Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
~
Title:
Downshift Reactor Recirculation Pumps Task Number: 20291 501 01 Approvals:
/
Date Operations Training (Designee)
Revision: NRC 2005 NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer :
(ROlSRO)
TrainedEvaluator:
Evaluation Method: X P e r f o r m Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 1 1
04/20/05
Recommended Start Location:
Simulator Simulator Set-up:
Reset to IC-44 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
nd Auxiliary Operators. Prio Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*".
- 2. During Evaluated JPM:
Self-verification shall be demonstrated.
- 3. During Training JPM:
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-OP-29 G.l.O
- 2. NUREG WA 202001 A4.01 3.7/3.7 Tools and Equipment:
- 1.
None Task Standard:
Recirculation pumps 1A and 1 B running in slow speed with their flow control valves full open.
NRC JPM 1 2
04/20/05
Initial Conditions:
- 1. The plant is at 41 O/O power.
- 2. The Rod line is at 60%.
- 3. Hydrogen injection has been secured.
- 4. Evaluator to ask the operator for any questions.
Initiating cue:
RO - (Operators name), Transfer Recirc Pumps from high speed to low speed per N2-OP-29 section G. 1.O.
SRO - (Operators name), Transfer Recirc Pumps from high speed to low speed.
I Performance Steps I Standard 1
Grade 1
- 1. Provide repeat back of initiating cue.
Proper communications used for repeat Satfunsat Evaluator Acknowledge repeat back providing correction if necessary back (GAP-OPS-0 1 )
RECORD START TIME
- 2. Obtain a copy of the reference o N2-OP-29 obtained. Precautions &
Satf Unsat procedure and reviewlutilize the correct section.
referenced Limitations reviewed and section G.l.O
- 3. Verify the following:
3 BRKR 1NB control switches in o Observes BRKR 1A and 1 B control Satfunsat NORMAL.
switches in NORMAL o Observes BRKR 2A and 2B control Satfunsat o BRKR 2NB are open AND control switches in NORMAL switches in NORMAL.
Observes BRKR 2N2B green lights - ON Satfunsat o Observes BRKR 2N2B red lights - OFF Satfunsat o LFMG generator AND pump motor lockout AND relays are reset at RECIRCULATION SYSTEM LFMG SET PO01 A( B).
Cue: When asked, report that LFMG generator & pump motor lockout and relays are reset AUXILIARY RELAY PANEL B35-
- 4. At 2NPS-SWG004 (SWGOOS), confirm breaker 1, REACTOR RECIRCULATION PUMP MOTOR BRKR - 2A(B) 2RCS-M1A(B) is charged as indicated by yellow indicator on lower left of breaker.
Cue: Acknowledge request and report that breaker 1 on both NPS-SWG004 and 005 are charged.
- 5. Position AND hold BRKR 5A(B) control Rotates BRKR 5A control switch -
Pass/Fail switch to TRANSFER MG, THEN position the remaining BRKR 5B(A) o Rotates BRKR 5B control switch -
Pass/Fail control switch to TRANSFER MG TRANSFER MG TRANSFER MG The following annunciators alarm not requiring action:
603139 Reactor Water Level High (idclear)
NRC JPM 1 3
04/20/05
I Performance Steps I Standard I
Grade I o 60321 8 OPRM Trip Enabled (clears)
- 6. Observe the following:
o BRKR 5A trips.
LI BRKR 5B trips.
o 842310 HWC Trouble (reflashes) 851456 Cnst System Trouble No Backup Pmp Available (inklear) o Observes BRKR 5A red light - OFF Sat/Unsat o Observes BRKR 5A green light - ON Sat/Unsat o Observes BRKR 5B red light - OFF Sat/Unsat o Observes BRKR 5B green light - ON Sat/Unsat o BRKR 1A AND BRKR 1 B close.
o Observes BRKR 1A red light - ON Sat/ Unsat o Observes BRKR 1A green light - OFF Sat/ Unsat o Observes BRKR 1B red light - ON Sat/Unsat o Observes BRKR 1B green light - OFF Sat/Unsat o Pump speed lowers to between 460 o Observes speed on B35-651A and B drop Sat/Unsat AND 350 rpm.
<460 but >350 rpm 3 BRKR 2A AND BRKR 2B close.
o Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat Pump speed stabilizes at about 445 o Observes speed on B35-651A and B at Sat/Unsat rpm.
about 445 rpm
o Observe loop A VALVE POSITION at Sat/Unsat about 85%
o Observe loop B VALVE POSTION at Sat/Unsat about 95%
CONTROL stations, raise output signal to 100% (about 85 on A loop o/o VALVE POS IT1 0 N indicated ).
The following annunciators alarm not requiring action:
o 603218 OPRM Trip Enabled alarms
- 8. Monitors recirculation pump and LFMG Observe about 73 amps on AM-parameters.
2RCSA( B)60 Observe 445 rpm on B35-R651A(B).
n Dispatches an Auxiliary Operator to report LFMG generator voltage and amperage.
Cue: As the Auxiliary Operator, report that LFMG A generator indicates 1250 volts and 95 amps. Also, LFMG 6 generator indicates 1250 volts and 94 amps.
Sat/Unsat Sat/Unsat Sat/Unsat NRC JPM 1 4
04/20/05
I Performance Steps I Standard I
Grade 1
- 9. Reports that Recirc pumps have been transferred to slow speed.
Cue: Acknowledges the report.
TERMINATING CUE: Recirc pumps 1A and 1 B running in slow speed.
RECORD STOP TIME NRC JPM 1 5
04/20/05
Initial Conditions:
- 1. The plant is at 41% power.
- 2. The Rod line is at 60%.
- 3. Hydrogen injection has been secured.
- 4. Evaluator to ask the operator for any questions.
Initiating cue:
RO - (Operators name), Transfer Recirc Pumps from high speed to low speed per N2-0P-29 section G.l.O.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 1 6
04/20/05
Initial Conditions:
- 1. The plant is at 41% power.
- 2. The Rod line is at 60%.
- 3. Hydrogen injection has been secured.
- 4. Evaluator to ask the operator for any questions.
Initiating cue:
SRO - (Operators name), Transfer Recirc Pumps from high speed to low speed.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 1 7
0412 010 5
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
RCIC Injection With Oscillations (Faulted)
Revision: NRC 2005 Task Number: 2179150101 Approvals:
Operations Training (Designee)
NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
NA EXAMINATON SECURITY Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method: X Perform Simulate Evaluation Location: -Plant X
Simulator Expected Completion Time: 15 min.
Time Critical Task:
No Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator's Signature:
Date:
02-OPS-SJ E-21 7-2-05 NRC JPM 2 1
211 412005
Recommended Start Location:
Simulator Simulator Set-u p:
- 1. Reset to any hot IC
- 2. RPV pressure >300 psig
- 3. Malfunction RC04, TRUE, Event Trigger 049 [Relatives]
- 4. Reactor in MODE 3 with Main Turbine off-line, or RCIC-Turbine trip bypassed FALSE, Event Trigger 050 CAUTION: Do not use setup disk or snapshot. Load the Malfunction and relative each time, to ensure proper JPM event trigger operation.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.
With the exception of accessing panels, NO plant equipment will be physically manipulated.
Repositioning of devices will be simulated by discussion and acknowledged by my cues.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independenupeer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a "*".
- 2. During Evaluated JPM:
Self-verification shall be demonstrated.
- 3. During Training JPM:
0 Self-verification shall be demonstrated.
Additional verification shall be demonstrated.
References:
- 1. N2-OP-35, Section F.2.0
- 2. NUREG K/A 21 7000 A4.01 3.7/3.7 Tools and Equipment:
None Task Standard:
RClC Flow Controller in manual and with RClC injecting to RPV at approximately 600 gpm.
02-OPS-SJE-2 1 7-2-05 NRCJPM2 2
2/14/2005
Initial Conditions:
- 1. Reactor pressure is (report digital pressure reading on P603)
- 2. RPV level is lowering.
Initiating Cues:
(Operators name), initiate RCIC, inject into the RPV and establish rated flow, per N2-0P-35, Section F.2.0.
Performance Steps Sta nda rd Grade
- 1. Provide repeat back of initiating cue.
Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back providing correction if necessary.
back (GAP-OPS-01)
RECORD START TIME
- 2. Obtain a copy of the reference o N2-OP-35 obtained. Precautions &
Sat/ Unsat procedure and reviewhtilize the correct section of the procedure.
limitations reviewed and Section F.2.0 referenced.
- 3. Initiate RCIC.
- 4. Verify RClC System response.
02-OPS-SJE-217-2-05 At P601, rotate RClC manual initiation pushbutton collar to armed position.
Depress RClC manual initiation pushbutton.
a Verifies RClC has started properly by verifying the following:
o Gland Seal System Air Compressor STARTS.
o ICS*MOV116, Lube Oil Cooling Water Supply, OPENS.
ICS*MOV120, Turbine Steam Supply Valve, OPENS.
ICS*MOV126, RClC Pump discharge to the Reactor, OPENS.
o ICS*MOV143, RClC Pump minimum flow to the Suppression Pool. OPENS and then CLOSES once discharge flow is greater than 220 gpm.
a ICS*AOV 156 and 157, RClC Injection Outboard and Inboard Isolation Valves, OPEN once System Pressure is greater than Reactor Pressure.
