IE Insp Rept 50-320/81-15 on 810812-0910.Noncompliance Noted:Failure to Meet Ventilation Sys Acceptance Criteria & Failure to Perform Monthly Surveillance
ML20032B586
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/02/1981
From: Fasano A, Moslak T, Shanbaky M, Shaubaky M, Thonus L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20032B553 List:
References
50-320-81-15, NUDOCS 8111050688
Download: ML20032B586 (11)


See also: IR 05000320/1981015

Text

y

S

.

,

'

'

.. '

.

t

6

,

,

'

E-

,\\'k

U.S. NUCLEAR REGUALTORY COMMISSION

s,

i

0FFICE OF INSPECTION AND ENFORCEMENT

_ y

A

.

-

Region I

i

,-

.

,

,

e

Report No. 50-320/81-15

'

s

)

';

Docket No.

50-320

-

License No. DPR-73

. Priority

Category

c

--

.\\s~

Licensee :

Metropolitan Edison Company

,

--

-

~

-

, ,

b

P.O. Box 480-

's

M_iddl'etbNn, Pennsylvania 17057

.m

c-

i

l.

Facili[Name: Three Mile Island Nuclear Station, Unit 2

e

4

_

" ,s.".

Inspection at: Middl_Nokn, Penn:;ylvania

x

s,-

.m

^<

-

Inspection conducted: August 12x Saptember 10, 1981

7-]Inshec$ rib

A

/

' *i

'

-

f

!< '

Ly Li H.

hon

Rddi 'tl

5 ecialist

_

Tate sigrfed

l

-

Y

a 111

'

a

j'

T. A'. .90slak, RadTation Specialist

sighed'

x

Reviewedbj:

W.

,,dMp'

/f'/ _

/a

, s _'

1. .

M. fj. Shan Ty, Senior RadTation Specialist

dat6 signed

,

'

4

Approved by:

. h _

S n -* c)

.

/ 1M/

. -N. fasano, Chief, Three Mile Island Resident

date signed

.'

Section, PB#2

,

-' -

,

-

&

--Inspection Sunimary:

s

Inspection on Aurist 12 - September 10,1981 (Inspection __ Report No. 50-320/81-15)

"

Areas Inspected: Icutine unannounced safety inspection by resident inspectors

of radioastive waste systems including tests of air cleaaing systems, liquid

s'

.a ;

effluents, solid radioactive waste, effluent control instrumentation, reactor

'

building purges, radioactive gaseous waste sanpling and analysis, atmospheric

release paths and records and reports of effluents.

The inspection involved

-

130 inspector hours by two resident inspectors.

o,

i '

Resul ts : Of the eight areas inspected, five items of noncompliance were

(

identified in two areas (movement of liquid radioactive waste with the

auxiliary building ventilation system inoperable, paragraph 2(b); failure

s

-

to meet ventilation system acceptance criteria, paragrah 2(a); failure- to

~

...

perform monthly surveillances, paragraph 5(b); failure to perform test in

accordance with ANSI N510-1975, paragraph 2(b); failure to per' form non-

periodic surveillance, paragraph 2(b)).

8111050688 811006

PDR ADOCK 05000320

0

PDR

-

-

-

-

-

-

-

-

-

-

.

. -

- -

..ax

%,M

.

.

s

y

.

5

Details

1.

Persons Contacted

y

J. Bondick, Supervisor, Effluent Assessment

  • J. Brasher, Radiological Controls Manager, TMI-2
  • S. Chaplin, Licensing Engineer
  • D. Deiter, Qualit) Assurance

-

  • W. Delengowski, Plant Engineer

P. Deltete, Supervisor, Process Support Operations

  • E. Gischel, Plant Engineering Director
  • G. Kunder, Supervisor, Technical Specification Compliance
  • E. Hemmila , Shi ft Supervisor
  • R. Neidig, GPU Communications

S. Ritchie, Nuclear Consulting Services

P. Ruhter, Manager, Radiological Technical Support

  • R. Seiglitz, Construction Maintenance Manager

R. Warren, Mechanical Engineering Supervisor

  • D. Weaver, Instrument and Control Foreman

Th' f r.spector contacted other licensee and contractor employees

including members of the engineering, radiological controls,

chemistry and operations staffs.

