Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

BVPS Unit 1 Task No.:

001 1-014-01 -01 3 Task

Title:

Raise Reactor Power To 10. Amps JPM No.:

2005 NRC JPM S1 0535-006-04-01 3 WA

Reference:

001 A2.11 (4.414.7) 001 AA1.05 (4,314.2)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testinq Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

A reactor startup is in progress in accordance with 1 OM-50.4.0, Reactor Startup From Mode 3 To Mode 2. The following conditions exist:

All shutdown bank rods are fully withdrawn.

Control Bank D is at 90 steps.

The estimated critical position is 11 0 steps on Control Bank D.

Task Standard:

The reactor is tripped in response to inappropriate continuous control rod motion.

Required Materials:

Estimated Critical Position & 1/M Plot General

References:

1 OM-50.4.D, Reactor Startup From Mode 3 To Mode 2, Rev. 43 1 OM-53C.4.1.1.3, RCCA Control Bank Inappropriate Continuous Movement, Rev. 9 Handouts:

1 OM-50.4.D, Reactor Startup From Mode 3 To Mode 2, Rev. 43 Estimated Critical Position & 1/M Plot Initiating Cue:

The Unit Supervisor directs you to withdraw control rods to criticality in accordance with 10M-50.4.D, Reactor Startup From Mode 3 To Mode 2, beginning at Step IV.D.15.f.

Time Critical Task:

NO Validation Time:

16 minutes BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Job Performance Measure

~ _ _ _ _ _ _

Form ES-C-1 Worksheet Simulator Setup:

Initialize IC-PW = NJPM Select FAST speed on NR-45 BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C

~~~

page 3 of C Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 (Step 1V.D. 15.f)

WHEN the Inverse Count Rate Ratio is less than 0.25, Reduce rod withdrawal intervals to 25 step increments.

Standard:

Candidate initiates rod withdrawal at less than 25 step increments.

CUE:

The ICRR is less than 0.25. Withdraw control rods to take the reactor critical.

Comment :

Performance Step: 2 (Step IV.D.16.a)

Verify both source ranges HV Manual ON/OFF switches are in the NORMAL position.

Standard:

Candidate locates and verifies both source range HV MANUAL CONTROL switches in NORMAL.

Comment :

Performance Step: 3 Record Source Range Neutron Level indications:

(Step IV.D.16.b)

[NI-NI-31 A]

CPS

[ N I - N 1-32 A]

CPS Candidate locates and records SR counts for N31 and N32.

Standard:

Comment:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 4 of 9 PERFORMANCE I NFORMATION Form ES-C-1 Performance Step: 4 (Step IV.D.16.c)

Verify annunciators A4-85 and A4-87 NIS SOURCE RANGE CH l(2) DETECTOR VOLTAGE TROUBLE, are ON.

Standard:

Candidate locates and verifies A4-85 and A4-87 in alarm Com men t :

Performance Step: 5 (Step IV.D.16.d)

Select both IR channels to indicate on recorder NR-45.

Standard:

Candidate locates and places NI SYS RECORDER SEL SW 1 N45 and 2N45 to record IR channels N35 and N36.

Comment:

Performance Step: 6 (Step IV.D.16.e)

BLOCK the source range hi flux trip by placing the Block Source Range Trip Train A and Train B control switches to BLOCK.

Standard:

Comment:

Candidate locates and places BLOCK SOURCE RANGE TRIP TRAIN NTRAIN B control switches in Block.

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 (Step IV.D.16.f)

Standard:

Verify the Source Range High Voltage is de-energized.

Candidate locates and verifies Source Range DETECTOR VOLTS indicate zero.

Com men t :

Performance Step: 8 (Step IV.D.16.g)

Standard:

Verify annunciators A4-85 AND A4-87, NIS SOURCE RANGE CHl(2) DETECTOR VOLTAGE TROUBLE, are OFF.

Candidate locates and verifies A4-85 AND A4-87 not in alarm Com men t :

Performance Step: 9 (Step IV.D.17.a)

If the Source Range High Flux Trip signal is blocked prior to criticality, perform the following: (Otherwise N/A)

Suspend performance of the l/m plot.

Standard:

Candidate directs suspending the l/m plot.

CUE:

The l/m Plot is suspended.

Com men t :

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 6 of 9 PERFORMANCE INFORMATION Form ES-C-1

.(

Performance Step: 10 Continue incremental rod withdrawal (at a rate determined by the SM, but not to exceed 25 step increments) until the reactor is critical as indicated by a stable positive startup rate, with no rod motion, on the intermediate range instrumentation once the prompt jump has receded.

(Step IV.D.17.b)

Standard:

Candidate continues withdrawing control rods to obtain a stable startup rate.

CUE:

If asked, inform Candidate to withdraw rods at no more than 25 step increments to obtain a stable startup rate.

Comment:

I NOTE:

The following step begins the alternate path portion of the JPM.

Performance Step: 11 Determine that rods are withdrawing with NO demand signal.

Standard:

Comment:

Candidate determines from CONTROL BANK D GROUP 1 and GROUP 2 ROD POSITION indication that rods are withdrawing with NO demand signal.

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 7 of 9 PERFORMANCE INFORMATION Form ES-C-1 4

Performance Step: 12 Trip the reactor in response to inappropriate continuous rod motion.

(AOP-1.1.3, Step 1 RNO)

Standard:

Candidate trips the reactor in response to inappropriate continuous rod motion.

NOTE: Candidate may refer to AOP-1.1.3 and determine that a reactor trip is required based on Step 1 RNO.

Comment :

Terminating Cue:

When the Candidate trips the reactor, the evaluation for this JPM is comdete.

STOP TIME:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.:

2005 NRC S1 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Resu It : Sat isf acto ry/Unsat isf acto ry Examiners Signature:

Date:

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Page 9 of 9 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:

A reactor startup is in progress in accordance with 1 OM-50.4.D, Reactor Startup From Mode 3 To Mode 2. The following conditions exist:

All shutdown bank rods are fully withdrawn.

Control Bank D is at 90 steps.

The estimated critical position is 11 0 steps on Control Bank D.

INITIATING CUE:

The Unit Supervisor directs you to withdraw control rods to criticality in accordance with 1 OM-50.4.D, Reactor Startup From Mode 3 To Mode 2, beginning at Step IV.D.15.f.

BVPS-1 NRC JPM S1 NUREG 1021, Revision 9

Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

Task

Title:

WA

Reference:

Examinee:

Facility Evaluator:

Method of testinu:

BVPS Unit 1 Task No.:

0531 -005-05-01 3 Perform SI Termination IAW ES-1.1 E02 EA1.3 (3.8/4.0)

JPM No.:

2005 NRC JPM S2 NRC Examiner:

Date:

Simulated Performance:

Actual Performance:

X Class room Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

. The reactor was tripped and safety injection was actuated due to low RCS pressure.

The crew has entered ES-1.1, SI Termination.

Task Standard:

High head safety injection is aligned to provide flow to the RCS Required Materials:

None General

References:

1 OM-53A.1.ES-1.1, SI Termination, Issue 1 C, Rev. 4 Handouts:

1 OM-53A.1.ES-1.1 SI Termination, Issue 1 C, Rev. 4 Initiating Cue:

The Unit Supervisor directs you to perform the steps to terminate safety injection in accordance with ES-1.1 I SI Termination.

Time Critical Task:

NO Validation Time:

20 minutes BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C

