Text
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-15W Equipment Class:
(21) Tanks and Heat Exchangers EauiDment
Description:
WEST COMPONENT COOLING WATER HEAT EXCHANGER Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB2, 609.00 ft, 609 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Threads not fully engaged on south west bolt, but OK only minor.
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-157
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-15W Equipment Class:
(21) Tanks and Heat Exchangers Eauipment
Description:
WEST COMPONENT COOLING WATER HEAT EXCHANGER
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall on south-west side of heat exchanger - retrofitted - OK per DWG 12-4028, Wall W-10
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Cable trays lightly loaded Comments Fire piping above well supported Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-158
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [li N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-15W Equipment Class:
(21) Tanks and Heat Exchangers cr-r C
C-1 59
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
Equipment
Description:
1-HE-15W (21) Tanks and Heat Exchangers WEST COMPONENT COOLING WATER HEAT EXCHANGER P9100014 P9100015 C-1 60
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-17W Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 609.00 ft, 6 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincs. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
SQUG 1-HE-17WREVO
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-1 61
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LYii N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-17W Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-162
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-17W Equipment Class:
(21) Tanks and Heat Exchangers Ir,..mnmnf fl-enrinfinn-
\\AI9=(T PrInI IAI WlAT IDPIAI r I-I:AT ýVCrWAMIIA:D r'*l C-1 63
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-17W Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER P9181105 P9181106 C-164
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 609.00 ft, 4 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
SQUG 1-HE-18WREVO
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes Verified with pictures where not visible from platforms
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes Yes Yes
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Interaction Effects C-165
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-166
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-i N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers r'-*,,;
+%A1:Q r'fn,.+*.*
^r*
"KlTAIKl/Ir-CKlT QDDAV ILlMAT ::Y '-IKtI:Q C-167
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-ý N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER P9180951 P9180952 C-168
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers r-,,,,,'m,*+ r
.,.r~,+;
%A.
\\lrQT Pt'nIlTAIKlIRArI~kT QDI*AV WIllAT Ir::f'W" I r-r-Pl'.I:I C-169
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y--] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HE-18W Equipment Class:
(21) Tanks and Heat Exchangers Equipment
Description:
WEST CONTAINMENT SPRAY HEAT EXCHANGER C-170
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-ACRA-2 Equipment Class:
(10) Air Handlers Equipment
Description:
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 650.00 ft, 129 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-171
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-1 N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-ACRA-2 Equipment Class:
(10) Air Handlers Equipment
Description:
CONTROL ROOM VENTILATION SOUTH AIR CONDITIONING
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-172
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-ACRA-2 Equipment Class:
(10) Air Handlers I::dmr n 1"3c=rnfinn
- I"MTI*nI Pr"*'n5A \\/PI:TII ATIAM *(r'*IHTI-AII*P~rM-IIMk C-1 73
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LI] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-ACRF-2 Equipment Class:
(9) Fans Equipment
Description:
CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNIT Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 650.00 ft, 129 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-1 74
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-ACRF-2 Equipment Class:
(9) Fans Equipment
Description:
CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNIT
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block Wall - retrofitted - OK per DWG 12-4031, Wall W-1
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-175
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-ACRF-2 Equipment Class:
(9) Fans Puiiimnment nnorinninn-rn" MTPll I 1nrtlf A DI:
CZQI I1I7ATIflMIl/I IýAKII IP MI TIgI I IWIT C-176
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZ-N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-ACRF-2 Equipment Class:
(9) Fans Equipment
Description:
CONTROL ROOM PRESSURIZATION/CLEANUP FILTER UNIT P9100108 P9100109 C-177
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rI-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-AES-2 Equipment Class:
(10) Air Handlers Equipment
Description:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 633.00 ft, 8 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
DWG 12-5739 REVI
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-178
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-AES-2 Equipment Class:
(10) Air Handlers Equipment
Description:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Block wall behind filter unit - DWG 12-4029, Wall W-1
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
Georqe G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-1 79
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-AES-2 Equipment Class:
(10) Air Handlers C-180