  • denotes those individuals present at the exit interview.

2.

Tests o_f Air _ Cleaning Syt. tams

a.

Control Room Emergency Air Cleanup System

The Three M11 3 Island Unit 2 (TMI-2) Recovery Operations Plan

(R0P), section 4.7.7 requires that certain surveillance

activities be performed to demonstrate that the Control Room

Emergency Air Cleanup System is cperable.

R0P section 4.7.7.1(b)

requires that the system be checked "at least once per 31 days

by initiating, from the control room, flow through the HEPA

filters and char :oal adsorbers and verifying that the system

operates for at least 15 minutes".

Surveillance Procedure

(SP) 4303-M15. " Control Room Emergency Ventilation System,"

implements ti.e above requirement.

The inspector reviewed the

results of SP 4303-M15 for the months of April through July 1981.

No discrepancies were identified.

R0P section 4.7.7(c) requires that the system be tested "at

least once per 18 months or (1) after any structural maintenance

on the HEPA filter or charcoal adsorber housings, or (2) following

painting, fire or chtmical release in any ventilation zone

'

communicating with the system by:

1.

Verifying that the cleanup system setisfies the in-place

testing acceptance criteria and uses the test procedures

of Regulatory Positions C.5.a. C.5.c and C.5.d of Regulatory

Guide 1.52, Revision 2, March 1978, and the system flow

rate is 14,350 cfm + 10%.

-

_

_

J

'

.

.

-3-

2.

Verifying within 31 days after removal that a laboratory

analysis of a representative carbon sample obtained in

accordance with Regulatory Position C.6.b of Regulatory

Guide 1.52, Revision 2, March 1978, meets the laboratory -

testing criteria of Regulatory Positions C.6.a of Regulatory

Guide 1.52, Revision 2, March 1978.

3. .

Verifying a system flow rate of 14,350 cfn l'10% during

system operation when tested in accordance with ANSI

N510-1975."

Surveillance Procedure 4303-R25 is used to verify that the

requirements of R0P sections 4.7.7(c)(1), (2), and (3) are

met.

The inspector examined the results of testing performed

in October 1980 which indicated satisfactory performance with

respect to R0P section 4.7.7(c)(1) and -(3).

Areas included

were visual inspection, system flow rate, pressure drop, and

dioctyl pthalate (00P) leak testing.

The results of the carbon analysis required by R0P section 4.7.7(c)(2)

indicated a methyl iodide removal of 95.29%.(4.71% penetration).

The licensee's test procedure used 95% removal (5% penetration)

as the acceptance criteria.

Regulatory Guide 1.52, Revision 2,

March 1978, requires a penetration of less than 1% (993 removal).

The inspector noted that the acceptance of 4.71% penetration

constituted-noncompliance with R0P surveillance requirement

i

section 4.7.7(c)(2) (320/81-15-01).

Recovery Operations Plan section 4.7.7(e) requires that the

system be demonstrated operable "at least once per 18 months

by:

1.

Verifying that the pressure drop across the combined HEPA

filter and charcoal adsorber banks is less than 6 inches

Water Gauge (W.G.) while operating the system at a flow

rate of 14,350 cfm i 10%.

2.

Verifying that on a control room air inlet radiation test

signal or chlorine detection test signal, the system

automatically switches into a recirculation mode of

operation with flow through the HEPA filters and charcoal

adscrber banks.

3.

Verifying that the system maintains the control rcom at a

positive pressure of greater than or equal to 1/10 inch

W.G. relative to the outside atmosphere during system

operation."

Surveillance Procedures 4303-R-25 and 4303-M-10 are used to

fulfill these surveillance requirements.

The inspector

reviewed licensr2 test data generated by the above SPf s

j

-

_ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ - _ _ , ,

-

,

_

__.

.

.

,

-4-

in October 1980, June 1981, and July 1981.