~~~

~~~

Job Performance Measure Form ES-C-1 Worksheet Simulator Setup:

Initialize IC-192 PW = NJPM I BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 3 of 12 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

t Performance Step: 1 Reset SI (Step 1)

Standard:

Standard:

Candidate locates and depresses SI ReseVOverride Train A/Train B pushbuttons.

Candidate verifies Status Light Panel 62-4C is off and 62-4D is on.

Com men t :

Performance Step: 2 Reset CIA and CIB (Step 2)

Standard:

Candidate locates and depresses CIA ReseVOverride Train A/

Train B and CIB Reset Override Train NTrain B switches.

Standard:

Candidate verifies A1 -72, Containment Isolation Phase B clears.

Comment:

Performance Step: 3 Stop All But One Charging Pump (Step 31 Standard:

Candidate locates and places 1 CH-P-1 A or 1 B control switch in stop.

Standard:

Candidate verifies white trip light on and red running light off.

Corn men t :

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 4 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 4 Check RCS Pressure - STABLE OR RISING (Step 4)

Standard:

Candidate locates RCS pressure indication and verifies stable or rising.

Com men t :

Performance Step: 5 (Step 5.a)

Isolate The BIT Close [MOV-1 SI-867A, B]

Standard:

Standard:

Candidate locates MOV-1 SI-867A, B control switches and places in Close.

Candidate verifies green close light on and red open light off for each valve.

Com men t :

Performance Step: 6 (Step 5.b)

Isolate the BIT Close [MOV-1 SI-867C, D]

Standard:

Standard:

Com men t :

BVPS-1 NRC JPM S2 Candidate locates MOV-1 SI-867C, D control switches and places in Close.

Candidate verifies green close light on and red open light off for each valve.

NUREG 1021, Revision 9

Appendix C Page 5 of 12 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 7 (Step 6.a)

Close [FCV-1 CH-1221 Establish Normal Charging Flow Standard:

Candidate locates FCV-1 CH-122 controller and places in Manual and closes valve.

Standard:

Candidate verifies valve controller indicates 100% (Shut)

Com men t :

Performance Step: 8 (Step 6.b)

Open [MOV-1 CH-3101 Establish Normal Charging Flow Standard:

Candidate locates MOV-1 CH-310 control switch and places in open.

Standard:

Candidate verifies red open light on and green close light off.

Com men t :

Performance Step: 9 (Step 6.c)

Open [MOV-1 CH-2891 Standard:

Standard:

Establish Normal Charging Flow Candidate locates MOV-1 CH-289 control switch and places in open.

Candidate verifies red open light on and green close light off.

Comment:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 6 of 12 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 10 (Step 6.d)

Establish Normal Charging Flow Adjust [FCV-1 CH-1221 to maintain required PRZR level Standard:

Candidate locates FCV-1 CH-122 controller and opens valve to re-establish charging flow.

Comment:

Performance Step: 11 Control Charging Flow to Maintain PRZR Level (Step 7 )

Standard:

Candidate observes PRZR level indication and adjusts charging flow, as necessary to maintain PRZR level greater than 18%.

Com men t :

Performance Step: 12 (Step 8.a)

Standard:

Energize Stub Busses Check 41 60V stub busses - ENERGIZED Candidate locates and verifies ACB-1 E5, 1 AE stub bus red closed light on and white trip light off.

Com men t :

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 7 of 12 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 13 (Step 8.a)

Standard:

Energize Stub Busses Check 41 60V stub busses - ENERGIZED Candidate locates and verifies ACB-1 F5, 1 DF stub bus red closed light on and white trip light off.

Comment:

Performance Step: 14 (Step 8. b)

Standard:

Energize Stub Busses Check 480V stub busses - ENERGIZED Candidate locates and verifies either boric acid transfer pumps or containment vacuum pumps indicating lights are lit.

Com men t :

Performance Step: 15 (Step 9.a)

Verify CNMT Instrument Air - AVAILABLE Check Station Instrument Air Header Pressure - GREATER THAN 100 PSlG Standard:

Corn men t :

Candidate locates and verifies PI-1 IA-106 pressure indicates greater than 100 psig.

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 8 of 12 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 16 (Step 9.b)

Standard:

Verify CNMT Instrument Air - AVAILABLE Verify [TV-1 IA-4001 - OPEN Candidate locates TV-1 IA-400 and verifies red open light on and green closed light off.

Com men t :

Performance Step: 17 Verify CNMT Instrument Air - AVAILABLE (Step 9.c)

Standard:

Check CNMT instrument air header pressure - GREATER THAN 85 PSlG Candidate locates and verifies PI-1 IA-l06A indicates greater than 85 psig.

Comment:

Performance Step: 18 (Step 10.a)

Standard:

Standard:

Standard:

Check If LHSl Pumps Should Be Stopped:

LHSl pumps - ANY RUNNING WITH SUCTION ALIGNED TO RWST Candidate locates and verifies 1 SI-P-1 A and 1 B running Candidate verifies red running light on for each pump.

Candidate locates and verifies MOV-1 SI-862NB open Standard:

Candidate verifies red open light on and green closed light off for each valve.

Comment:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 9 of 12 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 19 (Step 10.b)

Check If LHSI Pumps Should Be Stopped:

Stop LHSI pumps and place in AUTO Standard:

Standard:

Candidate locates and places 1 SI-P-1 A and 1 B control switches in Stop.

Candidate verifies white trip light on and red running light off for each pump.

Comment :

Performance Step: 20 (Step 11)

Reset SI Auto Recirc Changeover Standard:

Candidate locates and depresses SIS Auto Recirc Reset Train A/Train B pushbuttons.

Comment:

Performance Step: 21 (Step 12.a)

Verify SI Flow Not Required RCS subcooling based on core exit TCs - GREATER THAN 46°F

[54"F ADVERSE CNMT]

Standard:

Comment :

Candidate locates ICCM display and verifies su bcooling greater than 46°F.

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 10 of 12 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 22 (Step 12.b)

Verify SI Flow Not Required PRZR level - GREATER THAN 18% [37% ADVERSE CNMT]

Standard:

Standard:

Comment :

Candidate locates and verifies PRZR level indicates less than Candidate determines that PRZR level is dropping and refers to RNO column step 12.b.

18%.

NOTE:

The following step begins the alternate path portion of the JPM.

.(

Performance Step: 23 Adjust charging flow to restore PRZR level (Step 12.b RNO)

Standard:

Candidate locates and adjusts FCV-1 CH-122 to restore PRZR level.

Comment :

.(

Performance Step: 24 IF PRZR level can NOT be restored, THEN manually start SI pumps and align valves as necessary.

(Step 12.b RNO)

Standard:

Candidate manually starts SI pumps and aligns valves, as necessary.

NOTE:

Candidate may choose to manually re-initiate SI based on SI Reinitiation Criteria on Foldout Page.

Corn men t :

Terminating Cue:

