MONTHYEARML19241B2771979-07-11011 July 1979 Forwards Revision 1 to Rept on Reanalysis of Safety-Related Piping Sys. Seven Piping Supports Will Be Modified & Two New Supports Will Be Installed.Requests Authorization to Begin Interim Operation Until Refueling Project stage: Other ML19274F2961979-07-18018 July 1979 Forwards Revision 2 to Rept on Reanalysis at Safety- Related Piping Sys Project stage: Other ML19225C6291979-07-27027 July 1979 Forwards Revision 3 to Rept on Reanalysis of Safety-Related Piping Sys. Change Reflects up-to-date Reanalysis & Mod Program Project stage: Other ML19242B8711979-08-0707 August 1979 Forwards Revision 4 to Rept on Reanalysis of Safety-Related Piping Sys Project stage: Other ML19257A9331980-01-0303 January 1980 Advises That Baseplate Evaluations Per IE Bulletin 79-02 Revealed Two & One half-inch to six-inch Piping Designed for Loads Derived from SHOCK-2 Computer Calculations Project stage: Other ML19211C5021980-01-0303 January 1980 Submits Corrections to 790803 Rept on Seismic Reanalyses of Safety-Related Piping Sys, Revision 4.Nine Computer Problems Exist for Which SHOCK-II Run Is Run of Record for Some Pipe Supports.Reanalyzing Problem Project stage: Other ML19337A1641980-08-14014 August 1980 Forwards Responses to IE Bulletin 79-14 & Suppls 1 & 2, Seismic Analysis for As-Built Safety-Related Piping Sys. W/Completion of Mods,All Piping Sys Will Be Able to Perform Required Safety Functions During Seismic Event Project stage: Other ML19331C6601980-08-14014 August 1980 Interim Deficiency Rept Re Linear Indications in Gib Gusset Welds in Reactor Vessel Structural Support(Neutron Shield Tank).Metallographic Analysis of Weld Samples & Addl Insps Being Conducted.Next Rept Will Be Issued on 801101 Project stage: Request ML20008E2801980-10-20020 October 1980 Identifies Status of Activities Re IE Bulletin 79-14.All Physical Insp of Piping & QC Records Completed.All Piping Reanalyzed.Mods to Supports to Be Completed Before Startup. Requests Extension Until 810331 for Full Completion Project stage: Other ML19339A1831980-10-20020 October 1980 Amend 34 to License DPR-66,removing Nine Hydraulic Snubbers from Table 3.7-4 of Tech Specs Project stage: Request ML19351E4081980-11-0303 November 1980 Immediate Action Ltr 80-43:discusses Util 800814,0911 & 1020 Ltrs Re IE Bulletin 79-14.Enumerates Actions Taken or Planned by Util.Requests Response If Actions Differ from Actions Described Project stage: Other ML20126H3181981-03-31031 March 1981 Requests Extension Until 810407 for Submittal of Final Rept Re IE Bulletin 79-14, Seismic Analysis for As-Built Safety- Related Piping Sys. Addl Time Required for Review of Info Re Reanalysis Effort Supplied by Ae Project stage: Other ML20003H5271981-04-0707 April 1981 Submits Rept Re IE Bulletin 79-14, Seismic Analysis for As- Built Safety-Related Piping Sys. Rept Not Final Since Equipment Nozzle Info Is Incomplete.Vendor Responses Outstanding Project stage: Other ML20010A3311981-07-31031 July 1981 Requests 2-wk Extension to Satisfy Requirements of IE Bulletin 79-14,per .Util Awaiting Vendor Concurrence for Seven Components Project stage: Other ML20030B9431981-08-14014 August 1981 Submits Final Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Nozzle Load Evaluations Complete & Required Mods Installed,Except for Two Items.Status of Equipment Nozzles Encl Project stage: Other 1980-10-20
[Table View] |
Text
e M
r i
y Duquesne Lidit 435 Seth Aven e u
Pif*SDv'QS. P4 August 7, 1979 Mr. Harold R. Denton Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention:
A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Request to Terminate the Commission's Fbrch 13, 1979 Order to Show Cause Centlemen:
Enclosed are three (3) signed originals and thirty-seven (37) copies of Revision 4 to the Report on the Reanalysis of Safety Related Piping Systems for Beaver Valley No. 1 Unit.
This revision consists of replacement pages to the original report submitted to you on June 19, 1979 and includes information on the results of the analysis on certain supports that had previously not been analyzed. We have determined that one additional modification is required.
This modification consists of the removal of one support to permit the remaining existing supports to better accomodate the design loads.
We have now completed all modification work identified in the amended report and hereby request that the Nuclear Regulatory Commission terminate the March 13, 1979 Order to Show Cause.
Very truly yours, C. N. Dunn Vice President, Operations Enclosure
\\6 C)S.
7 00809 0 9/fo
(CORPORATE SEAL)
Attest:
)
Y W
H.W.
Staas Secretary CCM10NWEALTH OF PENNSYLVANIA)
) SS:
CCUNTY OF ALLEGEENY
)
On this 7
day of 8/s e h id 1979, before me,
HENRY G STOECKER
, a Notary PubMc in and for said Ccmmon-wealth and County, personally appeared C. N. Dunn, who being duly cworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.