Pass/Fail Pass/Fai I Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat NRCJPM2 3
211 4/2005
Grade Perfor ma nce Steps Standard
- 5. Observe and respond to failure of the Recognizes as RClC Flow is Pass/Fail o Places ICS*FClOI, RClC Flow PasdFail RClC System flow controller in AUTO.
increasing that the flow to the Reactor Vessel is OSCILLATING.
Controller in MANUAL and ESTABLISHES approximately 600 gpm flow rate.
- 6. Reports to the SM; u RClC is injecting to the Reactor Vessel at 600 gpm in the MANUAL mode.
u The Flow Controller, 21CS*FC10l1 IS NOT in the AUTOMATIC mode due to flow oscillations during startup of the RClC System.
CUE: As the SM, respond to the Sat/ Unsat Candidates report on the RClC System.
Candidates report on the RClC System.
Sat/ Unsat CUE: As the SM, respond to the J Current Reactor Vessel Level.
CUE: If asked, tell the Candidate that Sat/ Unsat/
RClC flow is still required, and to monitor the RClC System for any further signs of malfunctions.
NA Terminating Cue:
The RClC System is injecting in the manual mode at rated flow conditions.
RECORD STOP TIME 02-OPS-SJE-217-2-05 NRC JPM 2 4
2/14/2005
Initial Conditions:
- 1. Reactor pressure is (report digital pressure reading on P603)
- 2. RPV level is lowering.
L Initiating Cues:
(Operators name), initiate RClC per N2-OP-35, Section F.2.0, inject into the RPV and establish rated flow.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-SJE-217-2-05 NRCJPM2 5
2/14/2005
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Restore RHS in Shutdown Cooling Mode (Alternate)
Revision: NRC 2005 Task Number: 20500301 01 Approvals:
Operations Training (Designee)
NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(RO/SRO)
TrainerIEvaluator:
Evaluation Method:
X Perform Simulate Eva I ua t i o n Location :
Plant X
Simulator Expected Completion Time: 10 Mins.
Time Critical Task:
NO Alternate Path Task: YES Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Eva I ua tor's Signature :
Date:
NRC JPM 3 211 412005
Recommended Start Location:
Unit 2 Simulator
-~
Simulator Set-up:
- 1. Place Simulator in IC-43
- 2. Shutdown the B RHS Loop per N2-OP-31, Section H.3.0
- 3. Set up the following I/O and Event Trigger: - (P14/35), ET#51.
- a. I/O 2RHS*MOV40B control switch (Page 14/36) in Neutral and trigger (ET-51) with the red open indication for 2RHS*MOV40B.
(P601 -B22H-S44-A, RHR Shutdown Cooling Injection lsol Vlv MOV 406, NEUTRAL ETO1)
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.
Read Before Each Training JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a I..
- 2. During Evaluated JPM:
Self-verification shall be demonstrated.
- 3. During Training JPM:
Self-verification shall be demonstrated.
0 Additional verification shall be demonstrated.
References :
- 1. N2-OP-31, Section H.3.0 and H.4.0
- 2. N2-ARP-01, Attachment 6, ARP for window 601648
- 3. NUREG 11 23, 205000 A4.01 3.7/3.7 Shutdown Cooling System (RHR Shutdown Cooling Mode)
Tools and Equipment:
None required Task Standard:
RHS*Pl B tripped within 40 seconds of start NRC JPM 3 211 4/2005
Initial Conditions:
- 1. Plant is in mode 4.
- 2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
- 3. SDC Loop B has been shut down for 15 minutes.
- 4. RDS Back fill is in service.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-(Operators name), Restore RHS Loop B in Shutdown Cooling per N2-OP-31
. I SRO- (Operators name), Restore RHS Loop B in Shutdown Cooling.
I Performance Steps I Standad I
Grade I
- 1. Provide repeat back of initiating cue.
Proper communications used for repeat Sat/ Unsat Evaluator Acknowledge repeat back providing correction if necessary.
Manual).
back (GAP-OPS-01/0perations RECORD START TIME
- 2. Obtain a copy of the reference o N2-OP-31 obtained. Precautions &
limitations reviewed & section H.4.0 referenced.
procedure and reviewhtilize the correct section of the procedure.
Sa t/U nsa t
- 3. IF RDS Backfill Injection is out of a Determines that RDS backfill is in Sat/ Unsat service to one OR more RPV Level reference Legs in Mode 3, THEN perform the following:
service and no action is required,
- a. Enter N2-OP-lOlC, Attachment 1.
- b. Perform concurrently with this Subsection to monitor for possible RPV level instrumentation notching.
IF observed, take the proper actions.
- c.
- 4. CAUTION: The RHR pump is without o Obtains stopwatch.
minimum flow protection, Minimum flow of > 1000 gpm must be established within 40 seconds of pump start. Use of a stopwatch is recommended to ensure the pump is tripped within the required time if minimum flow is not achieved. Do not allow pump to run for > 15 seconds dead headed, Sat/ Unsat NRC JPM 3 2/14/2005
0 0
0 0
0 0
0 0
0 a
0 I Performance Steps I Standard I
Grade 1
- 5. Start 2RHS*P1 B at Panel 601.
- 6. Throttle open RHS*MOV40B, SDC B RETURN THROTTLE to > 1000 gpm.
- 7. IF RHS*MOV40B does not begin to open in 15 seconds OR system flow is NOT > 1000 gpm 40 seconds after pump start. Place RHS*PI B control switch to STOP, THEN release to Normal-After-Stop.
- 8. Report to CRS inability to obtain required minimum flow on RHS*PI B and that the pump has been tripped.
Rotates RHS*PI B control switch to start and releases to Normal-After-Start.
Starts the stopwatch Observes control switch red flagged.
Observes RHS*Pl B red light - ON Observes RHS*PI B green light - OFF Places RHS*MOV40B control switch to OPEN (requires key).
Observes RHS*MOV40B red light - ON Observes RHS*MOV40B green light -
ON Observes no rising flow indication on meter E l 2-R603B Prior to 40 seconds after RHS*PI B is started, places RHS*PI B control switch to STOP and releases to Normal-After-Stop.
Report made to CRS of inability to obtain satisfactory min-flow and that RHS*PI B has been tripped.
Cue: As the CRS, Acknowledge the report.
Terminating Cue:
RHS*Pl B tripped within 40 seconds of start.
RECORD STOP TIME PasslFail SaUUnsat SaUUnsat Sat/U nsa t SaUUnsat PasslFail SaUUnsat SaUUnsat SaUUnsat PasslFail Sat/ U nsa t NRC JPM 3 211 412005
Initial Conditions:
- 1. Plant is in mode 4.
- 2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
- 3. SDC Loop B has been shut down for 15 minutes.
- 4. RDS Back fill is in service.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-(Operators name), Restart RHS Loop B in Shut Down Cooling per N2-OP-31.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 3 211 412005
initial Conditions:
- 1. Plant is in mode 4.
- 2. SDC Loop B; has been shut down per N2-0P-31, section H.3.0.
- 3. SDC Loop B has been shut down for 15 minutes.
- 4. RDS Back fill is in service.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
SRO- (Operators name), Restart RHS Loop B in Shut Down Cooling.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 3 211 412005
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Initiate Containment Venting Through Standby Gas Treatment (GTS)
Revision: NRC 2005 Task Number: 2000070501 Approvals:
NA EXAMINATION SECURITY Date '
General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(ROISRO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X Simulator Alternate Expected Completion Time: 15 minutes Path Task: NO Time Critical Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Eva I ua tor Signature:
Date:
02-OPS-S J E-26 1 02 NRC JPM 4 1
04/20/05
Recommended Start Location:
Simulator Simulator Set-up:
This JPM can be run from any IC. No setup is required.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor I Evaluator:
- 1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a
- 2. During Evaluated JPM:
- 3. During Training JPM:
0 Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-0P-61A, Primary Containment Ventilation Purge & Nitrogen System, Section H.l.O
- 2. NUREG WA: 295024, EA1.20 3.5 / 3.6 Tools and Equipment:
None required Task Standard:
SBGTS Train A running, aligned to the Drywell in accordance with applicable procedures.
02-OPS-SJE-261-2-02 NRC JPM 4 2
04120105
Initial Conditions:
- 1. EOPs have been entered due to high suppression pool temperature.
- 2. Conditions require standby gas be placed on the drywell to reduce pressure.
- 3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
- 4. There is no Nitrogen makeup to the Primary Containment in progress.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-SRO- (Operators name), place Standby Gas Train A on the Drywell.
I Performance Steps I Standard (Operators name), place Standby Gas Train A on the Drywell per N2-0P-61A, Section H.l.O.
1 Grade I
- 1. Provide repeat back of initiating cue.
Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back providing correction if necessary.
repeat back (GAP-OPS-01 )
RECORD START TIME
- 2. Obtain a copy of the reference N2-0P-61A obtained. Precautions &
Sat/Unsat procedure and reviewhtilize the correct section of the procedure.
referenced.
Limitations reviewed & section H.l.O
- 3. IF required, as determined by o Determines that Chemistry samples have been obtained and analysis is completed Chemistry Supervision, notify Chemistry to sample the containment for the pre-vent acceptance criteria of ODCM Table D3.2.1-1 per Precaution and Limitation D.13.0 guidance:
- 4. IF time permits, concurrently with the following steps, fill out Attachment 3 for the valves operated (ODCM DSR 3.2.6.1). The listed position shall be the position of the valve following completion of the step.
Cue: Time does not permit the filling out of attachment 3.
- 5. IF desired to reduce Drywell or Suppression Chamber pressure, open the following:
o IAS*SOV168 at 2CEC*PNL851.
