ML091900244

From kanterella
Jump to navigation Jump to search

License Renewal Application Online Reference Portal
ML091900244
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/07/2009
From: David Wrona
License Renewal Projects Branch 2
To: Edington R
Arizona Public Service Co
Regner L M, NRR/DLR, 415-1906
References
TAC ME0261, TAC ME0262, TAC ME0263
Download: ML091900244 (5)


Text

August 7, 2009 Mr. Randall K. Edington Executive Vice President, Nuclear Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL (TAC NOS. ME0261, ME0262, ME0263)

Dear Mr. Edington:

The U.S. Nuclear Regulatory Commission (NRC or the staff) has received your application dated December 11, 2008, and supplemented on April 14, 2009, for the renewal of the Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Palo Verde). On May 15, 2009, the NRC published a Federal Register notice of acceptance for docketing of the license renewal application (LRA).

To improve the efficiency of the environmental and safety reviews, Arizona Public Service Company (APS) and NRC staff discussed the use of an online reference portal that would allow the NRC staff and associated contractors limited read-only access to the basis documents and other reference materials cited in the Palo Verde LRA. The online reference portal will allow the NRC staff to audit basis documents to determine whether the information contained in the documents supports the LRA. The NRC staff will formally request documents to be submitted on the docket, which the staff identify as necessary for its analysis of the LRA or development of the environmental impact statement.

As discussed in your letter dated June 26, 2009, you agreed to the following conditions:

The online reference portal will be password-protected, and passwords will be distributed to NRC staff directly involved in the Palo Verde LRA review on a need-to-know basis; The online reference portal will disable any printing, saving, or downloading functions; The online reference portal will be sufficiently secure to prevent staff from printing, saving, or downloading any documents; Staff given password access to the online reference portal will be informed of the conditions of use of the online reference portal by NRC project managers; and The conditions associated with the online reference portal must be maintained throughout the duration of the Palo Verde LRA review process.

R. Edington Should you have any questions, please contact Ms. Lisa Regner, Senior Project Manager for the environmental review for the Palo Verde LRA, at 301-415-1906 or by e-mail at Lisa.Regner@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, 50-530 cc: See next page

ML091900244 OFFICE PM:DLR/RPB2 LA:DLR OGC (NLO)

BC:DLR/RPB2 NAME LRegner SFigueroa BMizuno DWrona DATE 07/13/09 07/10/09 07/13/09 08/07/09

Letter to R. Edington from D. Wrona, dated August 07, 2009 DISTRIBUTION:

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL (TAC NOS. ME0261, ME0262, ME0263)

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter JRowley BMizuno RTreadway (SRI)

GPick, RIV RidsOpaMail

Palo Verde Nuclear Generating Station cc:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 S. 40th Street Phoenix, AZ 85040 Mr. Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims, Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. John C. Taylor Director, Nuclear Generation El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy., Bldg. D21 San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 E. Thomas Road Scottsdale, AZ 85251 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 N. Congress Avenue Austin, TX 78701-3326 Ms. Karen O'Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 W. Washington Street Phoenix, AZ 85003