Issuance of Amendment Request to Revise Technical Specification Surveillance Requirements 3.5.1.3 to Correct the Alternate Nitrogen System Pressure (Tac MD4292)
ML080590541
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/21/2008
From: Feintuch K
NRC/NRR/ADRO/DORL/LPLIII-1
To: O'Connor T
Nuclear Management Co
Feintuch K, NRR/DORL/LPL3-1, 415-3079
Shared Package
ML080590519 List:
References
TAC MD4292
Download: ML080590541 (1)


Text

EGOS - Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME M. Two or more low MA1 Enter LCO 3.0.3.

Immediately pressure ECCS injection/spray subsystems inoperable for reasons other than Condition C, D, or F.

OR HPCI System and one or more ADS valves inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5. 1-1 Verify, for each low pressure ECCS injection/spray 31 days subsystem, the piping is filled with water from the pump discharge valve to the injection valve.

SR 3.5.1.2 Verify each EGGS injection/spray subsystem.

31 days manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.5.1.3 Verify ADS pneumatic pressure is as. follows for 31 days each required ADS pneumatic supply:

a. S/RV Accumulator Bank header pressure 2: 88.3 psig; and
b. Alternate Nitrogen System pressure is S410 psig.

Monticello 3.5.1-4 Montcell 3.51-4Amendment No. 4-465, 15 5