3 IAS*SOV180 at 2CEC*PNL851 02-OPS-SJE-261-2-02 o Places IAS*SOV168 control switch PasslFail o Observes IAS*SOV168 red light - ON Sat/Unsat o Observes IAS*SOV168 green light -
Sat/Unsat clockwise to OPEN.
OFF o Places IAS*SOV180 control switch PasslFail clockwise to OPEN o Observes IAS*SOV180 red light - ON Sat/Unsat o Observes IAS*SOV180 green light -
Sat/Unsat OFF NRC JPM 4 3
04/20/05
1 Performance Steps I Standard I
Grade I
- 6. Start at least one of the GTS trains by o rotates the Train A Initiation switch PasslFail placing TRAIN A (B) INITIATION Control Switch to START position at 2CEC*PNL870 (871) AND verify the following:
u GTS*MOVIA (B), INLET FROM RX BLDG VENTILATION - Opens.
u GTS*AOVZA (B), TRAIN A (B) INLET VLV - Opens.
u GTS*AOV3A (B), FAN 1A (B) DISCH ISOL VLV - Opens.
u GTS*FNIA (B), SBGTS FAN - Starts.
- 7. Verify that Chemistry is standing by to the sampling required durinq the vent (ODCM Table D3.2.1-1).
- 8. IF GTS operation is affecting Reactor Building differential pressure, adjust controller 2GTS*PDIK5A (B),
REACTOR BLDG INLET/OUTLET DlFF PRESS, to throttle 2GTS*PV5A (B), RX BLDG PRESSURE CONTROL as clockwise to the start position ON o Observes Train A Initiation red light -
SaUUnsat o Observes Train A Initiation green light Sat/Unsat
- OFF Observes GTS*MOVIA red light - ON Sat/Unsat o Observes GTS*MOVIA green light -
Sat/Unsat OFF o Observes GTS*MOV2A red light - ON Sat/Unsat o Observes GTS*MOV2A green light -
Sat/Unsat OFF Observes GTS*MOV3A red light - ON Sat/Unsat Observes GTS*MOV3A green light -
Sat/Unsat OFF Observes GTS*FNIA red light - ON Sat/Unsat o Observes GTS*FNIA green light -
Sat/Unsat OFF o Requests Chemistry Technician Sat/Unsat commence sampling Cue: If requested, inform Operator that Chemistry has starfed sampling during the vent.
u Verify Reactor Building pressure 5.6 Sat/ Unsat WG on GTS*PDIK5A.
If necessary, throttle pressure valve PasslFail 2GTS*PDIK5A as necessary to maintain 2 -.6WG Reactor Building necessary.
pressure.
02-OPS-SJE-261-2-02 NRC JPM 4 4
04/20/05
1 Performance Steps I Standard I
Grade I
- 9. At CEC*PNL873, verify the following valves closed:
aCPS*AOVI 04 Observe CPS*AOV104 green light -
SaffUnsat o Observe CPS*AOV104 red light - OFF Sat/Unsat ON o CPS*AOV105 LI CPS*AOVI 1 1 GTS*SOV102 u GTS*AOVlOl o Observe CPS*AOVlOS green light -
Sat/Unsat Observe CPS*AOVlOS red light - OFF SaffUnsat ON Observe CPS*AOV110 green light -
Sat/Unsat Observe CPS*AOVI 10 red light - OFF Sat/Unsat ON Observe CPS*AOV111 green light -
SaffUnsat R Observe CPS*AOV111 red light - OFF SaffUnsat ON o Observe CPS*AOV102 green light -
SaVUnsat o Observe CPS*AOV102 red light - OFF SaffUnsat ON o Observe CPS*AOV101 green light -
SaffUnsat Observe CPS*AOV101 red light - OFF SaffUnsat ON
- 10. At CEC*PNL875, verify the following o CPS*AOV106 Observe CPS*AOV106 green light -
Sat/Unsat ON o Observe CPS*AOV106 red light - OFF SaffUnsat valves closed:
3 CPS*SOV132/AOVI 07 LI CPS*AOVI 08 LICPS*SOVI 331AOV109
- 11. Notify Chemistry to start ODCM required sampling.
Observe CPS*SOV132/AOVI 07 green Sat/ Unsat o Observe CPS*SOV132/AOVI 07 red Sat/ Unsat light - ON light - OFF o Observe CPS*AOV108 green light -
SaffUnsat Observe CPS*AOV108 red light - OFF SaffUnsat ON R Observe CPS*SOV133/AOVI 09 green Sat/Unsat Observe CPS*SOV133/AOVI 09 red Sat/Unsat light - ON light - OFF Cue: If requested, inform Operator that Chemistry has started sampling during the vent.
02-OPS-SJE-261-2-02 NRC JPM 4 5
04/20/05
I Performance Steps I Standard I
Grade 1
- 12. At CEC*PNL873. ot3en 2GTS*SOVl 02.
u Rotates 2GTS*SOV102 control switch Pass/Fail clockwise to - OPEN Observe 2GTS*SOV102 red light - ON SaffUnsat u Observe 2GTS*SOV102 green light -
SaffUnsat OFF
- 13. At CEC*PNL873/875, open the following:
3 CPS*AOVI 08 o CPS*AOVI 10 u Rotate CPS*AOVI 08 control switch PasslFail u Observe CPS*AOV108 red light - ON Sat/Unsat o Observe CPS*AOV108 green light -
Sat/Unsat clockwise to OPEN OFF o Rotate CPS*AOVI 10 control switch PasslFail clockwise to OPEN Observe CPS*AOVI 10 red light - ON Sat/Unsat u Observe CPS*AOVI 10 green light -
Sat/Unsat OFF
- 14. Reports that GTS Train A is running on Cue: Acknowledge the report the Drywell.
TERMINATING CUE: SBGTS Train "A" running on the Drywell.
RECORD STOP TIME 02-OPS-SJE-261-2-02 NRC JPM 4 6
04/20/05
Initial Conditions:
- 1. EOPs have been entered due to high suppression pool temperature.
- 2. Conditions require standby gas be placed on the drywell to reduce pressure.
- 3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
- 4. There is no Nitrogen makeup to the Primary Containment in progress.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
RO-H. l.O.
(Operators name), place Standby Gas Train A on the Drywell per N2-OP-61A, Section Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-SJE-261-2-02 NRC JPM 4 7
04/20/05
Initial Conditions:
- 1. EOPs have been entered due to high suppression pool temperature.
- 2. Conditions require standby gas be placed on the drywell to reduce pressure.
- 3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
- 4. There is no Nitrogen makeup to the Primary Containment in progress.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
SRO- (Operators name), place Standby Gas Train A on the Drywell.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-SJE-261-2-02 NRC JPM 4 8
04/20/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 2000350501 Energize Reserve Station Transformer 1 B and NPS-SWG003. Revision: NRC 2005 Ap p rova Is:
NA EXAMINATION SECURITY Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Pe dorm e r :
(RO/SRO)
Trai ner/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 5 1
04/20/05
Recommended Start Location:
Simulator Simulator Set-up:
Reset to IC 46 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor I Evaluator:
- 1.
by a ".".
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted Self-verification shall be demonstrated.
0 Self-verification shall be demonstrated.
0 No other verification shall be demonstrated.
References:
- 1. N2-SOP-03 Tools and Equipment:
- 1. None Task Standard:
Reserve Transformer 1 B energized from Line 6 and NPS-SWG003 and NNS-SWGOI 3 energized from Reserve Transformer 1 B.
NRC JPM 5 2
04/20/05
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Initiating cue:
RO-(Operators name), Energize Reserve Station Transformer 1 B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.5 Power Restoration.
SRO-(Operators name), Energize Reserve Station Transformer 1 B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3.
- 1. Provide repeat back of initiating cue.
Evaluator Acknowledge repeat back providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure and review/utilize the correct section.
- 3. Review Attachment 1 Section 1.5 Power Restoration to determine applicable Attachment to Energize Reserve Transformer 1 B
- 6. Determine step 6.2 is N/A
- 7. Determine section 6.3 is applicable NRC JPM 5 o Proper communications used for SaVUnsat repeat back (GAP-OPS-01 )
o N2-SOP-3 obtained. Precautions &
Limitations are reviewed and Section 1.5 referenced.
SaVUnsat a Per step 1.5.2, determines SaUUnsat performance of Attachment 6 is required.
o Verifies 86 device is reset Cue: If asked, inform the candidate that 86-SPRY01 is reset.
Verifies 86 device is reset Cue: If asked, inform the candidate that 86-SPRZO8 is reset.
Sat/Unsat SaVUnsat Marks N/A block for step 6.2 SaVUnsat CI Carries out the actions of section SaVUnsat 3
04/20/05 6.3
I Performance Steps I Standard I
Grade 1
- 8. Close MDS2 - (1 15 KV MOD SWITCH 63)
Places MDS2 control switch to PasslFail o Observes MDS2 red light - ON Sat/Unsat o Observes MDS2 green light - OFF Sat/Unsat LINE 6.
CLOSE
- 9. Close MDS4 - (1 15 KV CIRCUIT o Places MDS4 control switch from PasslFail SWITCHER CKT SWITCH 38).
