ML17278A448

From kanterella
Jump to navigation Jump to search

Proposed Tech Specs,Changing Limiting Condition for Operation 3.3.7.7 to Allow LPRM Calibr Under Certain Conditions Using Four Detectors in Traversing in-core Probe Sys Vs Five Presently Required
ML17278A448
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/17/1985
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17278A447 List:
References
TAC-59904, NUDOCS 8510220324
Download: ML17278A448 (2)


Text

INSTRUMENTATION TRAVERSING IN-CORE PROBE SYSTFM LIMITING CONDITION FOR OPERATION 3.3.7.7.

The traversing in-core probe system*shall be OPERABLE with:

a.

five movable detectors,

drives, and readout equipqent to map the core, and b.

Indexing equipment to allow all five detectors 'to be calibr ated in a common location.

APPLICABILITY:

Mhen the traversing in-core probe is used for:

a.

Recalibration of the LPRM detectors, and b."

Monitoring the

APLHGR, LHGR, MCPR, or MFLPD.

ACTION:

With the traversing in-core probe system

operable, suspend use of the system for the above applicable monitoring or ca~i ration functions.

The provisions of Specifications 3.0.3 and 3.0.4 are noQapplicable.

A%

4.3.7.7 The traversing in

~e probe system shall be demonstrated OPERABLE by normalizing each of the a o required detector outputs within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to use for the above applic ble monitoring or calibration functions.

Only the detector(s) in the required measurement location(s) are required to be OPERABLE.

9 cv4c.,

Ud'W Aug-eparablc.

fee ~<kg'~-co~

gnome<

a~

W~g+~$ 5g-gf~ Leam s~i~(g) r ca) hQ, ~lc,br~feg c'n-ccrc-e pwbe.

scam ~~ ~ rig',~/~i< ~~~

C

~i-a~

'A 'hype. ce~k<l log pw~~

(',s c',~ cysts ~ g ~i,,g

~~l

<a e. ~P ~So.>VWM> rS less+4

~ &'f goy.~~~ ~<gz )

MA~HI'fC ON NUCLEAR UNI

" 8510220324 8550~397 l,

pgR AQOCK 050 pDR P

~ < t

~ ~

aa

~