MONTHYEARML17219A4021975-05-13013 May 1975 Component Cooling Pumps Mas & Reinf, as-built.Sheet 1 Project stage: Other GO2-85-724, Application for Amend to License NPF-21,changing License Condition 16 to Implement Installation or Upgrade Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Second Refueling Outage.Fee Paid1985-10-14014 October 1985 Application for Amend to License NPF-21,changing License Condition 16 to Implement Installation or Upgrade Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Second Refueling Outage.Fee Paid Project stage: Request ML17278B1011986-11-18018 November 1986 Proposed Tech Specs,Revising Tech Spec Tables 3.3.7.5-1, Accident Monitoring Instrumentation & 4.3.7.5-1, Accident Monitoring Instrumentation Surveillance Requirements Project stage: Other ML17278B0991986-11-18018 November 1986 Application for Amend to License NPF-21,revising Tech Spec Tables 3.3.7.5-1, Accident Monitoring Instrumentation & 4.3.7.5-1, Accident Monitoring Instrumentation... to Allow Adequate Time for Staff Review & Approval.Fee Paid Project stage: Request GO2-87-080, Application to Amend License NPF-21,deleting License Condition 2.C.(16),Attachment 2,Item 3(b) Requiring Implementation of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Second Refueling.Fee Paid1987-03-10010 March 1987 Application to Amend License NPF-21,deleting License Condition 2.C.(16),Attachment 2,Item 3(b) Requiring Implementation of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Second Refueling.Fee Paid Project stage: Request GO2-87-010, Requests Timely Review of 870330 Request for Deferral of Requirement to Install wide-range Neutron Monitoring Sys Until Third Refueling Outage.Application for Amend to License NPF-21,submitted on 861118,should Be Delayed1987-03-31031 March 1987 Requests Timely Review of 870330 Request for Deferral of Requirement to Install wide-range Neutron Monitoring Sys Until Third Refueling Outage.Application for Amend to License NPF-21,submitted on 861118,should Be Delayed Project stage: Request GO2-87-293, Application for Amend to License NPF-21 to Implement Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Fourth Refueling Outage.Fee Paid1987-12-23023 December 1987 Application for Amend to License NPF-21 to Implement Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring Prior to Startup Following Fourth Refueling Outage.Fee Paid Project stage: Request GO2-88-018, Responds to 880113 Telcon Requesting Addl Info Re Contract Procuring Wide Range Neutron Monitoring Sys.Continuous Monitoring & Qualification Assistance Should Ensure Gamma Metrics Diligently Pursues Qualification of Equipment1988-01-15015 January 1988 Responds to 880113 Telcon Requesting Addl Info Re Contract Procuring Wide Range Neutron Monitoring Sys.Continuous Monitoring & Qualification Assistance Should Ensure Gamma Metrics Diligently Pursues Qualification of Equipment Project stage: Other ML17279A8241988-02-0505 February 1988 Proposed Changes to Tech Spec 3.6.1.8 Increasing Purging Limit of Containment Through Standby Gas Treatment Sys from 90 H to 100 H Project stage: Request GO2-88-034, Application for Amend to License NPF-21,requesting one-time Only Amend to Tech Spec 3.6.1.8 to Increase Purging Limit of Containment Through Standby Gas Treatment Sys from 90 H to 100 H.Fee Paid1988-02-0505 February 1988 Application for Amend to License NPF-21,requesting one-time Only Amend to Tech Spec 3.6.1.8 to Increase Purging Limit of Containment Through Standby Gas Treatment Sys from 90 H to 100 H.Fee Paid Project stage: Request ML17279A8291988-02-10010 February 1988 Confirms 880205 Oral Authorization for one-time Change to Tech Specs 3.6.1.8 to Allow 100 H of Purging Time During Current 365 Day Period,Ending 880410.Thereafter,Tech Spec 3.6.1.8 Reverts to 90 H Per Yr Project stage: Other ML17279A8401988-02-18018 February 1988 Proposed Tech Specs,Waiving Limit of 1,500 Lb Max Weight Above Fuel Storage Pool to Allow Erection of Temporary Protection Cover Over Pool Project stage: Other GO2-88-038, Application for Temporary Amend to License NPF-21,waiving Limit of 1,500 Lb Max Weight Above Fuel Storage Pool to Allow Erection of Temporary Protective Cover Over Pool.Fee Paid1988-02-18018 February 1988 Application for Temporary Amend to License NPF-21,waiving Limit of 1,500 Lb Max Weight Above Fuel Storage Pool to Allow Erection of Temporary Protective Cover Over Pool.Fee Paid Project stage: Request ML17279A8331988-02-19019 February 1988 Grants Relief from Tech Specs to Allow Repair of Damaged Roof & Restore Integrity of Reactor Bldg,Per 880218 Request. Relief Granted for Two Normal Working Days to Allow NRC to Complete Safety Evaluation & Issue Formal License Amend Project stage: Approval ML20149L2031988-02-19019 February 1988 Grants Relief from Tech Specs to Allow Repair of Damaged Roof & Restore Integrity of Reactor Bldg,Per 880218 Request. Relief Granted for Two Normal Working Days to Allow NRC to Complete Safety Evaluation & Issue Formal License Amend Project stage: Approval GO2-88-041, Application for Amend to