g UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20566 February 14, 1990 Docket No. 50-298 Mr. George A. Trevers, Division Manager - Nuclear Support Nebraska Public Power District Post Office Box 499 Columbus, Nebraska 68601-0499 l
Dear Mr. Trevors:
SUBJECT:
REVIEW OF NEBRASKA PUBLIC POWER DISTRICT'S RESPONSE TO GENERICLETTER88-01(TAC.NO.69131)
)
The staff, with the assistance of its contractor, Viking $ystems International, has completed its review of Nebraska Public Power District's (NPPD) responses to Generic Letter 88-01 dated August 3 December 19, and July 24, 1989. We find that your responses to the requirements are acceptable, with the exception of the following:
1.
Your responses concerning intergranular stress corrosion cracking (IGSCC) classifications and accessibility contain conflicting snd inconsistent information.
The staff will find these responses acceptable, provided that the< recourendations described in Section 2.3.5 of the enclosed TechnicalEvaluationReport(TER)areimplemented.-
2.
.Your responses declined to propose a Technical Specification change that includes a statement on inservice inspection (ISI) as required by this generic letter. This position is not acceptable. NPPD should propose an amendment to the Cooper Technical Specifications as i
required by Generic Letter 88-01. The model specification for boiling water reactors that was provided in Attachment B to the generic letter should be utilized unless -changes are necessary to accommodate plant specific differences at Cooper Nuclear Station.
3.
NPPD has also declined to propose an amendment to the Technical Specifications that limits the increase in unidentified leakage to 2_gpm over a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or less, as required by Generic Letter 88-01.
Your position is unacceptable. NPPD should propose the required Technical Specification.
4.-
HPPD's position on reporting of flaws and flaw evaluation is not in i
conformance with the NRC staff position stated in Generic Letter 88-01.
NPPD should modify its position on reporting requirements and repair criteria to conform to the NRC staff position as required in Generic Letter 88-01.
9002220678 900214 PDR ADOCK 05000298
)h p
PDC r
February 14, 1990 i
, Mr. George A. Trevors,
A copy of the NRC staff's safety evaluation regarding your responses to Generic Letter 88 01 and the related Technical Evaluation Report by our contractor are enclosed. Please provide your response requesting the required Technical S)ecification changes and program modifications within 60 days from the date of t11s letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L. 96 11.
Sincerely, l
/s/
Paul W. O'Connor, Project Manager Project Directorate IV Division of Reactor Projects. Ill, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page DISTRIBUTION NEETTTo'Ip' NRC PDR"
Local PDR PD4 Reading G. Holahan MS 13E4 ADRA F. Hebdon P. Noonan P. O'Connor OGC.Rockville E. Jordan MS MNBB 3701 C.-Y. Cheng ACRS (10) MS P-315
)
PD4 Plant File 1
- PD4/L,A q [i( ::PD4/PM n.. @ PD4/D.......IT...:,.......Ag..:............:............:............:.......
/
0FC
.....:....g..
L.
NAME :PNoona
- P0'Connor:bj:.FHebdon tk..........:............:............:............:.........
.....:............:............g02//f/90
- 02/@/90 DATE802/$90 0FFICIAL RECORD COPY Document Name:
COOPER LTR/69131 j
i
, Mr. George A. Trevors l A copy of the NRC staff's safety evaluation regarding your responses to Generic Letter 88 01 and the related Technical Evaluation Report by our contractor are enclosed. Please provide your response requesting the required Technical i
Specification changes and program modifications within 60 days from the date of this letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L. 96-11.
Sincerely, t
^d Paul W. O'Connor, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page l
l l
t c.
=
Mr.' George A. Trevors Nebraska Public Power District Cooper Nuclear SW,'on Cc:
Mr. G. D. Watson, General Counsel
. Nebraska Public Power District P. O. Box 499 Colunbus, Nebraska 68601 t
Cooper Nuclear Station, Division ATTN: Mr. Guy R. Horn, Manager of Nuclear Operations P. O. Box 98-Brownv111e, Nebraska 68321 Dennis Grams, Director i
Nebraska Departrent of Environn. ental Control P. O. Box 98922 Lincoln, Nebraska 68509-8922 j
Mr. Larry B'ohlken, Chaiman l
Memaha County Board of Comissioners Nemaha County Courthouse 1824 N Street i
Auburn, Nebraska 08305 l
Senior Resident Inspector U.S. Nuclear Regulatory Comission P. O. Box 218 Brownvillt. Nebraska 08321 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission l
Gil Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Harold Dorchart, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P. O. Box 95007-Lincoln, Nebraska 68509-5007 t
W-
_._ ---- --,-