When the Candidate starts the SI pumps manually or re-initiates SI, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 11 of 12 VERIFICATION OF COMPLETION Form ES-C-1 JPM No.:

2005 NRC S2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Res u It : Sat isf act o ry/U nsat isf acto ry Examiner's Signature:

Date:

BVPS-1 NRC JPM S2 NUREG 1021, Revision 9

Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:.

The reactor was tripped and safety injection was actuated due to low RCS pressure.

The crew has entered ES-1.1, SI Termination.

INITIATING CUE:

BVPS-1 NRC JPM S2 The Unit Supervisor directs you to perform the steps to terminate safety injection in accordance with ES-1.1, SI Termination.

NUREG 1021. Revision 9

Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility :

BVPS Unit 1 Task No.:

01 11 -01 1-01 -01 3 Task

Title:

Isolate SI Accumulators Durina a LOCA JPM No.:

2005 NRC JPM S3 KIA

Reference:

009 EA1.13 (4.4/4.4)

Examinee:

NRC Examiner:

Faci I i t y Eva1 uato r:

Method of testina:

Simulated Performance:

Actual Perf o rm an ce :

X Date:

Class room Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be sat is f ied.

Initial Conditions:

Task Standard:

Required Materials:

General Ref e rences :

Handouts:

Initiating Cue:

Time Critical Task:

Validation Time:

A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.

SI Accumulators A and B are isolated. SI Accumulator C is vented.

Shorting Bars (3) 1 OM-53.A.1.ES-1.2, Post LOCA Cooldown and Depressurization, Issue l C, Rev. 5 1 OM-1 1.4.H, Venting Safety Injection Accumulator [l SI-TK-1 A (1 6) (1 C)]

1 OM-53A.1.ES-1.2, Post LOCA Cooldown and Depressurization, Issue l C, Rev. 5 1 OM-1 1.4.H, Venting Safety Injection Accumulator [l SI-TK-1 A (1 6) (1 C)]

1 OM-53A.1.6-A, 0 F Plus Subcooling Based on Core Exit TCs, Issue 1 C, Rev. 0 The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 25.

NO 12 minutes BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet PW = NJPM BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 3 of 10 PERFORMANCE INFORMATION Form ES-C-1 (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 (Step 25.a)

RCS subcooling based on core exit TCs - GREATER THAN SUBCOOLING LISTED ON ATTACHMENT 6-A Standard:

Candidate locates ICCM display and verifies RCS subcooling based on core exit TCs is greater than subcooling listed on -A.

CUE:

Provide Candidate with a copy of Attachment 6-A.

Comment :

Performance Step: 2 (Step 25.b)

PRZR level - GREATER THAN 18% [37% ADVERSE CNMT]

Standard:

Candidate locates and verifies PRZR level indication is greater than 18%.

Comment:

Performance Step: 3 (Step 25.c)

Power to [MOV-1 SI-865A, B, C] - AVAILABLE.

Standard:

Standard:

Com men t :

Candidate locates and verifies power available to MOV-1 SI-865A, B and C.

Candidate verifies red open light on for each valve.

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 4 of 10 PERFORMANCE INFORMATION Form ES-C-1 4 Performance Step: 4 Insert shorting bars into jacks for [MOV-1 SI-865A, 6, and C]

(Step 25.d)

Standard:

Candidate locates and inserts shorting bars into jacks for MOV-1 SI-865AI 6, and C.

CUE:

Provide Candidate with shorting bars as needed.

Comment:

Performance Step: 5 (Step 25.e)

Close [MOV-lSI-865A, B, C].

Standard:

Standard:

Candidate locates MOV-1 SI-865A and B control switches and places in Close.

Candidate verifies green close light on and red open light off for each valve.

Com men t :

4 Performance Step: 6 Close [MOV-1 SI-865A, B, C].

(Step 25.e)

Standard:

Standard:

Candidate locates MOV-1 SI-86% control switch and places in Close.

Candidate verifies red open light remains on indicating valve NOT closed.

NOTE: Valve is overridden in the Open position.

Com men t :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 5 of 10 PERFORMANCE INFORMATION Form ES-C-1 I

NOTE:

The following step begins the alternate path portion of the JPM.

I Performance Step: 7 (Step 25.e.l RNO)

Verify at least one station air compressor or the diesel air compressor is RUNNING.

Standard:

Candidate locates and verifies 1 SA-C-1 A or 1 B running Standard:

Candidate verifies red running light on for at least one station air compressor.

Com men t :

Performance Step: 8 (Step 25.e.2 RNO)

Standard:

Standard:

Verify [TV-1 IA-4001 OPEN.

Candidate locates and verifies TV-1 IA-400 is open.

Candidate verifies red open light on and green closed light off Comment:

Performance Step: 9 (Step 25.e.3 RNO)

Check CNMT instrument air header pressure - GREATER THAN 85 PSIG.

Standard:

Corn men t :

Candidate locates PI-1 IA-l06A and verifies containment instrument air header pressure indicates greater than 85 psig BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 10 (Step 25.e.4 RNO)

Standard:

Vent any unisolated accumulators to atmospheric pressure.

Refer to 1 OM-l1.4.H, Venting Safety Injection Accumulators Candidate refers to 10M-11.4.H to vent 1 SI-TK-1 C.

[l SI-TK-1 A(B) (C)].

CUE:

Provide Candidate with a copy of 1 OM-1 1.4.H.

Com men t :

Performance Step: 11 (Step IV.l)

Standard:

Standard:

Check [HIC-1 Sl-9361 SI ACC N2 Vent to Atm control, output is adjusted to Zero percent. (BB-A)

Candidate checks HIC-19-936 output is adjusted to zero percent.

Candidate locates and verifies HIC-1 Sl-936 indicates zero percent.

CUE:

If asked, inform Candidate that Radiation Protection does not require a nitrogen gas sample.

Corn men t :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION Performance Step: 12 (Step IV.2.a)

Close [ l Sl-691, Nitrogen Supply to S.I. Accumulators (Aux Bldg, 768 near B.A Batch Tank).

Standard:

Candidate dispatches local operator to direct closing 1 SI-69.

CUE:

Local operator reports that 1SI-69 is closed.

Comment:

Performance Step: 13 (Step IV.2.b)

Standard:

No action required.

If desired by the SWUS, Close [l Sl-4371, Nitrogen Supply to Overpressure Protection System, (CNMT, At 1 C SI ACC-692).

CUE:

As Unit Supervisor, inform Candidate it is NOT desired to close 1 Sl-437.

Comment:

.I Performance Step: 14 Open [MOV-1 SI-853C1, (1 C) SI Acc N2 Sup lsol Vlv. (BB-A)

Candidate locates and opens MOV-1 SI-853C.

Candidate verifies red open light on and green closed light off.

(Step IV.3)

Standard:

Standard:

Com men t :

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Page 8 of 10 PERFORMANCE INFORMATION Form ES-C-1

.(

Performance Step: 15 Open [TV-1 SI-1 01-11, SI Acc N2 Sup lsol Vlv. (BB-A)

Candidate locates and opens TV-1 SI-1 01 -1.

Candidate verifies red open light on and green closed light off (Step IV.4)

Standard:

Standard:

Comment:

Performance Step: 16 (Step IV.5)

Standard:

Standard:

Open [TV-1 SI-1 01 -21, SI Acc N2 Sup lsol Vlv. (BB-A)

Candidate locates and opens TV-1 9 - 1 01 -2.

Candidate verifies red open light on and green closed light off.

Com men t :

.(

Performance Step: 17 (Step iV.6)

Standard:

Standard:

Com men t :

Operate [HIC-1 Sl-9361 (BB-A) to lower accumulator to the desired pressure as indicated on [PI-1 SI-921 & 923 (925 & 927) (929 &

