Forwards IE Insp Rept 50-302/78-26 on 781023-27 & Notice of Violation
ML19270F017
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/29/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19270F009 List:
References
NUDOCS 7901110165
Download: ML19270F017 (2)


See also: IR 05000302/1978026

Text

6

,

e

UNITED STATES

<

/jk* "Gug

'

1

}

NUCLEAR REGULATORY COMMISSION

,og

R EGloN 11

{

g s .(

g

101 M ARIETTA STREET.N.W

'-' '

r

-

[

ATL ANT A. GE oRGI A 30303

l'

o,%, * /

NOV 2 91978

.....

.

In Reply Refer To:

RII:JE0

50-302/78-26

Florida Power Corporation

ATTN: Mr. W. P. Stewart, Director

-

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida 33733

Gentlemen:

This refers to the inspection conducted by Mr. J. E. Ouzts of this office on

October 23-27, 1978, of activities authorized by NRC Operating License

No. DPR-72 for the Crystal River Unit No. 3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty, Jr.,

at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Three new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken

by you and the results achieved; (2) corrective steps which will be taken to

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this of fice to withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

7901110K6

.

.

.

Florida Power Corporation

-2-

NOV 2 91976

which it is claimed that the information is proprietary, and should be

prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

-

Sincerely,

'

%

F. J. Long, Chie

Reactor Operations and Nuclear

Support Branch

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/78-26

cc w/ encl:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

P. O. Box 1228

Crystal River, Florida 32629