The data indicated

acceptable pressure drop across the system, the operability of

.I

automatic reci; culation on a Olorine signal, and acceptable

positive pressure in the control room,

b.

A1xiliary Building end Fuel Handling Building Ventilation

The inspector examined the instrumentation and/or strip charts

of auxiliary building and fuel handling building air cleanup

systems for selected dates during the period July through

September 1981, including:

auxiliary building filter train pressura drop

--

fuel handling building filter train pressure drop

--

auxiliary building ventilation flaw indication and strip

--

charts

,

-

1

fuel handling building ventilation flow indication and

--

strip charts

j

stack ventilation flow

--

4

auxiliary building to atmosphere pressure drop

--

fuel handling building to atmosphere pressure orop

--

In addition a walk through visual inspection of the systems

was conducted. At the time of the inspection the surveillance

interval on many of the tests was coming due and a licensee

consultant was performing many surveillance tests.

These

included D0P leakage test, halogenated hydrocarbon leakage

test, flow, visual, and pressure drop tests.

The inspector

'

observed several of the tests performed by the licensee's

consultant.

The Order for Modification of License, dated July 20,1979, as

amended by the Order dated February ll,1980, states in part:

...Pending further amendment of the Facility Operating

"

License, the licensee shall maintain the facility in accordance

with the requirements set forth in Attachment 1..." (proposed

Technical Specifications, Appendix A to License No. DPR-73).

The proposed Technical Specification 3.9.12 states "The fuel

handling building / auxiliary building air cleanup systems shall

be OPERABLE with exhaust ventilation flow through the HEPA

filters during system operation.

APPLICABILITY : At all times.

- - -

-

-


_______-_ _ _____ _ j

.,

.

.

1'

.

- 5-_

1

j_

ACTION :

a..

Wit'h one fuel handling building / auxiliary building _

. air cleanup system inoperable, restore the inoperable

' system to OPERABLE status within 7 days.

t

'

b.

With no fuel handling building / auxiliary building

air cleanup system GPERABLE, suspend all operations-

involving movement'of liquid and gaseous radioactive

.

wastes until at least one fuel handlin'g building /-

auxiliary buidling air cleanap system is restored to

OPERABLE status."

. Proposed Technical . Specification 4.0.1 states in part:

...The

"

Surveillance Requirements shall be. performed to demonstrate-

compliance with the OPERABILITY requirements of the Limiting

Conditions for Operations and in.accordance with the REC 0VERY

OPERATIONS PLAN." The R0P;section 4.4.12 states in part:

"The fuel handling building air cleanup system and the auxiliary

building. air cleanup system shall be demonstrated OPERABLE...by...

Verifying an exhaust flow rate of ~at least 35,000 cfm for the

fuel handling building air cleanup system with two fuel

i

handling building supply fans ar.d two fuel handling building .

,

exhaust fans in operation... Verifying the exhaust flow rate of

at ieast 65,000 cfm for the auxiliary building air cleanup

system with two auxiliary building supply fans and twe auxiliary

building exhaust fans in operation.

,

On_ August 31 , 1 981 the licensee declared the fuel handling

building air cleanup system (FHBACS) inoperable due to a high'

differential pressure across the system.

System -flow was also

below the required 35,000 cfm (control room readout cpproxi-

mately 24,000.cfm) with two supply and'two exhaust fans in

operation.

The prefilters and high efficiency particulate

absolute (HEPA) filters were changed out.

The FHBACS differential

pressure dropped to within its allowable. maximum and the

ystem subsequently passed D0P tests and visual inspection.

.

The control room flow indication of the FHBACS increased to

approximately 31,000 cfm.

Flow measurements made by the

consultant as part of the FHBACS test indicated that the

control room indication was lower than actual flow and that

I

actual ~ flow exceeded the required 36,000 cfm (actual flow

approximately 43,000 cfm).

The licensee subsequently adjusted

the control' room indication.

The licensee' declared the system

a

operable on September 7,1981.

The control room flow indication for the auxiliary building

air cleanup system (ABACS) was below the required 65,000 cfm

'

(indication approximately 54,000 cfm) with two supply fans and

'

j

i

,

.

