ML111250103
| ML111250103 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/05/2011 |
| From: | Price J Dominion Nuclear Connecticut |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 11-224, TAC ME4473 | |
| Download: ML111250103 (5) | |
Text
Dominion Nuclear Connecticut, Inc.
5000 Dominion Boulevard, Glen Allen. Virginia 23060 Web Address: www.dom.com May 5,2011 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.
NSSLIWDC Docket No.
License No.11-224 RO 50-336 DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 2 REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-04-04 USE OF ALTERNATIVE PRESSURE TESTING CRITERIA FOR THE SYSTEM LEAKAGE TEST CONDUCTED AT OR NEAR THE END OF THE INSPECTION INTERVAL ON CLASS 1 PIPING (TAC NO. ME4473)
Dominion Nuclear Connecticut, Inc. (DNC) submitted the Millstone Power Station Unit 2 (MPS2) fourth 10-year lSI program with associated proposed alternatives and relief requests in a letter dated July 29, 2010 and supplemental letter dated August 5, 2010.
DNC requested the use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI requirements.
Included in the submittal was Relief Request RR-04-04, which requests alternative pressure testing criteria for three different Component Groups of Class 1 piping segments. In a letter dated April 20, 2011, the NRC transmitted a request for additional information (RAI). It was agreed DNC would respond to the RAI by May 6,2011. provides DNC's response to the NRC RAI. In the response to Question 3, DNC concludes relief for the Component Group 2 segments portion of RR-04-04 is no longer required due to the subsequent acceptance of Code Case N-731 in Regulatory Guide 1.147. Therefore, this portion of the relief request is hereby withdrawn.
If you have any questions regarding this submittal, please contact Wanda Craft at (804) 273-4687.
Sincerely, J~
Vi~sident - Nuclear Engineering
Serial No.11-224 Docket No. 50-336 RAI Response for RR-04-04 Page 2 of 2
Attachment:
1.
Response to Request for Additional Information Regarding Relief Request RR-04-04 Use of Alternative Pressure Testing Criteria For The System Leakage Test Conducted At Or Near The End Of The Inspection Interval On Class 1 Piping Commitments made in this letter:
- 1. None cc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 J. 0 Hughey Project Manager - Millstone Power Station U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08-B1A Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station
Serial No.11-224 Docket No. 50-336 ATTACHMENT 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-04-04 USE OF ALTERNATIVE PRESSURE TESTING CRITERIA FOR THE SYSTEM LEAKAGE TEST CONDUCTED AT OR NEAR THE END OF THE INSPECTION INTERVAL ON CLASS 1 PIPING DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 2
Serial No.11-224 Docket No. 50-336 RAI Response for RR-04-04, Page 1 of 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST RR-04-04 USE OF ALTERNATIVE PRESSURE TESTING CRITERIA FOR THE SYSTEM LEAKAGE TEST CONDUCTED AT OR NEAR THE END OF THE INSPECTION INTERVAL ON CLASS 1 PIPING Dominion Nuclear Connecticut, Inc. (DNC) submitted the Millstone Power Station Unit 2 (MPS2) fourth 10-year lSI program with associated proposed alternatives and relief requests in a letter dated July 29, 2010 and supplemental letter dated August 5, 2010.
DNC requested the use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI requirements.
Included in the submittal was Relief Request RR-04-04, which requests alternative pressure testing criteria for three different Component Groups of Class 1 piping segments. In a letter dated April 20, 2011, the NRC transmitted a request for additional information (RAI). This attachment provides DNC's response to the NRC RAI.
Question 1 The descriptions for piping segments M2-15 through M2-33 differ from those in the previous Relief Request dated August 17, 2006 (ADAMS Accession Number ML062400421). Piping segments M2-15 through M2-17 of the previous Relief Request are missing from the current Relief Request. Confirm the correct descriptions, Segment Boundaries and Component Groups for piping segments M2-15 through M2-33.
DNC Response The piping associated with segments M2-15 through M2-17 of the previous relief request dated August 17, 2006 was permanently removed as part of a piping design modification, therefore, the segments are not included in the current Relief Request RR-04-04. Since previous piping segments M2-15 through M2-17 were removed, the sequence of segment numbering changed. Previous relief request segments M2-18 through M2-36 were re-numbered as M2-15 through M2-33 in Relief Request RR-04-04 and they reflect the correct descriptions, segment boundaries and component groups.
Question 2 Segment M2-14 of the current Relief Request, PZR {pressurizer] Relief Line Vent, has different Segment Boundaries (2-RC-050 to 2-RC-051) than it had in the previous Relief Request dated August 17, 2006, (2-RC-021 to 2-RC-421). Confirm the correct Segment Boundaries.
DNC Response Segment M2-14 has undergone a piping design modification since the previous relief request. The modification replaced the previously listed boundary valves 2-RC-021 and 2-RC-421 with new valves 2-RC-050 and 2-RC-051. The segment M2-14 boundaries are listed correctly in Relief Request RR-04-04 as 2-RC-050 to 2-RC-051.
Serial No.11-224 Docket No. 50-336 RAI Response for RR-04-04, Page 2 of 2 Question 3 Code Case N-731, "Alternative Class 1 System Leakage Test Pressure RequirementsSection XI, Class 1," was accepted for use in Regulatory Guide 1.147, Revision 16, in October 2010. Do the Component Group 2 segments (LPSI headers) meet the requirements of Code Case N-731?
ONe Response The Component Group 2 segments (LPSI headers) do meet the requirements of Code Case N-731. With Code Case N-731 now approved for use in Regulatory Guide 1.147, Revision 16, relief is no longer required for the Group 2 segments. Therefore, ONC is withdrawing the portion of Relief Request RR-04-04 for Component Group 2 segments.