Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages, L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit, L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML100320229, ML100710787, ML100740044, ML110190204, ML11325A426, ML12340A430, ML13191B128, ML13282A142, ML14141A399
|
MONTHYEARML1002805572009-12-31031 December 2009 NEDO-33435, Revision 1, Safety Analysis Report for Monticello Maximum Extended Load Line Limit Analysis Plus, Attachment 5 of L-MT-10-003 Project stage: Request ML1002805582010-01-21021 January 2010 License Amendment Request: Maximum Extended Load Line Limit Analysis Plus Project stage: Request ML1003202292010-02-16016 February 2010 Determination That Attachment 3 Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-10-017, Mellla+: Supplemental Information Needed to Complete the Acceptance Review2010-03-0404 March 2010 Mellla+: Supplemental Information Needed to Complete the Acceptance Review Project stage: Supplement ML1007104442010-03-0404 March 2010 Enclosure 2, GE-MNGP-AEP-1687, Rev. 1, GEH Responses to NRC Supplemental Requests 1, 3, and 4 Project stage: Supplement ML1007400442010-03-15015 March 2010 Application for Mellla+ Amendment Acceptable for Review Project stage: Other ML1007107872010-03-19019 March 2010 Determination That Enclosure 1 of 3/4/10 Letter Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-10-049, Response to Request for Additional Information for the Monticello Proposed Maximum Extended Load Line Limit Analysis Plus (Mellla+) Amendment2010-09-28028 September 2010 Response to Request for Additional Information for the Monticello Proposed Maximum Extended Load Line Limit Analysis Plus (Mellla+) Amendment Project stage: Response to RAI ML1027903732010-09-28028 September 2010 Enclosure 2, GE-MNGP-AEP-1913 R1, GEH Responses to Reactor Systems RAIs Project stage: Request ML1101902042011-02-0808 February 2011 Request for Withholding for Proprietary Information from Public Disclosure Project stage: Other L-MT-11-066, Correction of 10 CFR 50.46 Analysis Error Applicable to Monticello Extended Power Uprate (TAC MD9990) and Monticello Maximum Extended Load Line Limit Analysis Plus (TAC ME3145) License Amendment Requests2011-11-11011 November 2011 Correction of 10 CFR 50.46 Analysis Error Applicable to Monticello Extended Power Uprate (TAC MD9990) and Monticello Maximum Extended Load Line Limit Analysis Plus (TAC ME3145) License Amendment Requests Project stage: Request ML11325A4262011-11-30030 November 2011 Letter Approving Withholding from Public Disclosure Two Documents Containing Proprietary Information Submitted in the Licensees 11/11/2011 Letter Project stage: Other ML12192A1042012-06-27027 June 2012 Supplement to Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Supplement ML12279A2242012-10-0404 October 2012 NRR E-mail Capture - Monticello Nuclear Generating Plant - Draft Request for Additional Information Mellla+ License Amendment Review Project stage: Draft RAI ML12319A1792012-11-0808 November 2012 NRR E-mail Capture - Monticello Nuclear Generating Plant - Draft Requests for Additional Information Mellla+ License Amendment Request Review Project stage: Draft RAI L-MT-12-107, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.72012-11-30030 November 2012 Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement to Address Secy 11-0014 Use of Containment Accident Pressure, Sections 6.6.4 and 6.6.7 Project stage: Supplement ML12340A4302012-11-30030 November 2012 Enclosure 2, Presentation Materials Used During the Course of the NRC Audit of General Electric - Hitachi Held on October 24-25, 2012 - Non-Proprietary Project stage: Other 05000263/LER-2012-004, Regarding High Pressure Coolant Injection Inoperable When Inverter Is Out of Service2012-11-30030 November 2012 Regarding High Pressure Coolant Injection Inoperable When Inverter Is Out of Service Project stage: Request L-MT-12-111, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - General Electric - Hitachi Presentation Materials Discussed at the NRC Audit Held October 24 - 25, 20122012-11-30030 November 2012 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - General Electric - Hitachi Presentation Materials Discussed at the NRC Audit Held October 24 - 25, 2012 Project stage: Request L-MT-12-108, Responses to Request for Additional Information for Trace/Tracg Differences - Maximum Extended Load Line Limit Analysis Plus License Amendment Request2012-12-21021 December 2012 Responses to Request for Additional Information for Trace/Tracg Differences - Maximum Extended Load Line Limit Analysis Plus License Amendment Request Project stage: Response to RAI L-MT-12-117, 10 CFR 50.46 Thirty-Day Report2012-12-26026 December 2012 10 CFR 50.46 Thirty-Day Report Project stage: Request ML13009A0122013-01-25025 January 2013 Request for Withholding of Proprietary Information from Public Disclosure Enclosure 1 of Letter Dated November 30, 2012 Project stage: Withholding Request Acceptance ML13009A0142013-01-25025 January 2013 Request for Withholding of Proprietary Information from Public Disclosure Enclosure 2 of Letter Dated December 21, 2012 Project stage: Withholding Request Acceptance L-MT-13-053, 0000-0146-5423-SRLR, Rev. 1, Supplemental Reload Licensing Report for Monticello, Reload 26 Cycle 27 Extended Power Uprate (EPU)2013-01-31031 January 2013 0000-0146-5423-SRLR, Rev. 1, Supplemental Reload Licensing Report for Monticello, Reload 26 Cycle 27 Extended Power Uprate (EPU) Project stage: Supplement ML13137A1022013-04-24024 April 2013 NRR E-mail Capture - Monticello Nuclear Generating Plant - Requests for Additional Information (Scvb) Supporting the EPU and Mellla+ Reviews Project stage: RAI L-MT-13-036, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 1722013-05-13013 May 2013 Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Application of License Amendment 172 Project stage: Supplement ML13191B1282013-06-26026 June 2013 NEDO-33820, Revision 0, Monticello Nuclear Generating Plant Upper Shelf Energy Evaluation for Plate C2220 Material for 54 EFPY, Enclosure 5 Project stage: Other L-MT-13-059, Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Informati2013-06-26026 