PULL-TO-LOCK to NORMAL-AFTER-OPEN o Places MDS4 control switch to PasslFail o Observes MDS4 red light - ON Sat/Unsat Observes MDS4 green light - OFF Sat/Unsat The following annunciators clear with no required action:
o 852421 MOT Operator CKT 852435 RES STA SER XFMER 1 B Loss of Voltage CLOSE 2Y U C-M DS4
- 10. IF required, place in Normal-After-Trip o Places 3-1 control switch from PasslFail 2NPS-SWG003-1.
PULL-TO-LOCK to NORMAL-AFTER-TRIP.
o Observes 3-1 green light - ON SaVUnsat
- 11. Return to Attachment 1 Section 1.5.
Per step 1.5.8, determines SaVUnsat performance of Attachment 7 is required.
- 12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed
- 12. Determines section 7.2 is applicable o Carries out the actions of section SaVUnsat 7.2
- 13. Place 3-14 in Pull-to-Lock.
o Places 3-14 control switch in PasslFail Observes 3-14 greedred lights -
Sat/Unsat The following annunciator clears with no required action:
852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC PU LL-TO-LOCK OFF
- 14. Place the SYNC switch to ON o Rotates the SYNC switch to ON PasslFail (SYNCHRONIZE RES STA SVCE XFMR 1 B).
NRC JPM 5 4
04/20/05
Performance Steps I Standard CLOSE o Observes 3-1 red light - ON SaVUnsat Observes 3-1 green light - OFF Sat/Unsat Numerous annuciators clear.
Numerous annunciators alarm.
Numerous annunciators reflash. None of these requires action.
Grade
- 16. Place the SYNC switch to OFF.
- 17. Close 13-6.
Rotates the SYNC switch to OFF PasslFail o Rotates 13-6 control switch from PasslFail PULL-TO-LOCK to NORMAL-AFTER-TRI P.
Observes 13-6 green light - ON SaVUnsat Rotates 13-6 control switch to PasslFail Observes 13-6 red light - ON SaVUnsat Observes 13-6 green light - OFF SaVUnsat The following annunciator clears with no required action:
852527 4KV Bus NNS 013 Undervoltage CLOSE
- 18. Return to Attachment 1 Section 1.5.
- 19. Reports that Reserve Station Transformer 1 B is energized from Line 6, and ZNPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1 B Cue: Acknowledge report.
TERMINATING CUE: Reserve Station Transformer 1 B Powered from Line 6, and NPS-SWG003 &
NPS-SWG013 are energized from Reserve Station Transformer 1 B.
RECORD STOP TIME NRC JPM 5 5
04/20/05
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Initiating cue:
RO-power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.5 Power Restoration.
I (Operators name), Energize Reserve Station Transformer 1 B from Line 6, then restore Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 5 6
04/20/05
Initial Conditions:
- 1. The plant experienced a Loss of Line 6.
- 2. The plant was manually scrammed.
- 3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
- 4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
- 5. Power has been restored to Line 6 and Power Control has verified its reliability.
- 6. Ask the operator for any questions.
Initiating cue:
SRO-(Operators name), Energize Reserve Station Transformer 1 B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWGOI 3 per N2-SOP-3.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 5 7
0412 010 5
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number: 21 29050201 PERFORM TURBINE CONTROL VALVE (CV2 and 3)
CYCLING SURVEILLANCE Revision: NRC 2005 Approvals:
t Y/z (0<
NA EXAMINATION SECURITY Gene fa1 Supervisor Date General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date P e rfo r me r :
(ROERO)
Trainer/Evaluator:
Evaluation Method:
X Perform Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: YES Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 6 1
04/20/05
Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to a full power IC (such as IC-20).
- 2. Malfunction RP02,TRUE F3 Directions to Evaluator:
- 1. Reduce recirc flow to reduce power to 85 % by APRM's
- 2. Set the MAX COMBINED FLOW LIMITER to 7.50.
- 3. This JPM will require an instructor to role-play as a second RO. The second RO will hold the test pushbutton, allowing the candidate to verify indications.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional
/ concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted
- 2. During Evaluated JPM:
- 3. During Training JPM:
by a ".".
Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-OSP-RPS-Q001
- 2. NUREG K/A 212000 A2.03 3 3 3. 5 Tools and Equipment:
- 1. None Task Standard:
Cycle CV3 results in a RPS failure, then insert a manual trip of RPS B2 logic.
NRC JPM 6 2
0412 0105
Initial Conditions:
- 1. The plant is at 85% power.
No equipment is out of service.
- 3. N2-OSP-RPS-Q001 Control Valve Cycling surveillance is in progress.
- 4. Testing for Control Valve CV1 is complete.
- 5. A second RO is available to assist with surveillance performance.
- 6. Ask the operator for any questions.
Initiating cue:
(Operators name), Continue performing Turbine Control Valve Cycling per N2-OSP-RPS-Q001 for CV2 and CV3. The surveillance is in progress and step 8.1.5.1, in preparation for cycling CV2, is the next step to be performed.
- 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary RECORD START TIME
- 2.
- 3.
- 4.
- 5.
Provide candidate with a marked-up working copy of Surveillance Test N2-OSP-RPS-Q001.
Commences test at step 8.1 $5.1 NOTES:
Closing 2MSS-CV2 may cause bypass valve(s) to open to maintain pressure.
Closing 2MSS-CV2 will cause the following annunciators to alarm:
o 6031 04 RPS A TURB CONT VLV FAST CLOSE TRIP J 6031 10 RPS A AUTO TRIP Depress and HOLD, CV-2 TEST pushbutton, (hold depressed until directed to release), when position indicator indicates valve is fully closed (0% indicated), verify following alarms and indications :
o Annunciator 603104 RPS A TURB CONT VLV FAST CLOSE TRIP alarmed.
Proper communications used for repeat back (GAP-OPS-01 )
N2-OSP-RPS-Q001 section 8.0 is referenced Commences test at step 8.1 5.1 Verifies no trips on RPS B trip system.
Informs CRS and/or CSO of expected ann uncia tors Cue: As the CRS/CSO acknowledge the annunciator report.
o Depresses the CV-2 TEST pushbutton on panel 2CEC*PNL842 Cue: Instructor role play to hold the TEST pushbutton allowing the candidate to verify indications.
o Observes 603104 annunciator window is lit.
Sat/ Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat/
NA PasslFail Sat/ Unsat NRC JPM 6 3
04/20/05
- 6.
- 7.
- 8.
Annunciator 6031 10 RPS A AUTO TRIP alarmed.
PILOT SCRAM VALVE SOLENOIDS A,C,E,G indicating lights on 2CEC*PNL603 are OFF.
REACTOR SCRAM TRIP LOGIC AI indicating light on 2CEC*PNL609 is OFF.
RECIRC PUMP TRIP SYSTEM A indicating light C72A-DS7 on 2CEC*PNL609 is OFF, C72A-DS8 on 2CEC*PNL611 becomes brighter.
Process points MSSUCO9 and RPSUC03 are generated.
NOTES:
Opening 2MSS-CV2 will cause the following annunciators to clear:
u 6031 04 RPS A TURB CONT VLV FAST CLOSE TRIP a 6031 10 RPS A AUTO TRIP Release CV-2 Test pushbutton and observe position indicator until valve returns to pre-test position.
At panel 2CEC*PNL603 reset REACTOR SCRAM RESET LOGIC A.
Verify following alarms and indications are in indicated status :
Annunciator 6031 04 RPS A TURB CONT VLV FAST CLOSE TRIP is clear.
Annunciator 6031 10 RPS A AUTO TRIP is cleared.
PILOT SCRAM VALVE SOLENOIDS A,C,E,G indicating lights on 2CEC*PNL603 are ON.
o Observes 6031 10 annunciator window is lit.
o Observes Pilot SCRAM valve solenoids white lights A, C, E & G -
OFF Cue: I f asked, state that the Reactor SCRAM Trip Logic A1 white light Located on P609 is OFF.
Cue: If asked, state that the Recirc Pump Trip System B light C72A-DS7 on P609 is OFF and C72A-DS8 on P611 is BRIGHTER.
Observes computer alarms MSSUCOS and RPSUC03 on the process computer Informs CRS and/or CSO of expected annunciators Cue: As the CRWCSO acknowledge the annunciator report.
u Release CV-2 Test pushbutton o At P603 resets RPS A trip using channel A and C reset switches Observes the following:
0 0
4 Annunciator 6031 04 RPS A TURB CONT VLV FAST CLOSE TRIP is clear.
Annunciator 6031 10 RPS A AUTO TRIP is cleared.
PILOT SCRAM VALVE SOL EN 0 I D S A, C, E, G indicating lights on 2CEC*PNL603 are ON.
Satfunsat Satfunsat Sat/ U nsa t Satfunsat Satfunsat Satfunsat Satfunsat PasslFail Sat/ U nsa t Sat/ U nsa t Satfunsat NRC JPM 6 04/20/05
RECIRC PUMP TRIP SYSTEM A 2CEC*PNL609 is ON, C72A-DS8 on 2CEC*PNL611 return to normal brightness.
indicating light C72A-DS7 on 3
Process points MSSUCO9 and RPSUC03 are reset.
CONSOLE OPERATOR WHEN RPS A is reset enter malfunction RPO2 by depressing F3 Key, to prevent RPS B from tripping when CV3 is tested.
The following section cycles CV3 NOTES:
- 1. Closing 2MSS-CV3 may cause bypass valve(to open to maintain pressure.
- 2. Closing 2MSS-CV3 will cause following annunciators to alarm:
603404 RPS B TURB CONT VLV FAST CLOSE TRIP 603410 RPS B AUTO TRIP
- 9. Verify no trip signals exist in RPS A Trip System.