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FT N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-AES-2 Equipment Class:
(10) Air Handlers ipment
Description:
AUXILIARY BUILDING VENTILATION ENGINEERED SAFETY C-181
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rY-N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-AES-2 Equipment Class:
(10) Air Handlers AM IYII IADV 4G\\
C-182
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-AES-2 Equipment Class:
(10) Air Handlers pment
Description:
AUXILIARY BUILDING C-183
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-1 Equipment Class:
(10) Air Handlers Equipment
Description:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1 Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
CON1, 612.00 ft, 75 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
No
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Only saw 2.5 out of 4 sides of bolts
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-184
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [j ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-1 Equipment Class:
(10) Air Handlers Equipment
Description:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #1
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-185
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Ijj N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-1 Equipment Class:
(10) Air Handlers YDROGEN SKIMMER VENTILA
- 11 I I I C-186
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-1 Equipment Class:
(10) Air Handlers Irm*li nmn*nflccrinfnn" C('hMTAIMNIAI:NIT I OGEN SKIMMER VENTILATION FAN #1 C-187
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-2 Equipment Class:
(10) Air Handlers EquiDment
Description:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
CON 1, 625.00 ft, 74 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
SHOULD BE CHANGED TO 'NO'NOT ACCESSIBLE ALL THE WAY AROUND
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes Can only see one side and 1 wall beam anchorage
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Painted bolts
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Should be taken off anchorage list cannot see all anchors
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Yes Interaction Effects C-188
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-2 Equipment Class:
(10) Air Handlers Ecuipment
Description:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
-George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-189
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y-- ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-2 Equipment Class:
(10) Air Handlers NIT HYDR(
C-190
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [YI1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-CEQ-2 Equipment Class:
(10) Air Handlers Equipment
Description:
CONTAINMENT HYDROGEN SKIMMER VENTILATION FAN #2 P9120410 P9120411 C-191
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYZJ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-DGX-1 Equipment Class:
(9) Fans Equipment
Description:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
ABI, 587.00 ft, 121 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. Additional space is provided at the end of this checklist for documentinq other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
SQUG 1-HV-DGX-1 REVO
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Cannot see all bolts - other equipment/piping in area obstruct view. Visible bolts OK
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes Yes Visible bolts OK
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
CANNOT VERIFY ALL BOLTS
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Not Applicable Yes Interaction Effects C-1 92
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-DGX-1 Equipment Class:
(9) Fans Equipment
Description:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-193
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-DGX-1 Equipment Class:
(9) Fans Equipment
Description:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION C-194
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
YI-N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-DGX-1 Equipment Class:
(9) Fans Equipment
Description:
AB EMERGENCY DIESEL GENERATOR ROOM VENTILATION P9130305 P9130306 C-1 95
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
-lI N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-SGRS-8 Equipment Class:
(9) Fans Equipment
Description:
4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR11A AND Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 609.00 ft, 204 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
SQUG 1-HV-SGRS-8 REVO
- 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes
- 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
- 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Unistrut mounted
- 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Yes Interaction Effects C-1 96
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-SGRS-8 Equipment Class:
(9) Fans Equipment
Description:
4KV ROOM 600V SWITCHGEAR TRANSFORMERS TR 11A AND
- 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
- 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9.
Do attached lines have adequate flexibility to avoid damage?
Yes Yes
- 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
- 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18112 Neda Stoeva 10/18/12 Photos C-197
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-]
N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-SGRS-8 Equipment Class:
(9) Fans I::::r r*Pri Ak'%I IDtnnKA Prnl 4Z\\AIITI"WP.Ir-AID TD::AlKlQl9tnlD/lr:Q TDI 1 A AKll-I C-198
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-HV-SGRS-8 Equipment Class:
(9) Fans I*irm, rNo,-AiPfi,-r.
AVII Dnnh~tA CMO"X\\ CZIAIITf'I-It'2.1AD TrDAK1I4Z:'PDhACIIDQ TID4 4 A AKlr~l C-199