.

.

.

.

m

. .

.

m

. . .

.

.

-

.

. .

.

.

.

.

.

.

.

. .

.

.

.

.

.

.

' -6-

two exhaust fans in operation.

The licensee declared the

system inoperable due to low flow rate on September 2,1981.

Inspection cf the system found several conditions which would

impede system performance including frozen dampers on the

supply fans, worn belts on fan motors, an improperly positioned

variable pitch vane, and a malfunctioning variable p!tch vane

control system. Maintenance on the system was performed which

impro/ed system flow; the licensee's consultant then measured

61,000 cfm.

On September 8,1981 the licensee indicated to

the inspector that upon completion of additional maintenance

the licensee's consultant measured flou of between 65,000 and

60,000 cfm.

Review of control room operators logs and strip chart recording

of auxiliary building exhaust flow indicated that the system

had been unable to meet its operability surveillance require-

ment of 55,000 cfm imm August 1,1981 until September 2,1981.

-

The normal system lineup is the same as the specified surveillance

ccnditions, two supply and two exhaust fans operating.

During

the month of August 1981 several movements of liquid radioactive

waste had taken place in the auxiliary building.

This represents

noncompliance with propssed Technical Specification (TS) 3.9.12

which requires that liquid waste movement be suspended while

the ABACS is inepersble (320/81-15-02).

The inspector observed on previous tours and from licensee

records that significant portions (greater than one thousand

Square feet of area) of the auxiliary building had been

printea during the time period April through July 1981.

The

surveillance requirement in the R0P section 4.9.12 states in

part: "The fuel handling building air cleanup system and the

auxiliary building air cleanup system shall be demonstrated

OPERAB'.E:...following painting, fire or chemical release in

any ventilation zone communicating with the system by:

. Verifying

a flow rate of 36,000 cfm + 10% for each auxiliary building

exhaust filter train when tested in accordance with ANSI N5 0-1975."

Contrary to the above requirements, the licensee f ailed to

perform the specified surveillance after the painting in the

auxiliary building (320/81-15-03).

This represents non-

compliance with R0P section 4.9.12(b).

In reviewing the test data fro.m May 1980 of the ABACS and

FHBACS the inspector noted that control room readouts were

used for flow ind: cation.

R0P section 4.9.12 requires that

the flow rates be verified when tested in accordance with

ANSI N510-1975.

ANSI N510-1975 requires that the air flow

cupacity test be performed by a pitot-tube traverse or

"one of the other methods as described in Section 9 of the

ACGIH Industrial Ventilation." Neither the pitot-tube

traverse nor one of the alternate methods of Section 9 of tha

.

. J

_ _ _ _ _

_ _ _ _ _ _

.

.

.

1-

7

ACGIH Industrial Ventilation were used to determine flow.

The

inspector noted that this represented noncompliance with R0P

section 4.9.12 (320/31-15-04).

c.

Stack Flow

The inspector observed that the stack flow was consistently

less than what one would expect by summing the inputs.

The

inputs are the auxiliary building ventilation, fuel handling

building ventilation and service building ventilation.

The

stack flow is used by the licensee as an input to routine

effluent calculations, however no alarm or emergency functions

are based on this reading.

This item is unresolved pending a

licensee evaluation of stack flow (320/81-15-05).

3.

Liquid Effluents

Proposed TS 3.9.13 and 3.9.14 prohibit the discharge of water

processed by EPICOR II and processed water from the reactor building

sump and reactor coolant system until approved by the NRC.

The NRC

has not granted approval for such discharges and the licensee has

not discharged this water.

For routine operational liquid effluents TS 6.8 reqaires that

procedures relating to effluent releases be reviewed and approved

by the NRC.

The licensee's liquid effluent releases are also limited by

Environmental Technical Specification 2.1.1 to the concentrations

in 10 CFR 20 Appendix B, for unrestricted areas and to a total of

10 curies per year (excluding tritium and dissolved gases).

Review of liquid effluent releases for the first six months of 1981

indicated that concentrations were well within the abo.

limits.