- 10. Notify CSO of trip to be received in RPS B Trip System.
11 Depress and HOLD, CV-3 TEST pushbutton, (hold depressed until directed to release), when position indicator indicates valve is fully closed (0% indicated), verify following alarms and o RECIRC PUMP TRIP SYSTEM A indicating light C72A-DS7 on 2CEC*PNL609 is ON, C72A-DS8 on 2CEC*PNL611 return to normal brightness.
Cue: If asked, state that the Recirc Pump Trip System B light C72A-DS7 on P609 and C72A-DS8 on P677 have returned to normal brightness.
Process points MSSUCO9 and RPSUC03 are reset.
Observes no red annunciators lit on panel 603.
Notifies the CSO of expected half scram initiation in RPS A Trip System.
Cue:Acknowledge that a half scram will be received.
Depresses the CV-3 TEST pushbutton on panel 2CEC*PNL842.
Cue: Instructor role play to hold the Sat/Unsat Sat/Unsa t Sat/Unsat Sat/Unsat PasslFail NRC JPM 6 5
04/20/05
I Performance Steps
} Standard I
Grade 1
indications :
TEST pushbutton allowing the candidate to verify indications.
u Annunciator 603404 RPS B TURB CONT o Observes 603404 annunciator SaVUnsat VLV FAST CLOSE TRIP alarmed.
window is lit.
c1 Annunciator 603410 RPS B AUTO TRIP Observes 60341 0 annunciator Sat/Unsat alarmed.
window is extinguished.
ZI PILOT SCRAM VALVE SOLENOIDS B, D, Observes Pilot SCRAM valve Sat/ Unsat F, H indicating lights on 2CEC*PNL603 are OFF.
solenoids white lights B, D, F, H -
ON. -
3 REACTOR SCRAM TRIP LOGIC I32 Cue: If asked, state that the Reactor Sat/ Unsat indicating light on 2CEC*PNL611 is OFF.
SCRAM Trip Logic B2 white light Located on P611 is ON The next two items may not be physically checked, since the failure is now identified and transition to N2-SOP-97 is appropriate.
o RECIRC PUMP TRIP SYSTEM B indicating Cue: I f asked, state that the Recirc Sat/Unsat/
light C72A-DS15 on 2CEC*PNL609 is OFF, C72A-DS13 on 2CEC*PNL611 becomes brighter.
P611 is BRIGHTER.
Pump Trip System B light C72A-DS15 on P609 is OFF and C72A-DS13 on NA o Process points MSSUC12 and RPSUC04 o Observes computer alarms Sat/ Unsat/
are generated MSSUC12 and RPSUC04 on the process computer.
NA
- 12. Reports to the SM that RPS B did not trip and/or Cue: As the SM, acknowledge the RPS B, D, F, H white lights are still ON.
report of the failure of RPS B to trip.
Sat/ Unsat
- 13. Obtains a copy of N2-SOP-97 flow chart.
- 14. Stop any half scram isolation testing Cue: If asked, inform the candidate to take the appropriate action.
o References N2-SOP-97 flow chart Sat/ Unsat Notifies the SM to stop half scram or SaffUnsat isolation testing.
NOTE: The candidate may also notify the CRS, or just make the decision that the surveillance test has already been stopped and not inform anyone.
Cue: As the SM, acknowledge the request.
NRC JPM 6 6
04/20/05
- 16. Arm and Depress manual scram switches for the affected channel
- 17. Verify the following indications:
2 PILOT SCRAM SOLENOIDS B, D, F & H indicating lights on 2CEC*PNL603 are OFF REACTOR SCRAM TRIP LOGIC B2 indicating light on 2CEC*PNL611 is OFF
- 18. Reports that RPS B is tripped Determines the cause of the RPS failure is a FAILURE TO TRIP Rotate REACTOR SCRAM B2 collar clockwise to the ARMED position.
Depress REACTOR SCRAM 82 pushbutton.
Observes Pilot SCRAM valve solenoids white lights B, D, F & H -
OFF.
Cue: When asked, state that the Reactor SCRAM Trip Logic B2 white light located on P617 is OFF CUE: Acknowledge the report TERMINATING CUE: Cycle CV3 results in a RPS failure, then insert a manual trip of RPS B2 logic RECORD STOP TIME Sat/Unsat Pass/Fail Pass/Fail Sat/Unsat Sat/Unsat NRC JPM 6 7
04/20/05
Initial Conditions:
I The plant is at 85% power.
L. No equipment is out of service.
- 3. A second RO is available to assist with surveillance performance.
- 4. Ask the operator for any questions.
Initiating cue:
(Operators name), Continue performing Turbine Control Valve Cycling per N2-OSP-RPS-Q001 for CV2 and CV3. The surveillance is in progress and step 8.1 5 1, in preparation for cycling CV2, is the next step to be performed.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 6 8
04/20/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE y 21
Title:
Task Number: 27800401 01 Shift Running Instrument Air Compressors (Faulted) 0.:
NA EXAMINATION SECURITY Revision: NRC 2005 Approvals:
Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(RO/SRO)
Trai ne r/Eval ua tor:
Evaluation Method:
X Perform Simulate Eva I ua t io n Location :
Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: Yes Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 7 1
04/20/05
Recommended Start Location:
Simulator Simulator Set-up:
- 1. Reset to IC20 or equivalent
- 2. Verify A-B-C air compressor line-up
- 3. Enter the following Malfunctions:
IA02A, 21AS-C3A Thermal Overload Trip, TUA = 5 sec o IAOZB, 21AS-C3B Thermal Overload Trip, TUA = 1 min
- 4. Enter the following Instructor Overrides:
P851-1B-21ASAOI-A, Instrument Air Compressor Selector SW, POS-4, TUA = 15 sec ET77 (PI 1/21)
P851-1 B-21ASAOl-A, Instrument Air Compressor Selector SW, POS-3, ET91 (PI 1/21)
ET77 ET77 Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional
/ concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasdFail. All steps are sequenced critical unless denoted by a ".".
Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-OP-19, Section F.2.0
- 3. NUREG K/A 29501 9 AA2.01 3.5/3.6
- 2. N2-SOP-19 Tools and Equipment:
- 1. None Task Standard:
set point.
IAS-C3C is running and IAS header pressure has recovered above alarm NRC JPM 7 2
04/20/05
Initial Conditions:
- 1. The plant is operating at 41 YO power.
- 2. 21AS-C3A is operating but degraded.
- 3. IAS 120VAC remains energized.
- 4. Ask the operator for any questions.
Initiating cue:
RO -
Section SRO- (Operators name), Shift Instrument Air Compressors from A running to B.
(Operators name), Shift Instrument Air Compressors from A running to B running per N2-OP-19 F.2.0.
Performance Steps I Standard I
Grade I
- 1. Provide repeat back of initiating cue.
Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back providing correction if necessary back (GAP-OPS-01)
RECORD START TIME
- 2..Obtain a copy of the reference procedure N2-0P-19 obtained. Precautions &
Sat/ Unsat and reviewhtilize the correct section.
Limitations reviewed and section F.2.0 referenced.
- 3. For the oncoming 21AS -C3B:
Requests an in-plant operator to Sat/ Unsat Verify OFF/OPERATE switch in OPERATE Verify UNLOAD/NORMAL switch in Confirm fault indicator lamps extinguished verify that IAS-C3B is ready to start.
Cue: As an operator at the Air OFF/OPERATE switch is in OPERATE, the UNLOAD/NORMAL switch is in NORMAL, and all fault indicator lights are OFF NORMAL Compressor, report that the
- 4. Slowly open 2CCP-V523 Request that the in-plant operator Sat/Unsat slowly open 2CCP-V523 Cue: As an in-plant operator report that 2CCP-V523 is open
- 5. Select 21AS-C3B as LEAD on Instrument o Rotates Instrument Air Compressor Pass/Fail Air Compressor Selector at P851 Selector Switch to BCA position
- 6. Place 21AS-C3B control switch in Normal-Rotates IAS-C3B control switch to PasslFail Observes IAS-C3B red light - ON Sat/Unsat o Observes IAS-C3B green light - OFF Sat/Unsat o Observes AM-21ASB03 amps - rise Sat/Unsat After Start at P851 START to 280 amps and drop back to 175 amps.
u Releases IAS-C3B to the NORMAL-PasslFail AFTER-START NRC JPM 7 3
04/20/05
[ Performance Steps I Standard I
Grade 1
- 7. IAS-C3A trips on thermal overload
- 8..Reports to the CRS that IAS-3CA has tripped on thermal overload/motor electrical fault
- 9..Obtains and references ARP 851 228 IO..IAS-C3B Trips 1 1..Reports to the CRS that IAS-3CB has tripped on thermal overload/motor electrical fault o Observes Annunciator 851 228, INSTR AIR CPSR 3A/3B/3C AUTO o Observes IAS-C3A green light - ON o Observes IAS-C3A red light - OFF o Observes AM-21ASA03 amps - 0 START/ FAIL TO TRIP - LIT NOTE: Annunciators 851259, INST AIR COMPRESSOR CLG WTR FLOW LOW, and 851260, INST AIR COMPRESSOR COOLING SYS TROUBLE may alarm. These annunciators are of no consequence to the JPM, and the candidates may not responds to them.