Candidate locates and operates HIC-1 Sl-936 to lower accumulator pressure.

Candidate verifies PI-1 Sl-929 & 931 indicate accumulator pressure is lowering.

931)]. (VB-A)

Terminating Cue:

When the Candidate verifies that accumulator pressure is lowering, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S3 NUREG 1021. Revision 9

-~

Appendix C

~~

Page 9 of 10 VERIFICATION OF COMPLETION Form ES-C-1 JPM No.:

2005 JPM S3 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Result: Satisfactory/Unsatisfactory Examiners Signatu re:

BVPS-1 NRC JPM S3 Date NUREG 1021, Revision 9

Appendix C Page 10 of 10 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:

A LOCA has occurred. The crew is performing ES-1.2, Post LOCA Cooldown and Depressurization.

INITIATING CUE:

The Unit Supervisor directs you to isolate the SI accumulators in accordance with ES-1.2, Post LOCA Cooldown and Depressurization, Step 25.

BVPS-1 NRC JPM S3 NUREG 1021, Revision 9

Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:

BVPS Unit 1 Task No.:

021 1-01 2-01 -01 3 Task

Title:

Initiate Natural Circulation Cooldown JPM No.:

2005 NRC JPM S4 0531 -009-05-01 1 K/A

Reference:

002 A4.02 (4.3/4.5)

EO9 E A l. l (3.U3.5)

Examinee:

Facility Evaluator:

NRC Examiner:

Date:

Method of testina:

Simulated Performance:

Actual Performance:

X Class room Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:...

A reactor trip has occurred and all RCPs were tripped.

The crew has transitioned to ES-0.2, Natural Circulation Cooldown.

The plant is stable with condenser steam dumps in automatic in the steam pressure mode.

Task Standard:

RCS cooldown in progress using residual heat release valve Required Materials:

None General

References:

1 OM-53A.1.ES-0.2, Natural Circulation Cooldown, Issue 1.C, Rev 4 1 OM-53A.1.5-C, CRDM Fans Running - Natural Circulation Cooldown Subcooling Requirements Handouts:

1 OM-53A.1.ES-0.2, Natural Circulation Cooldown, Issue 1.C, Rev 4 lOM-53A.1.5-C, CRDM Fans Running - Natural Circulation Cooldown Subcooling Requirements Initiating Cue:

The Unit Supervisor directs you to initiate an RCS cooldown in accordance with ES-0.2, Natural Circulation Cooldown, beginning at Step 5.

Time Critical Task:

NO Validation Time:

15 minutes BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup:

Initialize IC-1 94 PW = NJPM Setup IPC RCS cold leg temperature trend BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 (Step 5.a)

Standard:

No action required.

Maintain cooldown rate in RCS cold legs - LESS THAN 25"F/HR Com men t :

Performance Step: 2 (Step 5.a.l)

Standard:

Initiate a trend of RCS cold leg temperature and pressure Candidate initiates a trend of RCS cold leg temperature and pressure.

CUE:

Inform Candidate that an IPC trend has been setup to trend RCS temperature and pressure.

Comment:

Performance Step: 3 (Step 5.a.2)

Standard:

Initial every half hour Candidate notes trending frequency requirement.

NOTE:

Inform Candidate that another operator will be responsible for trending and initialing.

Com men t :

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 4 of 9 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 4 (Step 5.a.3)

Standard:

Standard:

Maintain RCS temperature and pressure - WITHIN LIMITS OF ATTACHMENT 5-C IFANY CRDM FAN RUNNING - 0 R - WITHIN LIMITS OF ATTACHMENT 5-B IF NO CRDM FAN RUNNING Candidate locates and verifies at least 1 CRDM fan running Candidate verifies red running light on and white trip light off.

Standard:

Candidate refers to Attachment 5-C for temperature/pressure limits.

CUE:

Provide Candidate with a copy of Attachment 5-C.

Comment:

Performance Step: 5 (Step 5.b)

Standard:

No action required.

Maintain SG narrow range level - BETWEEN 30% - 5090 CUE:

Inform Candidate that another operator will be responsible for controlling SG levels.

Comment:

Performance Step: 6 (Step 5.c.l)

Standard:

Standard:

Check MSlVs - AT LEAST ONE OPEN Candidate locates and verifies at least one MSlV open.

Candidate verifies red open light on and green closed light off.

Comment:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 5 of 9 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 7 (Step 5.c.2)

Check condenser available Standard:

Candidate locates and checks status light C-12, COND AVAIL (Panel 622) is on.

Comment:

4 Performance Step: 8 Place condenser steam dump controller in MANUAL.

(Step 5.c.3)

Standard:

Candidate locates and places AM-1 MS-464B, COOLDOWN VLVS CONTROL in Manual.

Standard:

Candidate verifies red light on Com men t:

Performance Step: 9 (Step 5.c.4)

Verify demand - ZERO Standard:

Comment:

BVPS-1 NRC JPM S4 Candidate locates and verifies AM-1 MS-464B demand indicates zero.

NUREG 1021, Revision 9

Appendix C Page 6 of 9 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 10 (Step 5.c.5)

Standard:

Place steam dumps in STM PRESS Mode.

No action required per JPM Initial Conditions.

Com men t :

Performance Step: 11 (Step 5.c.6)

Check Tavg - GREATER THAN 541 9F Standard:

Candidate locates and checks status light D-1 1, 2/3 Lo-Lo Tavg (Panel 622) is NOT on.

Com men t :

4 Performance Step: 12 Gradually raise steam dump rate (Step 5.c.7)

Standard:

Candidate locates AM-1 MS-4645 controller and depresses raise pushbutton to open steam dump valves.

Standard:

Candidate determines that steam dump valves do NOT open NOTE:

Candidate may attempt to open steam dump valves in AUTO. If so, valves will NOT open.

NOTE:

Steam dump controller is overridden to prevent dump valves from opening.

CUE:

As the Unit Supervisor, acknowledge steam dump failure and direct Candidate to use HCV-1 MS-104 to dump steam.

Comment:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION NOTE:

The followina steD beains the alternate path portion of the JPM.

1

~~

~~

.(

Performance Step: 13 Manually or locally dump steam using:

(Step 5.c RNO)

Standard:

Standard:

SG Atm Dump Vlvs -0R-Residual Heat Release Control Valve Candidate locates HCV-1 MS-104, Residual Heat Release Valve and opens to manually dump steam.

Candidate verifies valve open indication.

CUE:

As the Unit Supervisor, direct the Candidate to use the RHR valve to continue the cooldown.

Com men t :

Terminating Cue:

When the Candidate initiates a cooldown using the RHR valve, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S4 NUREG 1021, Revision 9

Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.:

2005 JPM S4 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature:

BVPS-1 NRC JPM S4 Date:

NUREG 1021, Revision 9

Appendix C Page 9 of 9 Form ES-C-1 JPM CUE SHEET IN IT1 AL CONDITIONS:

. A reactor trip has occurred.

. All RCPs are tripped.

The crew has transitioned to ES-0.2, Natural Circulation Cooldown The plant is stable with condenser steam dumps in automatic in the steam pressure mode.

INITIATING CUE:

BVPS-1 NRC JPM S4 The Unit Supervisor directs you to initiate an RCS cooldown in accordance with ES-0.2, Natural Circulation Cooldown, beginning at Step 5.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:

