ML18033A666

From kanterella
Jump to navigation Jump to search

Notifies of Civil Calculation Reviews Program Audit on 890313-24 in Knoxville,Tn.Objective of Team Audit & NRC & Contractor Personnel Participating Identified in Encl
ML18033A666
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/07/1989
From: Black S
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
References
TAC-00296, TAC-00299, TAC-00302, TAC-00330, TAC-296, TAC-299, TAC-302, TAC-330, NUDOCS 8903160325
Download: ML18033A666 (4)


Text

l~

~

f pt March 7, 1989 Docket No. 50-260

, Distribution NRC PDR Local PDR Projects Reading Mr. Oliver D. Kingsley, Jr.

ADSP Reading Senior Vice President, Nuclear Power DCrutchfield Tennessee Valley Authority BDLiaw 6N 38A Lookout Place SBlack 1101 Market Street RPierson Chattanooga, Tennessee 37402-2801 FMcCoy WSLittle MSimms GGears DMoran JRutberg SVarga BGrimes EJordan ACRS(10)

GPA/PA GPA/CA BFN Rdg.

Dear Mr.

Kingsley:'UBJECT:

NRC SEISMIC DESIGN AUDIT -

BROWNS FERRY NUCLEAR PLANT, UNIT 2 (TAC 00296,

00299, 00302, 00330)

The NRC will conduct a Civil Calculation Reviews Program audit during the period of March 13-24, 1989 at the TVA Office in Knoxville, Tennessee.

The objective of this team audit and the NRC staff and contractor personnel, participating are identified in the Enclosure.

s Members of your staff will be kept informed of our audit progress and significant findings.

An exit meeting with you or members of your staff will be conducted on March 24, 1989, in accordance with our normal procedures.

The audit results will be transmitted to you as either an audit report or a safety evaluation as part of our Design Baseline and Verification Program Review.

If you have any questions, regarding this activity, contact the NRC Project,

Manager, Gerald E.

Gears at (301) 492-0767.

Sincerely, Original signed by

Enclosure:

Seismic Audit Outline cc w/enclosure:

See next page 3903i60325 890307 PDR ADOCK 05000260 P

PDC Suzanne Black, Assistant Director for Projects TVA Projects Division Office of Nuclear Reactor Regulation O Po/

t J

OFC

NR :T A LA NAHE:NSimms,g

~

W W

0 DATE :3/

89 PM P7 W

3 1/89 OFFICIAL RECORD COPY R:TA::

A:

D 3/

/89 WWW DTerao

SB
3/ /

~

W W

W W

C I

h H

\\

~

W h

WI W

p C

Mr. Oliver D. Kingsley, Jr. Browns Ferry Nuclear Plant CC:

General Counsel Tennessee Valley Authority 400 West Summit Hill Drive Ell 833 Knoxville, Tennessee 37902 Mr. R. L. Gridley Tennessee Valley Authority 5N 1578 Lookout Place Chattanooga, Tennessee 37402-2801 Mr.

C.

Mason Tennessee Valley Authority Browns Ferry Nuclear Plant P.O.

Box 2000

Decatur, Alabama 35602 Mr. P. Carier Tennessee Valiey Authority Browns Ferry Nuclear Plant P.O.

Box 2000

Decatur, Alabama 35602 Mr. D. L. Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 B85 Knoxville, Tennessee 37902
Chairman, Limestone County Commission P.O.

Box 188

Athens, Alabama 35611 Claude Earl Fox, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Georgia 30323 Resident Inspector/Browns Ferry NP U.S. Nuclear Regulatory Commission Route 12, Box 637

Athens, Alabama 35611 Dr. Henry Myers, Science Advisor Committee on Interior and Insular Affairs U. S.

House of Representatives Washington, D.C.

20515 Tennessee Valley Authority Rockville Office

)1921 Rockville Pike Suite 402 Rockville, Maryland 20852

~

'w B

@BY ENCLOSURE AUDIT PLAN B~Y Audit Topic:

Date:

Members of the Audit Team:

Objective:

Seismic Design Program Audit March 13-24, 1989 T.

Cheng T. Tsai (Contractor)

A. Unsal {Contractor)

0. Mellon (Contractor)

To review calculations in the design areas of concrete structures, steel structures, primary containment, embedments, tanks and heat exchangers, soil and rack analysis, settlement and slope stability, piles and foundations, buried structures, tornado evaluation (including tornado missiles),

heavy load evaluations, and flooding