Cue: Acknowledge the report of IAS-C3A trip u Enter N2-SOP-19 May dispatch an operator to check the running and tripped air compressor u Rotates and pulls IAS-C3A control switch to PULL-TO-LOCK u Verify the Instrument Air Compressor Selector in the BCA position NOTE: If IAS-C3A control switch is placed in PULL-TO-LOCK prior to the trip of IAS-C3B, annunciator 851228 will alarm.
Observes IAS-C3B green light - ON Observes IAS-C3B red light - OFF
- 12..Obtains and references N2-SOP-19 Cue: Acknowledge the report of IAS-C3B trip
- 13..LOSS of all air compressors due to slow u
transfer or loss of control power?
- 14..Annunciator 851 229, INSTR AIR SYSTEM TROUBLE sounds.
0 0
Determines the air compressors are tripped or degraded Determines that electrical power and control power remain available Recognizes that IAS pressure is less that 90 psig.
Recognizes that IAS-C3C did not automatically start.
Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ U nsa t Sat/Unsat Sat/Unsat Sat/Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat Sat/ Unsat NRC JPM 7 4
04/20/05
I Performance Steps I Standard
]
Grade 1
- 15.
- 16.
17
- 18.
- 19.
.If required stawverify auto started air compressors Select IAS-C3C as the LEAD on the Instrument Air Compressor Selector Switch.
Place 21AS-C3C control switch in Normal-After Start.
Pressure Restored?
Notifies the CRS Instrument Air Compressor C did not start automatically.
Instrument Air Compressor C was manually started and Instrument Air pressure is recovering o Rotates Instrument Air Compressor Selector Switch to the CAB position.
0 o Rotates IAS-C3C control switch to START o Observes IAS-C3C red light - ON Observes IAS-C3C green light -
OFF Observes AM-21ASC03 amps - rise to 280 amps and drop back to 175 amps.
o Releases IAS-C3C to the NORMAL-AFTER-START o Observes 21AS-PI101 pressure indication rising.
Cue: As the CRS, Acknowledge the report PasslFail PasslFail SatlUnsat Sat/ Unsat Sat/U nsat PasslFail SaVUnsat SaVUnsat End of JPM TERMINATING CUE: IAS-C3C is running and IAS header pressure has recovered above alarm setpoint.
RECORD STOP TIME NRC JPM 7 5
04/20/05
Initial Conditions:
- 1. The plant is operating at 41% power.
- 2. 21AS-C3A is operating but degraded.
- 3. IAS 12OVAC remains energized.
- 4. Ask the operator for any questions.
Initiating cue:
RO -
(Operators name), Shift Instrument Air Compressors from A running to B running per N2-OP-19 Section F.2.0.
Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 7 6
04/20/05
Initial Conditions:
- 1. The plant is operating at 41 % power.
- 2. 21AS-C3A is operating but degraded.
- 3. IAS 120VAC remains energized.
- 4. Ask the operator for any questions.
Initiating cue:
SRO- (Operators name), Shift Instrument Air Compressors from A running to B.
Candidate :
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 7 7
04/20/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Manual Initiation of the Control Building Special Filter Train Revision: NRC 2005 Task Number: 28800201 01 2 Approvals:
Operations Training (Designee)
NA EXAMINATION SECURITY Configuration Control Date Pe rfo r me r :
TrainerlEvaluator:
Evaluation Method:
X Perform (ROISRO)
NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
Simulate Evaluation Location:
Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail Alternate Path Task: NO NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Eva1 ua tor Signature:
Date:
NRC JPM 8 1
04/20/05
Recommended Start Location: (Completion time based on the start location)
Simulator Simulator Set-up (if required):
Any IC as long as no LOCA or LOOP exists that will automatically start Control Building Special Filter Train.
Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /
concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a m.
- 2. During Evaluated JPM:
Self-verification shall be demonstrated.
- 3. During Training JPM:
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-OP-53A, Rev 08, Control Building Ventilation System
- 2. NUREG K/A 290003 A4.01 (3.2/3.2), 295038 EA1.07 (3.6/3.8)
Tools and Equipment:
- 1. None Task Standard:
Control Building Special Filter Train A operating in the filtration mode NRC JPM 8 2
04/20/05
Initial Conditions:
- 1. EOP-MSL has been entered.
- 2. Control Building radiation levels are 6E-6 mci/cc and rising
- 3. Ask the candidate if they have any questions.
Initiating Cues:
RO-(Operators name), manually initiate Control Building Special Filter Train A per N2-0P-53A, section H.6.0.
SRO- (Operators name), manually initiate Control Building Special Filter Train A Performance Steps I Standard I
Grade
- 1. Provide repeat back of initiating cue.
Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back providing correction if necessary repeat back (GAP-OPS-01 )
RECORD START TIME
- 2. Obtain a copy of the reference procedure and o N2-OP-53A obtained. Precautions &
limitations reviewed & section H.6.0 review/utilize the correct section of the procedure.
referenced.
- 3. Close HVC*MOVlA, CONTROL ROOM AC o Places HVC*MOVIA control switch in FLT TRAIN BYP VLV at 2CEC*PNL870.
CLOSE.
o Observe HCV*MOVIA green light -
ON Observe HCV*MOVIA red light - OFF
- 4. Close HVC*MOVI B, CONTROL ROOM AC Places HVC*MOVI B control switch in FLT TRAIN BYP VLV at 2CEC*PNL871 CLOSED o Observe HVC*MOVI B green light -
ON Observe HVC*MOVI B red light - OFF
- 5. Start HVC*FN2A, CONTROL ROOM AC u Places and holds HVC*FN2A control switch in START a Observes HVC*FN2A red light - ON o Observes HVC*FN2A green light -
OFF o Returns the HVC*FN2A control switch to NORMAL-AFTER START (release).
BOOSTER FAN at 2CEC*PNL870.
- 6. Observe 2HVC*FR1 OA FILTER TRAIN o Observes 2HVC*FR1 OA FILTER HVC*FLT2A INLET AIR FLOW (red pen) should indicate approximately 63% of full scale (corresponds to approximately 2250 scfm).
TRAIN HVC*FLT2A INLET AIR FLOW (red pen) indicates approximately 63%
of full scale.
- 7. Confirm that Control Room/Atmosphere, d/p is
> +0.125 in WG as read on 2HVC-PD1147, located in the Control Room behind 2CEC-PNL849.
Cue: When operator walks behind Fire Panel 2CEC-PNL849 provide cue that PO1147 indicates +0.2 inches WG.
Sat/ Unsat PasslFail Sat/ Unsat Sat/ Unsat Pass/Fail Sat/Unsat Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat Sat/Unsat Sa t/U nsat Sat/U nsa t NRC JPM 8 3
04/20/05
I Performance Steps I Standard
- 8. Observes the following at 2HVC*PNLCH7A:
Dispatches Auxiliary Operator to verify Sat/Unsat ON INDICATOR red light ON indications locally on 2HVC*PNLCH7A:
LOW AIRFLOW INDICATOR green light OFF OVERTEMPERATU RE I N D ICATOR green light OFF NOTE: May simulate going to the panel instead of sending an Auxiliary Operator Cue: When asked, as the Auxiliary Operator Report:
o ON INDlCATOR red light ON LOW AIRFLOW INDICATOR green light OFF o OVERTEMPERA TURE INDICATOR green light OFF Grade
- 9. Notify Radiation Protection to periodically Cue: Acknowledge the request.
sample the Control Room Atmosphere to ensure proper operation of the Special Filter Train in service.
(Simulate)
- 10. Reports that Control Building Special Filter Train A has been initiated.
Cue: Acknowledge the report.
TERMINATING CUE: Control Room Special Filter Train A initiated.
RECORD STOP TIME NRC JPM 8 4
04/20/05
Initial Conditions:
- 1. EOP-MSL has been entered.
- 2. Control Building radiation levels are 6E-6 mcikc and rising
- 3. Ask the candidate if they have any questions.
Initiating Cues:
RO-53A. section H.6.0.
(Operators name), manually initiate Control Building Special Filter Train A per N2-OP-Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 8 5
04/20/05
I Initial Conditions:
- 1.
EOP-MSL has been entered.
- 2.
- 3.
Control Building radiation levels are 6E-6 mcikc and rising Ask the candidate if they have any questions.
Initiating Cues:
SRO- (Operators name), manually initiate Control Building Special Filter Train A Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
NRC JPM 8 6
04/20/05
Constellation Energy Group OPERATORJOBPERFORMANCEMEASURE
Title:
Vent Control Rod Overpiston Volume Task Number: 2009620501,2009620504 Approvals:
Revision: NRC 2005 NA EXAMINATION SECURITY jate General Supervisor Date Operations Training (Designee)
Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer:
(RO/SRO)
Trainer/Evaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
02-OPS-PJE-200-2-69 NRC JPM 9 1
04/20/05
Recommended Start Location: (Completion time based on the start location)
RP Access Area Simulator Set-up (if required):
None Directions to the Instructor/Evaluator:
Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.
Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /
concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a 0.
Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
No other verification shall be demonstrated.
References:
- 1. N2-EOP-6, Att. 14, Rev. 5, Alternate Rod Insertions, Sections 3.6
- 2. NUREG 1123, WA 295015, AA.1.01 (3.8/3.9)
Tools and Equipment:
EOP box has a breakaway tie-wrap.
Task Standard:
Control Rod 26-59 at notch 00 and 2RDS*V1 shut.
02-OPS-PJE-200-2-69 NRC JPM 9 2
04/20/05
Initial Conditions:
- 1. A scram has occurred.
- 2. Several rods have not fully inserted.