BVPS Unit 1 Task No.:

001 1-006-01 -01 3 Task

Title:

Manually Actuate CIB JPM No.:

2005 NRC JPM S5 WA

Reference:

026 A3.01 (4.3j4.5) 026 A4.01 (4.34.3)

Examinee:

Facility Evaluator:

NRC Examiner:

Date:

Method of testinqL Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

A reactor trip and safety injection have occurred due to a large break LOCA.

The actions of E-0 are being performed.

Task Standard:

Manually initiate CIB, start 1 QS-P-1 A and stop the RCPs Required Materials:

None General

References:

1 OM-53A.1.1 -K, Verification Of Automatic Actions, Issue 1 C, Rev. 2 1 OM-53A.1.1 -E, Containment Isolation Phase B Checklist, Issue 1 C, Rev. 2 Handouts:

1 OM-53A.1.1 -K, Verification Of Automatic Actions, lssue 1 C, Revision 2 1 OM-53A.1.1 -E, Containment Isolation Phase B Checklist, Issue 1 C, Rev. 2 Initiating Cue:

The Unit Supervisor directs you to perform Attachment 1 -K, Verification Of Automatic Actions, Step 8 to check CIB and Containment Spray status.

Time Critical Task:

NO Validation Time:

10 minutes BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup:

Initialize IC-195 PW = NJPM BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 (Step 8)

Check CIB and Containment Spray Status Containment pressure - HAS REMAINED LESS THAN 8 PSlG Standard:

Standard:

Candidate locates PI-1 LM-1 OOA and 1 OOB, Containment Pressure Indicators, or PR-1 LM-1 OOA, Containment Pressure Recorder.

Candidate determines that containment pressure has NOT remained less than 8 psig.

NOTE:

Containment pressure is > 8 psig.

Com men t :

I NOTE:

The followinq step beqins the alternate path portion of the JPM.

I Performance Step: 2 (Step 8.a RNO)

Verify CIB initiated:

Check BLUE CIB marks - LIT Standard:

Comment :

Candidate checks components properly aligned and determines CIB components not positioned as required and CIB NOT actuated.

BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 4

Performance Step: 3 Verify CIB initiated:

(Step 8.a RNO)

IF NOT, THEN manually initiate CIB (both pushbuttons for both trains). Check BLUE CIB marks - LIT Standard:

Standard:

Candidate locates and depresses both pushbuttons for Train A CIB.

Candidate locates and depresses both pushbuttons for Train B CIB.

NOTE:

Candidate may actuate either train first followed by the opposite train.

Corn men t :

4 Performance Step: 4 Verify CIB initiated:

(Step 8.a RNO)

IF CIB actuated, THEN manually align equipment. If necessary, refer to Attachment 1 -E, Containment Isolation Phase B Checklist.

NOTE:

If requested, provide Candidate with a copy of -E.

Standard:

Standard:

Standard:

Standard:

Standard:

Candidate checks all indicating lights with BLUE CIB marks LIT.

Candidate identifies 1 QS-P-1 A, Quench Spray Pump failed to start.

Candidate locates 1 QS-P-1A control switch and places in Start.

Candidate verifies red running light on and white trip light off.

Candidate locates and verifies discharge pressure and motor amps for each pump.

NOTE:

Candidate should recognize time delays for 1-RS-P1 A and 1 -RS-P2A, Recirc Spray Pumps following CIB actuation.

Corn men t :

BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 4 Performance Step: 5 Verify CIB initiated:

(Step 8.b RNO)

Standard:

Stop all RCPs.

Candidate determines that all RCPs are running Standard:

Standard:

Candidate locates and places control switches for 1 RC-P-1 A, 1 B and 1C in Stop.

Candidate verifies white trip light on and red running light off for each pump.

NOTE:

Candidate may choose to place control switches in Pull-To-Lock after stopping pumps.

Comment:

Performance Step: 6 (Step 8.c RNO)

Request BV-2 operator verify CREVS equipment actuation Standard:

Candidate contacts Unit 2 to verify proper CREVS equipment operation.

CUE:

Inform Candidate as Unit 2 Operator that all CREVS equipment is functioning properly.

Comment:

Terminating Cue:

When the Candidate stops the RCPs, the evaluation for this JPM is corn p let e.

STOP TIME:

BVPS-1 NRC JPM S5 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.:

Examinee's Name:

Examiner's Name:

Date Performed:

2005 JPM S5 Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: SatisfactoqdUnsatisfactory Examiner's Signature:

BVPS-1 NRC JPM S5 Date:

NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

A reactor trip and safety injection have occurred due to a large break LOCA.

The actions of E-0 are being performed.

INITIATING CUE:

BVPS-1 NRC JPM S5 The Unit Supervisor directs you to perform Attachment 1 -K, Verification Of Automatic Actions, Step 8 to check CIB and Containment Spray status.

NUREG 1021. Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:

Task

Title:

BVPS Unit 1 Task No.:

0362-005-06-01 3 Svnchronize and Load EDG No. 2 JPM No.:

2005 NRC JPM S6 WA

Reference:

064 A4.06 (3.913.9)

Examinee:

NRC Examiner:

Facility Evaluator:

Date:

Method of testinq Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is operating at power. 1 OST-36.2, Diesel Generator No. 2 Monthly Test is in progress.

Task Standard:

No. 2 diesel generator synchronized and running at minimum load Required Materials:

None General

References:

1 OST-36.2, Diesel Generator No. 2 Monthly Test, Rev 43 Handouts:

1 OST-36.2, Diesel Generator No. 2 Monthly Test, Rev 43 Initiating Cue:

The Unit Supervisor directs you to synchronize and load Diesel Generator No. 2 in accordance with 1 OST-36.2, Diesel Generator No. 2 Monthly Test, Steps 27 - 31. All of the preceding procedure steps have been completed.

Time Critical Task:

NO Validation Time:

12 minutes BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet I Simulator Setup:

Initialize IC-PW = NJPM BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

.I Performance Step: 1 Position the No. 2 Diesel Generator Synchroscope Selector Switch to the 1 F9 position to compare the diesel generator frequency to the frequency on bus 1 DF. (Generator Section of the Benchboard)

(Step V.27)

Standard:

Standard:

Candidate locates and places EMERG GEN 2 SYNCHRONIZING SELECTOR SW in the 1 F9 position.

Candidate locates and compares diesel generator frequency to bus 1 DF frequency.

Comment:

Performance Step: 2 (Step V.27.a)

Standard:

Verify A9-16, ACB 1 F7 OR 1 F9 IN SYNCHRONIZING MODE alarms when the Synchroscope Selector Switch is moved from the OFF position.

Candidate verifies A9-16 in alarm.

Com men t :

4 Performance Step: 3 Using the No. 2 diesel Generator Governor Control Switch, adjust generator speed until the synchroscope needle is rotating very slowly in the FAST direction. (Generator Section of the Benchboard)

(Step V.28)

Standard:

Standard:

Candidate locates and adjusts EMERG GEN 2 GOVERNOR control switch.

Candidate verifies synchroscope needle is rotating slowly in the fast d i rection.

Com men t :

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 4 ot7 PERFORMANCE INFORMATION

~

