MONTHYEARML19241B2771979-07-11011 July 1979 Forwards Revision 1 to Rept on Reanalysis of Safety-Related Piping Sys. Seven Piping Supports Will Be Modified & Two New Supports Will Be Installed.Requests Authorization to Begin Interim Operation Until Refueling Project stage: Other ML19274F2961979-07-18018 July 1979 Forwards Revision 2 to Rept on Reanalysis at Safety- Related Piping Sys Project stage: Other ML19225C6291979-07-27027 July 1979 Forwards Revision 3 to Rept on Reanalysis of Safety-Related Piping Sys. Change Reflects up-to-date Reanalysis & Mod Program Project stage: Other ML19242B8711979-08-0707 August 1979 Forwards Revision 4 to Rept on Reanalysis of Safety-Related Piping Sys Project stage: Other ML19257A9331980-01-0303 January 1980 Advises That Baseplate Evaluations Per IE Bulletin 79-02 Revealed Two & One half-inch to six-inch Piping Designed for Loads Derived from SHOCK-2 Computer Calculations Project stage: Other ML19211C5021980-01-0303 January 1980 Submits Corrections to 790803 Rept on Seismic Reanalyses of Safety-Related Piping Sys, Revision 4.Nine Computer Problems Exist for Which SHOCK-II Run Is Run of Record for Some Pipe Supports.Reanalyzing Problem Project stage: Other ML19337A1641980-08-14014 August 1980 Forwards Responses to IE Bulletin 79-14 & Suppls 1 & 2, Seismic Analysis for As-Built Safety-Related Piping Sys. W/Completion of Mods,All Piping Sys Will Be Able to Perform Required Safety Functions During Seismic Event Project stage: Other ML19331C6601980-08-14014 August 1980 Interim Deficiency Rept Re Linear Indications in Gib Gusset Welds in Reactor Vessel Structural Support(Neutron Shield Tank).Metallographic Analysis of Weld Samples & Addl Insps Being Conducted.Next Rept Will Be Issued on 801101 Project stage: Request ML20008E2801980-10-20020 October 1980 Identifies Status of Activities Re IE Bulletin 79-14.All Physical Insp of Piping & QC Records Completed.All Piping Reanalyzed.Mods to Supports to Be Completed Before Startup. Requests Extension Until 810331 for Full Completion Project stage: Other ML19339A1831980-10-20020 October 1980 Amend 34 to License DPR-66,removing Nine Hydraulic Snubbers from Table 3.7-4 of Tech Specs Project stage: Request ML19351E4081980-11-0303 November 1980 Immediate Action Ltr 80-43:discusses Util 800814,0911 & 1020 Ltrs Re IE Bulletin 79-14.Enumerates Actions Taken or Planned by Util.Requests Response If Actions Differ from Actions Described Project stage: Other ML20126H3181981-03-31031 March 1981 Requests Extension Until 810407 for Submittal of Final Rept Re IE Bulletin 79-14, Seismic Analysis for As-Built Safety- Related Piping Sys. Addl Time Required for Review of Info Re Reanalysis Effort Supplied by Ae Project stage: Other ML20003H5271981-04-0707 April 1981 Submits Rept Re IE Bulletin 79-14, Seismic Analysis for As- Built Safety-Related Piping Sys. Rept Not Final Since Equipment Nozzle Info Is Incomplete.Vendor Responses Outstanding Project stage: Other ML20010A3311981-07-31031 July 1981 Requests 2-wk Extension to Satisfy Requirements of IE Bulletin 79-14,per .Util Awaiting Vendor Concurrence for Seven Components Project stage: Other ML20030B9431981-08-14014 August 1981 Submits Final Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Nozzle Load Evaluations Complete & Required Mods Installed,Except for Two Items.Status of Equipment Nozzles Encl Project stage: Other 1980-10-20
[Table View] |
Text
._
'Af 912) 4se-cooo
,LN.~
July 31, 1981 n
United States Nucicar Regulatory Commission e'
Office of Inspection and Enforcement J y-1
[
\\
Attn: Boyce H. Crier, Regional Director Region I hbdEl
)
' UG 1.0198W 4 631 Park Avenue c"
~
King of Prussia, Pennsylvania 19406
[
,C,\\
I
Reference:
Beaver Valley Power Station, Unit No. 1 s
\\ /A]
Docket No. 50-334, License No. DPR-66 4I IE Bulletin 79-14 Gentlemen:
Our letter dated April 7, 1981 indicated that a final report would be submitted by July 31, 1981 concerning the activities which we have per-l forned to satisfy the requirements of I.E.Bulletin 79-14. We request an extension of time of two weeks to submit this report. This additional time is reqaired to complete a comprehensive review of the informat. ion supplied to us by the Architect / Engineer and the equipment vendors as related to the reanalysis effort.
Vendor responses to our Architect / Engineer have not been as timely as anticipated and as a result we are awaiting vendor concurrence for seven components.
Very truly yours, x
J. J. Carey Vice President, Nuclear cc:
D. A. Beckman, Resideat Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U.S. Nuclear Regulatory Commission c/o Document Management Branch jf Washington, DC 20555 h*h 8108110319 810731
/
PDR ADOCK 05000334 G
PDR-J