4-s D
IBUTION:
cket File TERA NRC PDR ACRS (10)
l Docket No. 50-333
- 0. Eisehhut J. Heltemes, AE0D Mr. George T. Berry T. Ippolito President and Chief Operating Officer S. Norris Power Authority of the State of flew York P. Polk How York, llew York 10019 OELD September 2,1981 I&E (3) l
Dear Mr. Berry:
NSIC i
Subject:
REACTOR PROTECTION SYSTEH (RPS) POWER M0HITORING SYSTEM DESIGN MODIFICATION RE: JAMES A. FITZPATRICK NUCLEAR POUER PLANT l
By letter dated May 13, 1981 you subnitted design infomation for the subject modification that you intend to install at your facility. He have reviewed this infomation and find that, to complete our evaluation, we will require the additional infomation requested in enclosure (1).
Please provide this infomation within 60 days. However, if this schedule is inconsistent with priority requirenents for other licensing work, please provide us with your proposed date of response within 30 days.
Enclosure (2) forwards, for your consideration, nodel Tecl.nical Specifi-cations for Electric Power Monitoring for RPS. Submittal of the proposed Technical Specifications that you have connitted to submit should be in
-the fom of a request for podification of your license accompanied by an l
appropriate fee.
This request for infomation was approved by OMB under clearance nuober 3150-0011 which expires September 30, 1981. Comments on burden and duplication nay be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, D.C.
20503.
Thank you for your cooperation.
Sincerely, y
ee 2
l
/s/
u s.
~
Y/
l Thomas A. Ippolito, Chief
/
Operating P.eactors Branch #2
'u l
Division of Licensing
Enclosures:
As Stated cc: With Enclosures Seenegage
/,, w ORB #2 W RB#2 ORBf,
.Z...+..#0 RBf2 OFFICE)
...g 77j g....... gj g...
..........jpggy j.g.
.. 7
- g.......
........... ~. - -
au-o
... age /ai....... a/J.c./al..........a/.:.4./ai..... $/./../al........p.a./al..............
. ~............ - ~
D129140051 810902
~.. - ~ ~.......
~. ~.. ~ ~... ~
.. ~ ~ ~. - - ~. ~
.... ~ ~ ~ ~. ~
.. ~...... - ~ ~
- PDR ADOCK 05000333 tac P PDR OFFICIAL RECORD COPY usom e-mem
=
1 Mr. George T. Berry cc:
Mr. Charles M. Pratt Assistant General Counsel Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. J. Phillip Bayne Senior Vice President -
Nuclear Generation Power Authority of the State of New York 10' Columbus Circle New York, New York 10019 Mr. Raymond J. Pasternak Resident Manager James A. FitzPatrick Nuclear Power Plant P. O. Box 41 Lycoming, New York 13093 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 George M. Wil'.arding Manager-Nuclear Licensing 10 Columbus Circle New York, New York 10019 State University College at Oswego Penfield Library - Documents Oswego, New York 13126 Resident Inspector c/o V. S. NRC P. O. Box 136 Lycoming, New York 13093
s RPSPOWERSUPPLY__D[gGNMODIFICATION REQUEST FOR ADD'11_0NAL INFORMATION JAMES A.'FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333 1.
Submit detailed drawings of the proposed design modification to.the monitoring system for the RPS power supplies (MGs and alternate source).
The drawings should include component ratings, and schematic and wiring diagrams. Detailed relay information may be submitted in the form of the
., manufacturers Technical Bulletin.
2.
Submit a current revision of the electrical one-line diagram of the on-site.
distribution system and a schematic / elementary diagram that includes the RPS power distribution buses.
3.
Provice justification that proposed time delays, if any, will not result in damage to RPS system components or affect the performance of required safety functions.
4.
Provide justificction that the design modification and components will meet the requirements of GDC 2 and GD0 21 of 10 CFR Part 50, Appendix A.
5.
Specify monitoring system over-voltage, under-voltage, and under-frequency trip setpoints.
4 s
Enclosure-(1) e G
e g
L
-~
s..
lo I
i ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS ELECTRIC POWER MONITORING FOR REACTOR PROTECTION SYSTEM l
l LIMITING CONDITION FOR OPERATION 3.8.2.7 The power monitoring system "for the in service RPS MG set or Alternate Source shall be OPEPABLE.
I APPLICABILITY:
CONDITIONS 1 and 2.
ACTION _:
With the pcher monitoring system for the in service R'PS MG set or Alternate Source inoperable, restore the inoperable power monitoring system to OPERABLE status within 30 minutes or remove the RPS MG set or Alternate Source associated with the inoperable power monitoring system from service. One channel of a power monitoring system may be inoperable, as necessary for test, or maintenance, not to exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> / month.
SURVEILLANCE REQUIREMENTS 4.8.2.7 The above specified RPS power monitoring system instrumentation shall be deter.nined OPERABLE:
At least once per six months by performing a CHANNEL FUNCTIONAL TEST; l
a.
and b.
At least once per operating cycle by demonstrating the OPERASILITY of over-voltage, under-voltage and under-frequency protective instrumentation by perforcance of a CHANNEL CALIBRATION including simulated autoratic actuation of the protective relays, tripping logic and output circuit breakers and verifying the following setpoints.
l.
Over-vol tage <
- VAC, 2.
Under-voltage 1 VAC, and
.3.
Undcr-frequency 1-Hz.
c I
Enclosure (2)
-.