- 3. Communications are established with Control Room.
- 4. An OD-7, Print out of Rod Positions is NOT available.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name) using EOP-6, Attachment 14, insert control rod locally venting its overpiston area.
26-59 to notch 00 by
- 1. Provide repeat back of initiating cue. Evaluator Acknowledge repeat back providing correction if necessary RECORD START TIME
- 2. Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure Cue: When candidate identifies the equipment required to vent the overpiston area, proceed to the HCU. It is NOT required to open the EOP box.
- 3. Locate the correct HCU (26-59).
- 04.
Remove the drain plug from 2RDS*V1, Withdraw Line Vent Valve.
Cue: Simulate cap removal.
- 05. Install quick disconnect adapter.
Cue: Simulate drain adapter connected.
Proper communications used for repeat back (GAP-OPS-01 /Operations Manual)
Open EOP box by removing breakaway tie-wrap and review procedure and enclosures. Reference EOP-6, Att. 14, Section 3.6 Describe and identify the tools necessary to perform the task, but do NOT remove the tools from the EOP Box Physically locate the correct HCU (26-59). Use Figure 14-1, RDS HCU LOCATIONS, as a guide, if required.
AT HCU, use wrench to remove the Withdraw Line Vent Valve drain plug.
At HCU, connect adapter to the correct RDS*Vl by threading in the quick disconnect adapter.
Sat/Unsat Sat/Unsat PasslFail Pass/Fail Pass/Fail 02-OPS-PJE-200-2-69 NRC JPM 9 3
04/20/05
I Performance Steps I Standard
- 06. Connect hose.
At HCU, connect hose to the quick disconnect adapter and route to a drain.
Secure the hose at the drain against PasslFail Cue:
Simulate hose connected and routed. If the whip.
candidate starts to go down the ladder to secure the hose at the drain, tell them another operator has secured the bottom of the hose.
Grade
- 07. Uncap 2RDS*V1 Valve Operator.
Cue:
Simulate cap removed.
At HCU, remove cap from RDS*VI Valve Operator.
Pass/Fail
- 8. Insert rod.
At HCU, slowly open RDS*Vl by inserting PasslFail the T-handled HCU Vent Tool and above piston area.
Cue:
Simulate RDS*Vl opened rotating counter clockwise, venting the and sound of flow noise.
- 9. Report to Control Room.
Report that RDS*Vl is opened. Request Sat/Unsat rod position.
Cue:
Acknowledge report and inform the operator that control rod 26-59 has fully inserted
- 10. Shut RDS*Vl.
At HCU, using the T-handled HCU Vent Tool shut RDS*Vl by rotating the Pass/Fail Cue:
Simulate RDS*Vl shut.
operator clockwise.
- 11. Replace the cap on 2RDS*Vl At HCU, replace the cap on RDS*Vl Sat/Unsat Valve Operator.
Valve Operator.
Cue:
Simulate cap replaced.
02-OPS-PJE-200-2-69 NRC JPM 9 4
04/2 0/0 5
1 Performance Steps I Standard
- 12. Remove high pressure hose from At HCU, disconnect and remove hose.
RDS*VI.
Sat/U nsat Grade NOTE:
At this time the JPM may be stopped.
End of JPM TERMINATING CUE: Control Rod 26-59 at notch 00 and 2RDS*V1 shut.
RECORD STOP TIME 02-OPS-PJ E-200-2-69 NRC JPM 9 5
04/20/05
Initial Conditions:
- 1. A scram has occurred.
- 2. Several rods have not fully inserted.
- 3. Communications are established with Control Room.
- 4. An OD-7, Print out of Rod Positions is NOT available.
- 5. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name) using EOP-6, Attachment 14, insert control rod locally venting its overpiston area.
26-59 to notch 00 by Candidate:
Direct ALL communications and announcements through the JPM Evaluator, first.
02-OPS-PJE-200-2-69 NRC JPM 9 6
0412 010 5
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Align Fire Water System to Inject to RHR A Revision: NRC 2005 Task Number: 2009020504 Approvals:
P 1 - w Mneral Fupervisor Date Operations Training (Designee)
NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
NA EXAMINATION SECURITY Configuration Control Date Performer :
(RO/SRO)
T rai ne r/Eval ua tor:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
02-OPS-PJE-205-2-02 NRC JPM 10 1
04/20/05
Recommended Start Location: (Completion time based on the start location)
RP Access Area Simulator Set-up (if required):
N /A Directions to the Instructor/Evaluator:
Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a e.
0 Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
0 No other verification shall be demonstrated.
References:
04/20/05
Tools and Equipment:
- 1. PL-3 Key
- 2. EOP tool boxes are secured with a breakaway tie-wrap Task Standard:
Fire Water System is aligned to inject to RHR loop A per N2-EOP-6, Attachment 6.
02-OPS-PJE-205-2-02 NRC JPM 10 3
04/20/05
Initial Conditions:
- 1. All high pressure feed to the RPV is lost.
- 2. Alternate injection systems are being lined up.
- 3. Instructor to ask operator for any questions.
Initiating Cues:
(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.
- 1.
Provide repeat back of Proper communications used for repeat Sat/Unsat initiating cue. Evaluator Acknowledge repeat back providing correction if necessary.
back (GAP-OPS-OIlOperations Manual)
RECORD START TIME
- 02. Obtain a copy of the N2-EOP-6, Attachment 6 obtained.
Sa t/U nsa t reference procedure and reviewhtilize the correct section of the procedure.
Section 3.1 referenced.
CUE: Steps 3.1.1, 3.1.2, 3.1.3, 3.1.4 and 3.1.5 are complete.
NOTE: For simulation purposes, actual layout of hosedflanges and connection to pump or plant equipment is not required.
Identification of hose/flange and use along with connection points is all that is required.
- 3.
Verify closed 2RHS*V70, 2RHS*V70, CONDENSATE FLUSH TO Sat/Unsat CONDENSATE FLUSH TO A CONTMT SPRAY HDR.
Cue:
2RHS*V70 is closed A CONTMT SPRAY HDR is rotated in the clockwise direction to verify it is closed. (Rx Sldg EL 289).
02-OPS-PJE-205-2-02 NRC JPM 10 4
04/20/05
- 4.
- 5.
- 6.
7.
- 8.
Close 2CNS-V621, CNS TO 2CNS-V621, CNS TO RHR SUPPLY Pass/Fail RHR SUPPLY ISOL.
Cue: 2CNS-V621 is closed ISOL is rotated in the clockwise direction to verify it is closed. (Rx Bldg, Northside E1289 above 2RHS*MOV24A, LPCl lnje c tion Valve).
Remove test connection blind flange from between valves Blind Flange is properly removed using the tools from the EOP gang box. (Rx PasslFail 2CNS-V621 AND 2RHS*V70.
Bldg EL 289)
Cue: Blind flange is removed Install 2 '/2 inch fire hose adapter to test connection.
Cue: Adapter is installed.
Adapter installed to test connection flange correctly using tools from the EOP gang box.
Pass/Fail Connect male end of 2 '/2 inch Male end of 2 % inch fire hose from EOP PasslFail fire hose from EOP box to box is properly connected to test test connection flange connection flange adapter adapter.
Cue: Male end of 2 % inch fire hose is connected to test connection flange adapter.
Disconnect firehose at FHR 93 Firehose from FHR 93 is properly disconnected using tools from the EOP gang box. (Rx Bldg, EL 289, near North stairwell entrance)
PasslFail Cue: Firehose is disconnected from FHR 93
- 9.
Connect 2 1/2" firehose from Firehose is properly connected to FHR PasslFail test connection f I a n g e adapter to FHR 93.
93 using tools from the EOP gang box.
Cue: Firehose is connected to FHR 93
2FPW-V391 is open is opened by rotating the handwheel in the counterclockwise direction.
02-OPS-PJE-205-2-02 NRC JPM 10 5
04/20/05
I I. Unlock AND open 2RHS*V70 Using the PL-3 Key, unlock AND open PasslFail 2RHS*V70 by rotating the handwheel in the counterclockwise direction.
Cue: 2RHS*V70 is unlocked and open.
- 10. Notify control room that fire water is lined-up to inject via RHR A Sat/Unsat End of JPM TERMINATING CUE: Fire Water System is aligned to inject to RHR loop A per N2-EOP-6,.
RECORD STOP TIME 02-OPS-PJE-205-2-02 NRC JPM 10 6
04/20/05
Initial Conditions:
- 1. All high pressure feed to the RPV is lost.
- 2. Alternate injection systems are being lined up.
- 3. Instructor to ask operator for any questions.
initiating Cues:
(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.
Candidate:
Direct ALL communications and announcements through the JP M Evaluator, first.
02-OPS-PJE-205-2-02 NRC JPM 10 7
04/20/05
Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE
Title:
Task Number:
Local Start of Division I Diesel Generator with Emergency Stop Revision: NRC 2005 Approvals:
4$xdd Date Operations Training (Designee)
NA EXAMINATION SECURITY Configuration Control Date NA EXAMINATION SECURITY General Supervisor Date Operations (Designee)
Performer:
(RO/SRO)
TrainedEvaluator:
Evaluation Method:
Perform X
Simulate Evaluation Location:
X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Start Time:
Stop Time:
Completion Time:
JPM Overall Rating:
Pass Fail Alternate Path Task: Yes NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.
