ML18033A706

From kanterella
Jump to navigation Jump to search

Forwards Seismic Design Audit Plan for Facility on 890426-28.Results Will Be Forwarded
ML18033A706
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/10/1989
From: Black S
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
References
TAC-00296, TAC-00299, TAC-00302, TAC-00330, TAC-296, TAC-299, TAC-302, TAC-330, NUDOCS 8904210131
Download: ML18033A706 (8)


Text

April 10, 1989 l

Docket No. 50-260 Distribution NRC PDR Local PDR Projects Reading ADSP Reading DCrutchfield BDLiaw SBlack

'Pier'son LWatson WSLittle MSimms GGears DMoran TDaniels NMarkisohn OGC BGr imes EJordan ACRS(10)

GPA/CA BFN Rdg. File Hr. Oliver D. Kingsley, Jr.

Stnior Vice President, Nuclear Power'ennessee Valley Author ity 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

Dear Mr. Kingsley:

SUBJECT:

NRC SEISMIC DESIGN AUDIT -

BROWNS FERRY NUCLEAR PLANT, UNIT 2 (TAC 00296,

00299, 00302, 00330)

The NRC will conduct a seismic design audit during the period of April 26-28, 1989 in Bechtel's San Francisco office (April 26) and in General Electric San Jose office (April 27-28).

The objective of this audit and the NRC staff and contractor personnel participating are identified in the Enclosure.

If you have any questions regarding this activity, contact the NRC Project

Manager, Gerald E. Gears at (301) 492-0767.

Sincerely, Original signed by Suzanne Black, Assistant Director for Projects TVA Projects Division Office of Nuclear Reactor Regulation

Enclosure:

Seismic Audit Outline cc w/enclosure:

See next page D8'I 89042iOi3i 8904i0 PDR ADOCK 050002b0 F

FNU

  • SEE PREVIOUS CONCURRENCE

~

~

D

~

~

)*

~ ~

GGears:as WWW W&WW OW
RPierson NAME :MSimms SBl ac
4/ 0/89

~

~

w w

w <<w+

ww e ~

w

~

':4/07/89

4/07/89 DATE :4/07/89 OFFICIAL RECORD COPY Members of your staff will be kept informed of our audit progress and significant findings.

The audit results will be transmitted to you as an audit report.

K r

hll I

Jf I

g 1

N

'VS ft j

4 1

Vr 4 ~ 4 qj 3Prh g Jh h

3'll'f.

II

'I I

1, I lllr V,lf 1

Kt b'

1 J

1 I"

~

V 4 f 1

3 3

h ~

1

~-

V 1

V

~ 1.

K 1

l O'

1' 1

3%

1

~ 1 1

~

3 1

1 l'

rt,

~

~

1 1

V

Docket No. 50-260 Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

Dear Mr. Kingsley:

Distribution NRC PDR Local PDR Projects Reading ADSP Reading DCrutchfield BDLiaw

,, SBlack RPier son LMatson MSLittle MSimms GGears DMoran TDaniels NMarkisohn OGC BGrimes EJordan ACRS(10)

GPA/CA BFN Rdg. File

SUBJECT:

NRC SEISMIC DESIGN AUDIT -

BROMNS FERRY NUCLEAR PLANT, UNIT 2 (TAC 00296,

00299, 00302, 00330)

The NRC will conduct a seismic design audit during the period of April 26-28, 1989 in Bechtel's San Francisco office (April 26) and in General Electric '

San Jose office (April 27-28).

The objective of this audit and the NRC staff and contractor personnel participating are identified in the Enclosure.

Members of your staff will be kept informed of our audit progress and significant findings.

The audit results will be transmitted to you as either an audit report or a safety evaluation as part of our Nuclear Performance

Plan, Volume 3, seismic program review.

If you have any questions regarding this activity, contact the NRC Project

Manager, Gerald E.

Gears at (301) 492-0767.

Sincerely,

Enclosure:

Seismic Audit Outline cc w/enclosure:

See next page Suzanne Black, Assistant Director for Projects TVA Projects Division Office of Nuclear Reactor Regulation L

1 OFC

'NRR'T LA

NRR:

WW WWW NAME :MSimms g.

,:GG

~

~ 0 DATE :4/

/89

4/ /

OFFICIAL RECORD COPY PM: V'T

RPi r on WWW 9
4/'l /89 A:

D SBlack

4/

/89

I 4I IP 1

H 11 H

N M

I

~ [

"l I 'I P

I

ENCLOSURE AUDIT PLAN B

Y Audit Topic:

Date:

Location:

Members of the Audit NRC Team:

Objective:

Seismic Design Program Audit April 26-28, 1989 Bechtel-San Francisco Office (April 26)

General Electric-San Jose Office (April 27-28)

T.

Cheng T. Tsai (Contractor)

The following issues will be discussed and appropriate documents audited:

1.

Seismic analysis pertaining to the Browns Ferry reactor building multi-stick model, and 2.

Seismic evaluation of the primary

systems, including major components.

V

Mr. Oliver D. Kingsley, Jr.

3\\

cco General Counsel Tennessee Valley Authority 400 West Summit Hill Drive E11 B33 Knoxville, Tennessee 37902 Mr. R. L. Gridley Tennessee Valley Authority 5N 157B Lookout Place Chattanooga, Tennessee 37402-2801 Mr. 0. J. Zeringue Tennessee Valley Authority Browns Ferry Nuclear Plant P.O.

Box 2000

Decatur, Alabama 35602 Mr. P. Carier Tennessee Valley Author ity Browns Ferry Nuclear Plant P.O.

Box 2000

Decatur, Alabama 35602 Mr. D. L. Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 885 Knoxville, Tennessee 37902
Chairman, Limestone County Commission P.O.

Box 188

Athens, Alabama 35611 Claude Earl Fox, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Georgia 30323 Resident Inspector/Browns Ferry NP U.S. Nuclear Regulatory Commission Route 12, Box 637

Athens, Alabama 35611 Dr. Henry Myers, Science Advisor Committee on Interior and Insular Affairs U. S.

House of Representatives Washington, D.C.

20515 Tennessee Valley Authority Rockville Office 11921 Rockville Pike Suite 402 Rockville, Maryland 20852

P l

'