Total activity released (excluding tritium and dissolved gases)

was approximately 0.000018 Ci, a small fraction cf the allowable

limits.

4.

Solid Radioactive Waste

The licensee's solid radioactive waste shipped offsite in 1981

consisted of routine compactable and noncompactable waste and

dewatered spent resins.

The compactable waste consists mainly of

items (shoe covers, step-off pads, etc.) which become contaminated

due to being in contaminated portions of the plant.

Noncompactable

items are usually larger or of nonccmpressible material (contaminated

pipes, scaffolding, etc. ).

The quantity, r:dionuclide content and

radionuclide distribution were consistent with curreni plant

activities, licensee radionuclide measurements and independent NRC

measurements.

- -

. -

- -

-

-

-

- -

-

-

-

-

- -

- -

-

-

-

-

-

- -

-

-

. - -

- -

_ .

.

.

.

.

-8-

.

Twenty-two casks of dewatered resin were shipped from TMI-2 during

the first seven months of 1981.

The dewatering procedures were

reviewed by NRC representatives.

The procedures require multiple

repetition of dewatering via a pump .followed by a pariod of allowing

the resin to . settle and drain.

One of the quality assurance

methods included opening a drain plug at the bottom of the side of

the cask then tilting the cask in that direction to check that no

water remained.

No items of noncompliance were identified.

5.

Effluent Control Instrumentation

a.

Calibration

Environmental Technical Specifications 2.1.2,I; requires that

the auxiliary and fuel handling building and reactor building

purge gas monitors for TMI-2 (HP-R-219A, HP-R-225, and HP-R-226)

shall be calibrated at least every 18 months by means of

radioactive sources which are traceable to a National Bureau

of Standards (NBS) source.

These detectors stall have an

instrument channel test at least monthly and a sensor check at

'

least daily to verify that the readodt device is indicating as

expected.

The inspector reviewed the following SP's to verify that a

proper calibration of atmospheric monitors had been completed.

.

--

SP 4302-R32, "Eberline Radiation Monitoring System

Calibration," was examined for the Unit 2 vent monitor

HP-R-219A

SP 2302-R3, " Radiation Monitor System," was examined for

--

the calibration of the atmospheric radiation monitors

HP-R-221 A and HP-R-2218, the fuel handling building

ventilation monitors, upstream and downstream, respectively,

of the air cleaning filters; HP-R-225 and HP-R-226, the A

and B duct monitors, respectively, to the reactor building

purge exhaust system, and HP-R-227, the reactor building'

dome radiation monitor

SP 2612-R2, " Atmospheric Radiation Monitors Calibration,"

--

was reviewed for HP-R-223, the spent fuel pool monitor

A

--

SP 4302-R33, " Nuclear Measurement Company Instrument

Calibration," was reviewed for the EPICOR II, RMI-18

4

gaseous effluent monitor

The inspector verified that each of the above monitors had

been calibrated within the past 18 months and that NBS trace-

able sources had been used.

.

- -

.

-

- -

-

. .

.

4

-9-

,

b.

Functional Tests

+

The inspector reviewed SP 2322-M1, " Reactor Building Purge

Monitor Functional Test," which nquires that HP-R-225 and

HP-R-226 be tested monthly.

Records' for SP 2322-M1 were

'

examined for January through August 1981. The inspector noted

that this test was only performad once, in June 1981.

Failure

to perform SP 2322-M1 monthly is in noncompliance with Environ-

mental Technical Specification 2.1.2.B.3 (320/81-15-06).

'

The inspector examined shift and daily operational checks per

Operating Procedure (0P) 4301-S1 for the months of June and

July 1981, approximately 60 records.

No items of noncompliance were identified.

A review was made of functional and channel tests, and flow

1

rate calibrations required for the EPICOR II gaseous effluent

monitoring system.

SP 4301-M15. " Atmospheric Radiation Mon tors Source Check for

i

Nuclear Measurements Corporation (NMC) Units," was examined

for completion of the monthly checks from January through

August 1981.