~~~

~

Form ES-C-1 d

Performance Step: 4 Using the No. 2 Diesel Generator Voltage control Switch, match (Step V.29)

Standard:

Standard:

generator voltage (Incoming) with the voltage on bus 1 DF (Running).

Candidate locates and adjusts EMERG GEN 2 VOLT ADJUST control switch to match voltages.

Candidate verifies incoming and running voltages indicate approximately 120 - 122 volts.

Comment :

d Performance Step: 5 Close the Motor Operated Ground Switch by positioning the No 2 Diesel Generator Motor Operated Ground Switch control to CLOSE. (Generator Section of the Benchboard).

(Step V.30)

Standard:

Candidate locates and closes EMERG GEN 2 MOTOR OPERATED GND SW DS2.

Standard:

Candidate verifies red close light on and green open light off.

Comment:

Performance Step: 6 (Step V.30.a)

Standard:

Verify that ANN. A9-10, DIESEL GENERATOR NO. 2 M.O.

GROUND SWITCH NOT FULLY OPEN is ON.

Candidate verifies A9-10 in alarm.

Comment:

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 5 of 7 PERFORMANCE INFORMATION Form ES-C-1 d

Performance Step: 7 When both synchronizing lights are completely dark AND the synchroscope needle is at the 12 oclock position, place the No.

2 Diesel Generator Breaker control to CLOSE. (Red light)

(Generator Section of the Benchboard)

(Step V.31)

Standard:

Candidate locates and places EMERG GEN 2 CIRCUIT BREAKER ACB 1 E9 in Close at 12 oclock position.

Standard:

Candidate verifies red close light on and green open light off.

Comment :

4 Performance Step: 8 Pick up a small amount of load by moving the No. 2 Diesel Generator Governor Control Switch, intermittently, to the RAISE position.

(Step V.31.a)

Standard:

Standard:

Candidate locates EMERG GEN 2 GOVERNOR control switch and places in the Raise position.

Candidate verifies EMERG GEN 2 WATTS indicates increasing load.

Com men t :

Performance Step: 9 (Step V.31.b)

Turn synchroscope selector switch to OFF.

Standard:

Candidate locates and places EMERG GEN 2 SYNCHRONIZING SELECTOR SW in Off.

Com men t :

Terminating Cue:

When the Candidate turns the synchroscope selector switch off, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION JPM No.:

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

2005 JPM S6

Response

Result: Satisfactory/Unsatisfactory Examiners Signature:

Date:

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Page 7 of 7 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:

The plant is operating at power. 1 OST-36.2, Diesel Generator No. 2 Monthly Test is in progress.

INITIATING CUE:

The Unit Supervisor directs you to synchronize and load Diesel Generator No. 2 in accordance with 1 OST-36.2, Diesel Generator No. 2 Monthly Test, Steps 27 - 31. All of the preceding procedure steps have been completed.

BVPS-1 NRC JPM S6 NUREG 1021, Revision 9

Appendix C Job Performance Measure Worksheet Form ES-C-1 Faci I i t y :

BVPS Unit 1 Task No.:

0021 -004-01 -01 3 Task

Title:

Remove Power Ranae Instrument From JPM No.:

2005 NRC JPM S7 Service WA

Reference:

01 5 A3.03 (3.9j3.9) 015 A4.03 (3.8j3.9)

Examinee:

Facility Evaluator:

Method of testinq:

Simulated Performance:

Classroom Simulator NRC Examiner:

Date:

Actual Performance :

X X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

The plant is operating at power.

All systems are normal with the exception of one Power Range Nuclear Instrument which has failed.

The required actions to stabilize the plant have been taken. Reactor, turbine power and T A v ~

are stable. TAVG is within one degree of TREF.

Control Rods are in Manual.

Task Standard:

The failed nuclear channel is bypassed in accordance with AOP-1.2.1 C.

Required Materials:

None General

References:

1 OM-53C.4.1.2.1 C, Power Range Channel Malfunction, Issue 3A, Rev. 7 Handouts:

1 OM-53C.4.1.2.1 C, Power Range Channel Malfunction, Issue 3A, Rev. 7 Initiating Cue:

The Unit Supervisor directs you to bypass the failed power range channel using AOP-1.2.1 C and report when complete.

Time Critical Task:

NO Validation Time:

10 Minutes BVPS-1 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Simulator Setup:

Initialize IC-182 PW = NJPM IMF NIS03A 0 BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 Check If Malfunction Of One Power Range Channel (N-41, N-42, N-43, N-44) Has Occurred.

(Step 1)

Standard:

Standard:

Candidate locates and determines that 2NMP-N141 B and/or NIS Rack N41, drawer A indicates channel has failed.

Candidate verifies that no other power range channel has failed.

NOTE:

Power Range channels read as follows:

N-41: 0%

N-42: 4ay0 N-43: 48%

N-44: 48%

Com men t :

Performance Step: 2 (Step 1.b.l)

Standard:

No action required.

E Power Range Channel 4 (N-44) fails, THEN perform the following:

Place Control Rod Group Selector switch in MAN.

NOTE:

Candidate may choose to verify that Control Rod Group Selector switch is in Manual.

Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 4 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 3 (Step l.b.2)

E Power Range Channel 4 (N-44) fails, THEN perform the following:

Place [2FWS*FCV479,489,499], 21 A (6) (C) SG Feedwater Bypass Control Vlvs in MANUAL.

Standard:

No action required.

NOTE:

Candidate may choose to verify that 2FWS"FCV479,489,499 are in Manual.

Com men t :

4 Performance Step: 4 At NIS Rack N50, "Detector Current Comparator," turn Rod Stop Bypass Switch to BYPASS on the failed channel.

(Step 1.c)

Standard:

Candidate locates and places rod stop bypass switch in Bypass PR N-41 position.

Comment:

Performance Step: 5 (Step 1.c.l)

Standard:

Verify appropriate Status Light, "Overpwr Rod Stop Bypass" (Status Light Panel 308, A-14, 8-14, C-14, 0-14) - LIT FOR FALED CHANNEL Candidate locates and verifies A-14 status light on Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 6 (Step 1.d)

Check reactor power - GREATER THAN 50%

Standard:

Candidate locates and verifies reactor power indicates less than 50%.

Com men t :

4 Performance Step: 7 At NIS Rack N37/N46, Comparator and Rate, turn Comparator Channel Defeat Switch to failed channel.

(Step 1 Standard:

Candidate locates and places comparator channel defeat switch in N41 position.

Com men t :

Performance Step: 8 Ensure vertical board recorders are selected to monitor only operable detectors.

(Step 1.g>

Standard:

Candidate locates and places NIS RECORDER SELECTOR UPPER 1 N45 or LOWER 2N45 in N42, N43, or N44 position NOTE:

Normally, only 1 recorder is set to monitor power range indication.

Comment:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 6 of 8 PERFORMANCE INFORMATION Form ES-C-1 Performance Step: 9 Report task complete to the Unit Supervisor.

Standard:

Candidate reports Power Range Channel N-41 is bypassed NOTE:

As Unit Supervisor, acknowledge report that channel is bypassed.

Comment:

Terminating Cue:

When the Candidate selects an operable recorder to the detector, the evaluation for this JPM is complete.

STOP TIME:

BVPS-2 NRC JPM S7 NUREG 1021, Revision 9

Appendix C Page 7 of 8 VERIFICATION OF COMPLETION Form ES-C-1 JPM No.

2005 JPM S7 Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiners Sign atu re:

BVPS-2 NRC JPM S7 Date:

NUREG 1021, Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

. The plant is operating at power.

. All systems are normal with the exception of one Power Range Nuclear Instrument which has failed.

The required actions to stabilize the plant have been taken.

Reactor, turbine power and TAVG are stable. TAVG is within one degree of TRE~.

Control Rods are in Manual.

INITIATING CUE:

BVPS-1 NRC JPM S7 The Unit Supervisor directs you to bypass the failed power range channel using AOP-1.2.1 C and report when complete.

NUREG 1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility:

BVPS Unit 1 Task No.: 0071 -025-01 -01 3 Task

Title:

Perform Manual MakeuD to the VCT WA

Reference:

004A4.01 (3.813.9) 004A4.04 (3.213.6)

JPM No.:

2005 NRC JPM S8 004A4.07 (3.913.7)

NRC Examiner:

Date:

Examinee:

Facility Evaluator:

Method of testina:

Simulated Performance:

X Actual Performance:

Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

w The plant is at 100% power.

. Core burnup is 500 MWDIMTU.