License NPF-21,one Time Only Temporary Amend to Tech Spec 3.9.7 (Crane travel-spent Fuel Storage Pool) Under Emergency Circumstances.Requests Addl Clarification1988-02-19019 February 1988 Application for Amend to License NPF-21,one Time Only Temporary Amend to Tech Spec 3.9.7 (Crane travel-spent Fuel Storage Pool) Under Emergency Circumstances.Requests Addl Clarification Project stage: Request ML17279A8491988-02-23023 February 1988 Proposed Tech Spec 3/4.9.7, Crane Travel-Spent Fuel Storage Pool Project stage: Other GO2-88-044, Application for Amend to License NPF-21,revising Limiting Condition for Operation for Tech Spec 3/4.9.7, Crane Travel-Spent Fuel Storage Pool1988-02-23023 February 1988 Application for Amend to License NPF-21,revising Limiting Condition for Operation for Tech Spec 3/4.9.7, Crane Travel-Spent Fuel Storage Pool Project stage: Request ML17284A6011988-02-25025 February 1988 Advises That 871223,880205 & 18 Requests for Amends to License NPF-21 Reviewed & Adopted Motions Indicating That Energy Facility Site Evaluation Council Has No Comments Project stage: Other ML17279B0391988-05-0505 May 1988 Amend 56 to License NPF-21,revising Tech Spec 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys Project stage: Other ML17279B0411988-05-0505 May 1988 Safety Evaluation Supporting Amend 56 to License NPF-21 Project stage: Approval ML17279B1221988-06-10010 June 1988 Notice of Issuance of Amend 60 to License NPF-21 Project stage: Approval ML17279B1191988-06-10010 June 1988 Amend 60 to License NPF-21,revising License Condition 2.c.(16) to Extend Fourth Refueling Outage Deadline for Implementing Requirements of Rev 2 to Reg Guide 1.97 for Flux Monitoring.Neutron Flux Monitor Must Be Qualified Project stage: Other ML17279B1211988-06-10010 June 1988 Safety Evaluation Supporting Amend 60 to License NPF-21 Project stage: Approval GO2-88-167, Provides Rept Re Actions Taken Between Nov 1987 & June 1988 to Ensure That Installation of Qualified Monitor Be Completed at Earliest Possible Date.Next Required Quarterly Rept Shall Be Submitted by 8810071988-07-29029 July 1988 Provides Rept Re Actions Taken Between Nov 1987 & June 1988 to Ensure That Installation of Qualified Monitor Be Completed at Earliest Possible Date.Next Required Quarterly Rept Shall Be Submitted by 881007 Project stage: Other GO2-89-004, Provides Quarterly Rept Re Installation of Fully Qualified Neutron Flux Monitoring Instrumentation Sys.Next Required Quarterly Rept Will Be Submitted by 8904071989-01-0606 January 1989 Provides Quarterly Rept Re Installation of Fully Qualified Neutron Flux Monitoring Instrumentation Sys.Next Required Quarterly Rept Will Be Submitted by 890407 Project stage: Other 1988-02-18
[Table View] |
Text
ACCEILRATED DI BUTION DEMONS TION SYFI'KM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)
ACCLBBION NBR:8811170153 DOC.DATE: 88/02/25 NOTARIZED:
NO DOCKET PACf4':50-397 'WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION ESCHELSiC.
Washington, State of RECIP.NAME RECIPIENT AFFILIATION KNIGHTONzG.W.
Project Directorate V
SUBJECT:
Summarizes State of. WA Energy Facility Site Evaluation Council 880222 review of listed amend to License NPF-21.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR l
ENCL 0 SIZE:
TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 NUDOCS-ABSTRACT REG FIL 01 NRC PDR D
S S
'h D
gOZh 10 ALL 5 RIDSiz RICIPIEPIS PLEASE HELP US 'IQ REDUCE MAli~!
CGHZACT 'IHE DOCUMENT CORTISOL DESK RQCM P1-37 (EXT. 20079)
TO ELBGHRPE YOUR NME FRCH DI8'ZRZ8VPIQN LISTS PDR DOCtlMEM1'8 YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL
rf
))
CURTIS ESCHEI5 Qldlfmdll t etete g+
O~
0
~
X
< ~tee "
STATE OF WASHINCTON ENERCY FACILlTY SlTE EVALUATION COUNClL Mail Stop PY-11
~
Olympia, Washington 98504
~
(206) 4596490
~
(5CAN) 5854490 4
February 25, 1988 Mr. George W. Knighton, Director Project Directorate No. V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Knighton:
Subject:
AMENDMENTSTO FACILITYOPERATING LICENSE NPF-21, WPPSS NUCLEAR PROJECT NO. 2 During its regular meeting of February 22, 1988, the Washington State Energy Facility Site Evaluation Council reviewed and adopted motions indicating that the Council has no comments on the following requests for amendments to NRC's Operating License for the Washington Public Power Supply System's Nuclear Plant No. 2.
~]gC 0 e
6~8@
gee 82-Supply System December 23, 1987 February 5, 1988 February 18, 1988
~Sub'ect License Condition 2.C(16), Attachment 2, Item 3(b), Wide Range Neutron Monitor Technical Specification 3.6.1.8 (Drywell and Suppression Chamber Purge System) - Emergency Technical Specification 3.9.7 (Crane Travel-Spent Fuel Storage Pool) - Emergency The Council was notified of the proposed amendment requests by the Supply System in accordance with the notification requirements of 10 CFR'50.91.
We appreciate the opportunity to review the proposed license amendments.
Sincerely, PBR SB BB0BB P
lt 000000 7(
Curtis Eschels Chairman CE:MEM:ab cc:
D. W. Mazur, Supply System G. C. Sorensen, Supply System l J. O. Bradfute, NRC