ML20031C468
| ML20031C468 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/24/1981 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20031C460 | List: |
| References | |
| TAC-46973, NUDOCS 8110070179 | |
| Download: ML20031C468 (1) | |
Text
.
~
~
REACTIVIT'f CCNTROL SYSTEMS
(,-
ACTICN:
(Continuec) c)
A power distribution map is cotained from :ne incare detectors and F, and ??g are verified c be witnin their limits within 7E'nours, and d)
The THERMAL POWER level is reduced :o < 50% of the THERMAL POWER allowable for the reac:cr ecolant pumo ccmbination witnin one hour and within the nex: A nours the Nuclear Overpower Trio Setcoint is reduced Oc < 70% of the THERMAL PCWER allowabie r.or tne reac:cr ecolant pump ccmcination, or e)
The remainder of tne rods in the group with the inoceracle rod are aligned to within - 5.5P, of One inopersole red within one hour wnile maintaining -he roc sequence, insertion and overlap limits of
.igures 3.1 -1, 3.1 -2, 3.1 -3, 3.1 4, 3.1 -5 and 3.1 -6 ;
the THERMAL ?OWER level shall be restrictec cursuan:
to Scecifica:icn 3.1.3.5 during sucsecuent oceration.
(,. [ -
SURVEIL.ANCE RECUIREMENTT 1.1. 3.1.1 The position of each centrol rod shall be determined c be wi nin the group average heignt limit by verifying ne incividual red
- ositions at least once :er 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> exceo: Ouring -ime intarvals wnen
- ne Asymmetric Roc Moni cr is inoceracle, then verify the indivicual roc :ositions at least once per a nours.
1.1.3.1.E Each con:rcl rod not fully inserted snall be cetermined to be OPERABLE by movement of at least 3% in any one direction at least once every 31 cays.1 1 This surveillance period is extended for 3 days for the September,1981 test only.
i' s
i llCRYSTAL RIVER - vNI 3
2/1 1 ;g e110070179 81092'4 PDR ADOCK 05000302 P
PDR A