RCS boron concentration is 1550 ppm.

The inservice Boric Acid Tank concentration is 7380 ppm w

VCT level is 24%.

Task Standard:

Makeup flow initiated at 100 gpm through the blender.

Required Materials:

CB-29 General

References:

1 OM-7.4.P, Blender Manual Makeup Operation, Rev. 5 Handouts:

1 OM-7.4.P, Blender Manual Makeup Operation, Rev. 5 Initiating Cue:

The Unit Supervisor directs you to raise VCT level to 40% at 100 gpm by performing a manual makeup in accordance with 1 OM-7.4.P, Blender Manual Makeup Operation. All Initial Conditions are met. The addition is to be batched, therefore the total volume change does not need to be calculated.

Time Critical Task:

No Validation Time:

13 minutes BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 2 of 10 Form ES-C-1 2005 NRC S8 PERFORMANCE INFORMATION Simulator Setup:

Initialize IC-10 PW = NJPM Ramp ACVCVCTW, 7000,20,0 to set VCT level to 24%

Update blender setpoint to 1550 ppm.

Update inservice BAT placard to 7380 ppm.

Do not enter setpoint data.

Reset Boric Acid and Total Flow Totalizers to ZERO.

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 3 of 10 Form ES-C-1 2005 NRC S8 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 (Step IV.A.1)

Chemists sample.

Standard:

Obtain the existing RCS boron concentration obtained from No action required per JPM Initial Conditions.

CUE:

If asked, inform Candidate that current RCS boron is 1550 ppm.

Com men t :

Performance Step: 2 (Step IV.A.2)

If the plant is operating at power, Obtain the B-10 Correction Factor from Curve Book 29, Otherwise Contact Reactor Engineering to obtain a B-10 Correction Factor.

Standard:

Candidate locates and determines a correction factor from CB-29 of 0.977.

CUE:

Provide Candidate with a copy of CB-29 (attached).

Comment:

Performance Step: 3 (Step IV.A.3)

Daily Journal.

Standard:

Calculate Corrected Boron Concentration AND record in the Candidate calculates a corrected boron concentration of 151 4 ppm. 1550 x 0.977 = 151 4 CUE:

If asked, inform the Candidate that another operator will make the Daily Journal log entry.

Comment:

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 4 of 10 Form ES-C-1 2005 NRC S8 PERFORMANCE INFORMATION Performance Step: 4 (Step IV.A.4)

Standard:

Obtain the inservice Boric Acid Tank boron concentration obtained from Chemists sample.

No action required per JPM Initial Conditions.

CUE:

If asked, inform Candidate that current BAT boron is 7380 ppm.

Comment:

Performance Step: 5 (Step IV.A.5)

Standard:

Determine the desired boric acid flow controller setpoint as follows AND record in the Daily Journal.

Candidate calculates the required boric acid flow as:

1514pprn X 100gpm 7380

= 20.Sgpni CUE:

If asked, inform the Candidate that another operator will make the Daily Journal log entry.

Com men t :

4 Performance Step: 6 Place 1 MU to STOP for greater than 1 second to allow the Candidate locates and places 1 MU switch in Stop for greater than 1 second.

Candidate verifies makeup control green light is on.

(Step IV.A.6) blender to unarm.

Standard:

Standard:

Com men t :

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 5 Of 10 Form ES-C-1 2005 NRC S8 PERFORMANCE INFORMATION 4 Performance Step: 7 Adjust Boric Acid to Blender FCV [FCV-1 CH-113AI controller (BB-A) to the calculated desired boric acid flow setpoint.

(Step IV.A.7)

Standard:

Candidate locates and sets FCV-1 CH-113 for the desired flow:

20.5 gpm x 25 units/gpm = 51 3 units k 2 units Comment:

4 Performance Step: 8 Set [YIC-1 CH-1131, Boric Acid Integrator, for desire quantity Reset [YIC-1 CH-1131, Boric Acid Integrator Candidate locates and sets YIC-1 CH-113 to the desired value.

(Step IV.A.8.a)

(B B -A).

Standard:

NOTE: Batch amounts are at the operators discretion.

Total volume change is approximately 225 gallons including approximately 46 gallons of boric acid.

Corn men t :

Performance Step: 9 (Step IV.A.9)

Adjust Primary Water to Blender FCV [FCV-1 CH-l14A] controller (BB-A) to the desired blender total flow.

Standard:

Candidate locates and sets FCV-1 CH-114A for the desired total flow setpoint: 100 gpm = 625 units.

Com men t :

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 6 of 10 Form ES-C-1 2005 NRC S8 PERFORMANCE INFORMATION 4 Performance Step: 10 Set [YIC-1 CH-168A1, Blender Output Integrator, for desired Reset [YIC-1 CH-l68A], Blender Output Integrator Candidate locates and sets YIC-1 CH-168A to the desired value.

(Step IV.A.1O.a) quantity (BB-A).

Standard:

NOTE: Batch amounts are at the operators discretion.

Total volume change is approximately 225 gallons.

Com men t :

Performance Step: 11 (Step IV.A.11)

Log the flow totalizer indication and add to it the number of gallons set into the batch integrator for [YIC-1 CH-1131, Boric Acid Integrator AND [YIC-1 CH-l68A], Blender Output Integrator.

Standard:

Candidate sums the totalizer and integrator values, then records the summed values.

Comment:

Performance Step: 12 (Step IV.A.12)

Prior to the start of AND at least once every hour during a reduction in the RCS boron concentration: (Tech. Spec. 4.1.1.3, 4.9.8.1.b) (N/A if raising or maintaining RCS boron concentration)

No action required. Step is N/A Standard:

Com men t :

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 7 of 10 Form ES-C-1 2005 NRC S8 PERFORMANCE I N FO RMATlO N Performance Step: 13 (Step IV.A.13)

Standard:

If in Mode 4, 5 or 6, align PG water to the blender by unlocking and opening either of the following valves: (Blender Room)

No action required. Plant is in Mode 1.

Com men t :

4 Performance Step: 14 Place 43/MU to MAN. (66-A)

(Step IV.A.14)

Standard:

Candidate locates and places 43/MU switch in Manual.

Com men t :

4 Performance Step: 15 Place 1 MU to START. (BB-A)

(Step IV.A.15)

Standard:

Candidate locates and places 1 MU switch in Start.

Standard:

Comment:

Candidate verifies makeup control red light is on and inservice boric acid pump Fast light is on.

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 8 of 10 Form ES-C-1 2005 NRC S8 PERFORMANCE INFORMATION 4

Performance Step: 16 Place Blender Outlet to Chg Pumps FCV [FCV-1 CH-11361 control switch to OPEN. (BB-A)

Candidate locates and places FCV-1 CH-1136 switch in open.

(Step IV.A.16)

Standard:

Standard:

Candidate verifies red open light is on and green closed light is off.

Com men t :

Performance Step: 17 Standard:

Verify boric acid to Blender flow on [FR-1 CH-1131, Boric Acid Candidate locates and verifies FR-1 CH-113 indicates boric acid flow.

(Step IV.A.16.a)

Flow. (VB-A)

Comment:

Performance Step: 18 Standard:

Verify PG Water to Blender flow on [FR-1 CH-1131, Boric Acid Candidate locates and verifies FR-1 CH-113 indicates PG water flow.

