copy of this transmittal to Mark Reinhart.
Sincerely, bof Jack Fox Advanced Reactor Programs ec: Alan Beard (GE)
Norman Fletcher (DOE)
Cal Tang (GE) i 1900Su 9307200286 930735 DR ADOCK 0520000g fy
\\
h;
\\
\\
-PDR