Comments:
Evaluator Signature:
Date:
NRC JPM 1 1 Revised 1
04/20/05
Recommended Start Location :
Control Building Elev. 261 Diesel Generator Rooms L-Simulator Set-up:
Directions to the Instructor/Evaluator:
N/A Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:
Read Before Every JPM Performance:
For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.
Read Before Each Evaluated JPM Performance:
This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.
Read Before Each Traininq JPM Performance:
During this Training JPM, applicable methods of verification are expected to be used.
Therefore, either another individual or I will act as the additional / concurrent verifier.
Notes to Instructor / Evaluator:
- 1.
- 2.
During Evaluated JPM:
- 3.
During Training JPM:
Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a 0.
Self-verification shall be demonstrated.
Self-verification shall be demonstrated.
0 No other verification shall be demonstrated.
References:
- 1. N2-OP-100A Tools and Equipment:
- 1. None Task Standard: Emergency Shutdown of EDG complete.
NRC JPM 11 Revised 2
04/20/05
Initial Conditions:
I. The plant is shutdown for an outage
- 2. Division I Diesel Generator 2EGS*EG1 is in standby
- 3. 2EGS*EGI is to be started to support NNS-SWG16 outage
- 4. N2-OP-1 OOA steps F.5.1 and F.5.2 are complete
- 5. Ask the operator for any questions.
Initiating cue:
(Operators name), locally start the Division I Diesel Generator and return control to P852 for remote loading in accordance with N2-OP-IOOA, section F.5.0.
- 1. Provide repeat back of initiating Proper communications used for repeat Sat/ Unsat cue. Evaluator Acknowledge back (GAP-OPS-01) repeat back providing correction if necessary RECORD START TIME -
- 2..Obtain a copy of the reference a
Obtain copy of N2-OP-1OOA and procedure and reviewhtilize the correct section.
reference section F.5.0.
Sat/ Unsat
- 3. At 2CES*IPNL407, u Confirms Voltage Regulator Switch in Sat/ Unsat GENERATOR CONTROL AUTO.
PANEL, verify Voltage Regulator Switch in AUTO.
- 4. At 2CES*IPNL406 (408),
u SIMULATE: Place CONTROL MODE PasslFail ENGINE CONTROL PANEL, place CONTROL MODE keylock switch in LOCAL AND verify the o Verify the white LOCAL indicating Sat/ Unsat white LOCAL indicating light is illuminated.
keylock switch in LOCAL.
light is illuminated.
CUE: CONTROL MODE switch is in LOCAL AND the white LOCAL indicating light is illuminated.
NRC JPM 11 Revised 3
04/20/05
I Performance Steps I Standard I
Grade
- 5. At 2CEC*PNL852, ELECTRIC CONTROL BOARD, perform the 5_-
following:
3 Verify DIVISION 1 2EGS*EG1 START switch in Normal-After-STOP.
CUE: Report DIVISION 1 2EGS*EG1 START switch in Normal-After-STOP u Verify 2EGS*SWGIOl -N1 NEUTRAL BREAKER 101-N1, closed.
CUE: Report 2EGS*SWGIOl -Nl,
NEUTRAL BREAKER 101-N1, closed o Verify EMERGENCY DSL GEN 1 VOLTAGE REGULATOR MODE SELECT switch in AUTO.
CUE: Report EMERGENCY DSL GEN I VOLTAGE REGULATOR MODE SELECT switch in AUTO
- 6. At 2CEC*PNL852, place EMERGENCY DSL GEN 1 PARALLEL switch to ON.
CUE: Report EMERGENCY DSL GEN 1 PARALLEL switch in ON 7
- 8.
At 2CES*IPNL406, depress ENGINE CONTROL START pushbutton.
CUE: Report sound of engine acceleration heard from engine room.
At 2CES*IPNL407, verify the following Diesel Generator start indications:
0 0
0 0
0 a
Contacts Control Room to direct performance of steps at P852.
Sat/Unsat Directs DIVISION 1 2EGS*EG1 Sat/Unsat START switch verified in Normal-After-STO P.
Directs ZEGS*SWGlOI-Nl, NEUTRAL BREAKER 101 -N1, verified closed.
SaUUnsat Directs EMERGENCY DSL GEN 1 VOLTAGE REGULATOR MODE SELECT switch verified in AUTO.
DirectsEMERGENCY DSL GEN 1 PARALLEL switch to ON.
SIMULATE: Depresses ENGINE CONTROL START pushbutton Sat/Unsat Sat/ Unsat PasslFail NRC JPM 11 Revised 4
04/20/05
12ESI-2EGSA04 ENGINE on 12ESI-2EGSA04 ENGINE SPEED,
-L SPEED. rises to 600 RPM.
rises to 600 RPM.
CUE: Diesel Speed is 600 RPM 3 Generator Voltage as indicated o Confirms Generator Voltage as Sat/ U nsa t on GVM-2EGPA22 VOLTS GENERATOR, rises to 41 60 A-C VOLTS.
VOLTS.
indicated on GVM-2EGPA22 VOLTS GENERATOR, rises to 4160 A-C CUE: Generator Voltage is 41 60 Volts AC Generator Frequency as o Confirms Generator Frequency as indicated on FM-2EGPA22 FREQU E NCY GENERATOR, rises to 60 HERTZ.
indicated on FM-2EGPA22 FREQUENCY GENERATOR, rises to 60 HERTZ.
Sa t/U nsa t CUE: Generator Frequency is 60 Hz LI Generator Field Current as o Confirms Generator Field Current as Sat/ U nsat indicated on GFAM-2EGPA21 AMPS FIELD, indicates about 91 DC AMPERES.
AMPERES.
indicated on GFAM-2EGPA21 AMPS FIELD, indicates about 91 DC CUE: Generator Field Current indicates about 91 DC AMPERES
- 9. At 2CEC*PNL852, observe the o Contacts Control Room to determine, following Diesel Generator start i n d i ca t i o ns :
the following:
SWP*MOV66A, SERVICE WTR o SWP*MOV66A position OUTLET, opens.
3 Diesel Service Water Flow as 0 SWP flow indicated on 2SWP*F176A, SERVICE WTR FLOW, is 1800 GPM.
LI Annunciator 8521 17, EDG 1 o Annunciator 8521 17 status RUNNING, alarms.
CUE: Report SWP*MOV66A is open and flow is 1000 gpm.
Annunciator 852117 is in alarm.
Sat/Unsat SaVUnsat Sat/ Unsat NRC JPM 11 Revised 5
04/20/05
AFTER ENGINE IS STARTED, INITIATED BY EVALUATOR ALTERNATEPATHSTEPSARE ALTERNATE PATH CUE: Inform candidate that there is audible alarm sound at 2C ES*I PN L406.
CUE: WHEN candidate asks for indications of the alarming condition, state that 406-1 -1 and 406-3-3 are alarming.
CUE: WHEN candidate checks LUBE OIL PRESSURE indication report pressure at 15 psig I O. Alarm 406-1 -1 Step 1 directs verify automatic response occurs. Determines engine shutdown should have occurred, but did not. Initiates actions to shutdown the engine.
- 11. Reports conditions to the Control Room.
CUE: IF candidate requests direction, advise the candidate to trip the diesel.
CUE: IF candidate attempts to stop the engine using normal STOP pushbuttons or contacts the control room to stop the engine from P852, report the engine is still running after these methods are attempted.
12
- 13.
Determines Emergency Stop per N2-OP-I00A, H.l.O is required At 2CES*IPNL406 ENGINE CONTROL PANEL, depress EMERGENCY STOP red STOP pushbutton.
Refers to annunciator response 406-3-3 and 406-1-1 and determines engine shutdown with lube oil pressure c 30 psig did not occur.
PasslFail Refers to N2-OP-1 OOA, H.l.O Sat/Unsat Sat/ Unsat NRC JPM 11 Revised 6
04/20/05
CUE: Diesel Generator is NOT stopped
- 14. IF Diesel does NOT stop, perform one of the following:
Depress button AND pull Manual Fuel Control Quadrant Handle down AND hold down UNTIL Diesel Generator comes to a complete stop.
Trip Turbocharger Air Inlet Butterfly Valve closed by pushing Overspeed Governor output arm towards Turbocharger with foot.
Pull out latching rod of Overspeed Trip Valve at Overspeed Governor.
CUE: WHEN candidate performs any one of the emergency stop methods, report that the engine is beginning to coast down.
The JPM is complete.
Shutdown engin of the following:
by performing i y one 0 Depress button AND pull Manual Fuel Pass/Fail/NA Control Quadrant Handle down AND hold down UNTIL Diesel Generator comes to a complete stop.
OR 0 Trip Turbocharger Air Inlet Butterfly Pass/Fail/NA Valve closed by pushing Overspeed Governor output arm towards Turbocharger with foot.
OR Pull out latching rod of Overspeed Trip Valve at Overspeed Governor.
End of JPM TERMINATING CUE: Emergency Shutdown of EDG complete.
RECORD STOP TIME NRC JPM 11 Revised 7
04/20/05
Initial Conditions:
- 1. The plant is shutdown for an outage
- 2. Division I Diesel Generator ZEGS*EGl is in standby
- 3. 2EGS*EG1 is to be started to support NNS-SWG16 outage
- 4. N2-0P-lOOA steps F.5.1 and F.5.2 are complete
- 5. Ask the operator for any questions.
Initiating cue:
(Operators name), locally start the Division I Diesel Generator and return control to P852 for remote loading in accordance with N2-OP-lOOA, section F.5.0.
NRC JPM 11 Revised 8
04/20/05