June 2013 Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Response to Request for Additional Information Reactor Systems Branch and Vessel & Internals Integrity Branch and Supplemental Information Project stage: Supplement ML13191A5682013-07-0808 July 2013 Extended Power Uprate & Maximum Extended Load Line Limit Analysis Plus License Amendment Requests: Supplement for Analytical Methods Used to Address Thermal Conductivity Degradation & Analytical Methods Limitations Project stage: Supplement L-MT-13-070, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-07-31031 July 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses Project stage: Request L-MT-13-081, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-08-14014 August 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses Project stage: Request ML13282A1412013-10-0404 October 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses Project stage: Request L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages2013-10-0404 October 2013 GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages Project stage: Other ML13282A1422013-10-0404 October 2013 GE-MNGP-AEP-3304R1, Enclosure 2, GEH Response to Mella + RAI 2 Project stage: Other ML13239A0762013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavit Executed on March 14, 2013, by Linda C. Dolan of GE-Hitachi Project stage: Withholding Request Acceptance ML13239A0842013-10-0808 October 2013 Generation Plant - Request for Withholding of Proprietary Information from Public Disclosure Associated with Affidavits Executed on March 14, 2013, by Linda Dolan and June 12, 2013, by Kurt Edsinger of Project stage: Withholding Request Acceptance ML13316B1072013-11-0101 November 2013 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus Project stage: Request ML13337A2892013-11-26026 November 2013 NRR E-mail Capture - Monticello Nuclear Generating Plant - Draft Request for Additional Information Maximum Extended Load Line Limit Analysis Plus LAR Review Project stage: Draft RAI ML13358A3722013-12-20020 December 2013 Maximum Extended Load Line Limit Analysis Plus: Cycle 27 Safety Reload Licensing Report and Request for Additional Information Response Project stage: Request L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit2013-12-20020 December 2013 Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit Project stage: Other ML13358A3732013-12-31031 December 2013 Enclosure 1, Reload 26 Cycle 27 Supplemental Reload Licensing Report, 000N0154-SRLR, Revision 5, Extended Power Uprate and Maximum Extended Load Line Limit Plus Project stage: Supplement L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications2014-02-24024 February 2014 Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications Project stage: Other ML14087A0132014-03-28028 March 2014 Safety Evaluation Regarding the Maximum Extended Load Line Limit Plus (Mellla+) Review (non-proprietary Version) Project stage: Approval ML14035A2482014-03-28028 March 2014 Issuance of Amendment No. 180 to Implement Maximum Extended Load Line Limit Analysis Plus (Mellla+) Operating Domain Project stage: Approval ML14141A3992014-05-27027 May 2014 Correction Letter for License Amendment No. 180 Maximum Extended Load Line Limit Plus (Mellla+) Project stage: Other ML14169A0342014-06-13013 June 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Revision 1 Project stage: Request L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462016-12-19019 December 2016 Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 Project stage: Other 2013-01-31
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 16, 2010 Mr. Timothy J. O'Connor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637 SUB~IECT:
MONTICELLO NUCLEAR GENERATING PLANT - DETERMINATION THAT SUBMITTED INFORMATION IS PROPRIETARY AND WILL BE WITHHELD FROM PUBLIC DISCLOSURE (TAC NO. ME3145)
Dear Mr. O'Connor:
By letter dated January 21,2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100280565), Xcel Energy submitted an application for amendment to use the Maximum Extended Load Line Limit Analysis Plus methodology. The application included an affidavit executed by Mr. Edward D. Schrull of GE-Hitachi Nuclear Energy Americas LLC (GEH), on December 16, 2009, requesting that the Attachment 3, topical report NEDC 33435P, "Safety Analysis Report for Monticello Maximum Extended Load Line Limit Analysis Plus," Revision 1, be withheld 'from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.
The affidavit stated that Attachment 3 should be considered exempt from mandatory public disclosure because it contains:
- a.
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies;
- b.
Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; We have reviewed GEH's affidavit in accordance with the requirements of 10 CFR 2.390, and on the basis of its statements, we have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, Attachment 3, which is marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
We have released to the public the non-proprietary version of Attachment 3, identified as (ADAMS Accession No. ML100280557).
T. J. O'Connor
- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the !\\IRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1451.
Sincerely, (2~Y\\
Pet~r S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: See next page
Monticello Nuclear Generating Plant cc: Mr. Edward D. Schrull Vice President, Regulatory Affairs Services Licensing GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via ListServ
T. J. O'Connor
- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1451.
Sincerely, IRAJ Peter S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263 cc: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlLpl3-1 Resource RidsNrrPMPTamResource RidsNrrLATHarrisResource RidsOgcMailCenterResource RidsAcrsAcnw_MailCTRResource RidsNrrDirsltsb RidsRgn3MailCenterResource RidsNrrDorlDprResource LPL 3-1 R/F Accession No'.. ML100320229 OFFICE LPL3-1/PM LPL3-1/LA SRXB/BC LPL3-1/BC I
NAME PTam THarris GCranston RPascarel1i DATE 2/05/10 2/04/10 2/16/10 2/16/10 OFFICIAL RECORD COPY