ML092750517
| ML092750517 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/01/2009 |
| From: | Pickett D Plant Licensing Branch 1 |
| To: | Harding T Constellation Energy Group |
| Pickett , NRR/DLPM, 415-1364 | |
| References | |
| TAC ME2232, TAC ME2233, TAC ME2234, TAC ME2235, TAC ME2236, TAC ME2237, TAC ME2238, TAC ME2239 | |
| Download: ML092750517 (2) | |
Text
From:
Pickett, Douglas Sent:
Thursday, October 01, 2009 4:29 PM To:
Harding Jr, Thomas Cc:
Farnan, Michael; Wolfgang, Robert; Lingam, Siva; Feintuch, Karl
Subject:
Ginna Acceptance Review of IST Relief Requests (TAC Nos. ME2232 - ME2239)
Dear Mr. Harding:
By letter dated September 11, 2009 (TAC Nos. ME2232 through ME2239), R.E. Ginna Nuclear Power Plant, LLC submitted relief requests for the 5th 10-year inservice testing interval for the R.E. Ginna Nuclear Power Plant. The purpose of this email is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of the relief requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concludes that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Please contact me if you have any questions. A copy of this email will be placed in the Agencywide Documents Access and Management System as a publicly available document.
Douglas V. Pickett, Senior Project Manager Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Ginna Acceptance Review of IST Relief Requests (TAC Nos. ME2232 -
ME2239)
Sent Date: 10/01/2009 4:22:55 PM
Received Date: 10/01/2009 4:29:00 PM From: Pickett, Douglas Created By: Douglas.Pickett@nrc.gov Recipients:
Thomas.HardingJr@constellation.com (Harding Jr, Thomas)
Tracking Status: None Michael.Farnan@nrc.gov (Farnan, Michael)
Tracking Status: None Robert.Wolfgang@nrc.gov (Wolfgang, Robert)
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 16740 10/01/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: