RNP-RA/12-0047, Inservice Inspection Program for the Fifth Ten-Year Interval Withdrawal of Relief Requests RR-01 and RR-03

From kanterella
(Redirected from ML12130A221)
Jump to navigation Jump to search

Inservice Inspection Program for the Fifth Ten-Year Interval Withdrawal of Relief Requests RR-01 and RR-03
ML12130A221
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/26/2012
From: Wheeler S
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/12-0047
Download: ML12130A221 (2)


Text

10 CFR 50.55a jProgress Energy Serial: RNP-RA/12-0047 A P R 2.6 2012 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 INSERVICE INSPECTION PROGRAM FOR THE FIFTH TEN-YEAR INTERVAL, WITHDRAWAL RELIEF REQUESTS RR-01 AND RR-03 Ladies and Gentlemen:

By letter dated March 14, 2012, (Agencywide Documents Access and Management System (ADAMS) Accession Number ML12082A009), Carolina Power and Light (CP&L)

Company, now doing business as Progress Energy Carolinas, Inc.(PEC), submitted the "Fifth Ten-Year Interval Inservice Inspection Program" for the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. This submittal included relief requests RR-01 and RR-03.

On April 10, 2012, a telephone conference was held between the HBRSEP NRC Project Manager and PEC staff members. During the conference, the NRC indicated that it was unable to support approval of relief requests RR-01, "Pressurizer Surge Line Nozzle Inner Radius," and RR-03, "Reactor Vessel Bottom Head Peel Segment-to-Disk Circumferential Weld," due to the length of time that would pass between approval date and when they would be needed.

Additionally, during the conference, the HBRSEP NRC PM requested that these two relief requests be withdrawn by May 4, 2012. Therefore, by this letter, PEC withdraws relief requests RR-01 and RR-03.

Progress Energy Carolinas, Inc.

Robinson Nuclear Plant 3581 West Entrance Road Hartsville, SC 29550 4L

United States Nuclear Regulatory Commission Serial: RNP-RA/12-0047 Page 2 of 2 This document contains no new Regulatory Commitments. If you have any questions on this subject, please contact Richard Hightower, Supervisor - Licensing/Regulatory Programs at (843) 857-1329.

Sincerely, Sharon Wheeler Manager Support Services - Nuclear SAW/rjr c:

V. M. McCree, NRC, Region II Ms. Araceli Billoch Col6n, NRC, NRC (w/o Attachments)