Withdrawal of Relief Request RR-1 and RR-3 for the Fifth 10-Year Interval Inservice Inspection Program Plan
ML12131A200
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/18/2012
From: Billoch-Colon A
Plant Licensing Branch II
To: William Gideon
Carolina Power & Light Co
Billoch-Colon, A T
References
TAC ME8252, TAC ME8254
Download: ML12131A200 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 18, 2012 Mr. William R. Gideon, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant, 3581 West Entrance Road Hartsville, South Carolina 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - WITHDRAWAL OF RELIEF REQUEST (RR)-1 AND RR-3 FOR THE FIFTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN (TAC NOS. ME8252 AND ME8254)

Dear Mr. Gideon:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated March 14.2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12082A009).

Carolina Power &Light Company. doing business as Progress Energy Carolinas, Inc.,

submitted Relief Request (RR)-1 "Pressurizer Surge Line Nozzle Inner Radius" and RR-3 "Reactor Vessel Bottom Head Peel Segment-To-Disk Circumferential Weld" for the Inservice Inspection Program Plan for the Fifth 10-Year Interval for the H. B. Robinson Steam Electric Plant. Unit No.2.

By letter dated April 26. 2012. (ADAMS Accession No. ML12130A221), you requested to withdraw RR-1 and RR-3 from NRC review. The NRC acknowledges your request to withdraw RR-1 and RR-3. The NRC staff activities on the review have ceased and the associated Technical Assignment Control numbers has been closed.

If you have any questions, please contact me at (301) 415-3302.

Sincerely, Araceli T. Billoch Col6n, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via ListServ

ML12130A221), you requested to withdraw RR-1 and RR-3 from NRC review. The NRC acknowledges your request to withdraw RR-1 and RR-3. The NRC staff activities on the review have ceased and the associated Technical Assignment Control numbers has been closed.

If you have any questions, please contact me at (301) 415-3302.

Sincerely, IRA!

Araceli T. Billoch Col6n, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261 cc: Distribution via ListServ DISTRIBUTION:

PUBLIC Lp12-2 R/F RidsNrrDorlLpl2-2 RidsNrrLABClayton RidsAcrsAcnw_MailCTR RidsNrrPMRobinson RidsNrrDeEptb RidsRgn2MailCenter RidsOgcRp DAiley, NRR ADAMS Accession No'.. ML12131A200 OFFICE LPL2-21PM LPL2-2/LA LPL2-2/BC LPL2-21PM NAME ABillochCol6n BClaY10n DBroaddus (IOrf for)

ABillochCol6n DATE 05/11112 05/11112 05/18/12 05/18112