SP 4303-Q2, " Atmospheric -Radiation Monitors Channel Functional

Test for NMC Units," was examined for completion of the

quarterly tests during the period January through August 1981.

SP 4302-sal, "EPICOR II Ventilation System Sample Flow Rate

Monitor Calibration," and SP 4302-SA3, "EPICOR II Discharge

Flow Rate Monitor Calibration," were examined for completion

of the semi-annual calibration of the flow rate montiors.

No items of noncompliance were identified.

6.

Reactor Buidling Purges.

On August 26, 1981, the inspector observed implementation of Unit 2

OP 2104-4.91, " Reactor Building Purge Using the Modified Purge

System," Revision 4, dated August 2,1981.

Observations were made

of vent flow rates, HP-R-219A readings, licensee response to high

activity alarms on the HP-R-219A Gas Channel, and licensee compliance

to verbatim completion of the procedure.

Additionally, records of purges conducted during the months of

April, May and June 1981 were reviewed.

,

No items of noncompliance were identified.

.

.-

. -

.

.

.

. .

-

-

.

- .

-

. .

.

.

-

.

.

.

. -

. . .

.

'

..

.

.

.-10 '

~

7.

Radioactive GaseoustWaste Sampling and Analysis

Environmental Technical Specification Tables 2.1-1 and 2.3-2 specify

the sampling frequency, type of activity analysis, and lowest

detectable concentrations for various- atmospheric release points.

The following SP's were reviewed to verify compliance with' Environ-

mental Technical Specification Tables 2.1-1 and 2.3-2.

SP 2324-W3A/B, " Unit 2 Vent Sampling"

--

SP 2324-W4A/B, "EPICOR II Vent Sampling"

--

SP 2104-4.91, " Reactor Building Purge Using the Modified Purge

---

System"

SP 4080, " Radioactive Releases to the Environment"

--

Current analytical data was also examined for the EPICOR II ventilation

system, the unit exhaust, and reactor building purge releases.

No items of noncompliance were identified.

8. .

0_t_her Atmospheric Rele_ase Paths

10 CFR 50, Appendix A, Criterion 64 states:

" Monitoring radioactivity

releases. Means shall be provided for monitoring the reactor

containment atmosphere, spaces containing components for recirculation

of loss-of-coolant accident fluids, effluent discharge paths, and

the plant environs for radioactivity that may be released from

normal operations including anticipated operational occurrences,

.

and from postulated accidents."

To verify compliance with the above, the following procedures were

reviewed._

.

Radiological Control Procedure (RCP) 1616.3, " Respiratory

--

Cleaning and Testing Facility," Revision -6, February 26, 1981

RCP 1691, " Radiological Control for Babcock and Wilcox, Cap-

--

Gun, Chemistry Facility," Revision 3, January 7,1981

OP 2104-4.61, "CNSI Electro-Con Unit Operation," P.evision 0,

--

April 14,1980

OP 2104-4.70, "Special Maintenance Procedure for Mobile

--

Laboratory," Revision 2, February 12, 1981

_

The inspector examined the monitors at their field locations, and

observed airflow readings, background radiation levels, and current.

sampling data.

No items of noncompliance were identified.

. :.

.,

.

'^

-

. 11--

-

~9.

Records and Reports of Effluents

~

The . inspector: reviewed the licensee's Semi-Annual' Effluent. Release

-

Report covering the period . January through July .1981 against the

_

criteria given in Regulatory Guide 1.21 and Environmental Technical Specifications 2.1.2.c and 2.1.2.d.

No items of noncompliance were identified.

10. _ Unresolved Items

Unresolve'd items are matters about which more information is.

required in order to ascertain whether they are acceptable items,

items of noncompliance, or deviations.

An unresolved item dis -

closed during the inspection-is discussed in paragraph 2.c.

_

11.

Exit Interview-

The inspector met with the licensee representatives .(denoted in

paragraph 1) at the conclusion of the inspection on September 10, 1981.

The inspectors summarized the purpose and scope of the inspection .

and the findings were discussed.

- ;

I

L

l-

t

3