(Step IV.A.16.b)

Flow. (VB-A)

Comment:

Terminating Cue:

When the Candidate verifies flow to the blender, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 9 of 10 Form ES-C-1 2005 NRC S8 VERIFICATION OF COMPLETION JPM No.:

2005 NRC S8 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's Signature:

Date:

BVPS-1 NRC JPM S8 NUREG 1021, Revision 9

Appendix C Page 10 of 10 Form ES-C-1 2005 NRC S8 JPM CUE SHEET INITIAL CONDITIONS:

. The plant is at 100% power.

Core burnup is 500 MWDIMTU.

RCS boron concentration is 1550 ppm.

The inservice Boric Acid Tank concentration is 7380 ppm VCT level is 24%.

INITIATING CUE:

BVPS-1 NRC JPM S8 The Unit Supervisor directs you to raise VCT level to 40% at 100 gpm by performing a manual makeup in accordance with 1 OM-7.4.P, Blender Manual Makeup Operation. All Initial Conditions are met. The addition is to be batched, therefore the total volume change does not need to be calculated.

NUREG 1021. Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Faci I i t y :

BVPS Unit 1 Task No.: 0461 -01 2-01 -01 2 Task

Title:

Locallv StartuD a Containment Hvdroaen JPM No.:

2005 NRC JPM P1 Analvzer W A

Reference:

028 Al.01 (3.4/3.8) 028 A4.01 (4.014.0)

Examinee:

Facility Evaluator:

NRC Examiner:

Date:

Method of testinq Simulated Performance:

X Actual Performance:

Classroom Simulator Plant X

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

Gene ral Ref e rences :

Handouts:

Initiating Cue:

Time Critical Task:

Validation Time:

A reactor trip and safety injection occurred 10 minutes ago due to a LOCA. A wide range hydrogen analyzer is to be placed in service. The 120VAC and 125VDC electrical distribution systems are operable.

The containment hydrogen analyzer is in sewice and a containment hydrogen concentration is calculated.

Fluke Thermometer (Simulated) 1 OM-46.4.G, Placing Wide Range Containment Hydrogen Monitoring System in Operation, Rev. 3 1 OM-46.4.G, Placing Wide Range Containment Hydrogen Monitoring System in Operation, Rev. 3 The Unit Supervisor directs you to place the Train B wide range hydrogen analyzer in service and obtain a containment hydrogen sample using 1 OM-46.4.G. Steps 1 - 3 of the procedure are complete.

Report your results when completed.

Yes 15 minutes BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 2 of 8 Form ES-C-1 2005 NRC P1 PERFORMANCE INFORMATION (Denote Critical Steps with a check mark)

START TIME:

Performance Step: 1 (Step IV.A.4.a)

Standard:

Com men t:

Performance Step: 2 (Step IV.A.4.b)

Standard:

Open [PNL-H2-101 B,], Wide Range Hydrogen Analyzer cabinet Candidate locates [PNL-H2-101 B] and opens the cabinet door.

(Service Building West Wall 71 3)

Verify the STANDBY/OFF switch in the STANDBY position.

Candidate locates and verifies or places the STANDBY/OFF switch is in STANDBY.

CUE: The STANDBYIOFF switch is in STANDBY.

Comment:

4 Performance Step: 3 Place the ON/OFF switch in the ON position.

Candidate locates and places the ON/OFF switch in ON (Step IV.A.4.c)

Standard:

CUE: The ONlOFF switch is in ON.

NOTE: If the ON/OFF Switch is not placed to ON within 25 minutes, then the UFSAR assumption has not been met and the JPM is UNSAT.

Comment :

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 3 of 8 Form ES-C-1 2005 NRC P1 PERFORMANCE INFORMATION Performance Step: 4 (Step IV.A.4.d)

Standard:

Verify the amber STANDBY indicator is On.

Candidate locates and verifies the STANDBY indicator is ON.

CUE:

STANDBY indicator is On.

Comment:

Performance Step: 5 (Step IV.A.4.e.l)

Standard:

Verify the following:

Blue READY indicator is On.

Candidate locates and verifies the Blue READY indicator is On.

CUE:

Blue READY indicator is On.

Comment :

Performance Step: 6 (Step IV.A.4.e.2)

Standard:

Verify the following:

Green ON indicator is On.

Candidate locates and verifies Green indicator is On CUE:

Green ON indicator is On.

Comment :

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 4 of 8 Form ES-C-1 2005 NRC P1 PERFORMANCE INFORMATION Performance Step: 7 (Step IV.A.4.f. 1 - 9)

Standard:

Standard:

Standard:

Standard:

Standard:

Standard:

Standard:

Standard:

Standard:

Within four minutes after the green ON indicator comes On, Verify the following:

0 CUE:

H2 indicator is OFF.

0 Yellow CAUTION indicator is OFF.

CUE:

CAUTION indicator is OFF.

0 CUE:

HI indicator is OFF.

0 Green SAFE indicator is ON.

CUE:

SAFE indicator is ON.

0 CUE:

Meter reading is 1.6%.

0 CUE:

0 CUE: FLOW ALARM indicator is OFF.

0 CUE:

0 CUE:

Red H2 indicator is OFF.

Red HI indicator is OFF.

Percent hydrogen meter is <1 YO (dependent on plant conditions).

PRESS ALARM indicator is OFF.

PRESS ALARM indicator is OFF.

FLOW ALARM indicator is OFF.

TEMP ALARM indicator is OFF.

TEMP ALARM indicator is OFF.

SYSTEM STATUS ALARM is OFF.

SYSTEM STATUS ALARM is OFF.

Comment :

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 5 of 8 Form ES-C-1 2005 NRC P1 PERFORMANCE INFORMATION Performance Step: 8 (Step IV.B.l.a)

Standard:

Obtain local temperature of the applicable Cable Vault (735')

using a calibrated Fluke Thermometer (or equivalent).

Candidate obtains local temperature of the Cable Vault (735')

CUE:

4 minutes have elapsed. (Refer to Note prior to step IV.B.l)

CUE: The Cable Vault temperature is 87°F (simulated reading from Fluke Thermometer).

Com men t :

Performance Step: 9 (Step IV.B.1.b)

Standard:

Candidate observes hydrogen concentration.

Observe the indicated hydrogen concentration CUE:

Hydrogen concentration is 1.6%.

Com me n t :

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 6 of 8 Form ES-C-1 2005 NRC P1 PERFORMANCE INFORMATION

.\\,

Performance Step: 10 Subtract the appropriate correction factor as determined from Candidate calculates actual hydrogen concentration by subtracting the correction factor found on Figure 1 from the indicated hydrogen concentration.

(Step IV.B.1.c)

Figure 1.

Standard:

CUE:

Containment pressure is 10 psia.

Standard:

Candidate reports hydrogen concentration is 1 % (+/- 0.2%)

NOTE: 1.6% - 0.6% = 1.0%

(Indicated - Correction = Actual)

Com men t :

Terminating Cue:

When the Candidate reports the hydrogen concentration, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM P1 NUREG 1021, Revision 9

Appendix C Page 7 of 8 Form ES-C-1 2005 NRC P1 VERIFICATION OF COMPLETION JPM No.:

Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

2005 NRC P1

Response

Result, Satisfactory/Unsatisfactory Examiner's Signature:

BVPS-1 NRC JPM P1 Date:

NUREG 1021, Revision 9

Appendix C Page 8 of 8 Form ES-C-1 2005 NRC P1 JPM CUE SHEET INITIAL CONDITIONS:

A reactor trip and safety injection occurred 10 minutes ago due to a LOCA. A wide range hydrogen analyzer is to be placed in service. The 120VAC and 125VDC electrical distribution systems are operable.

INITIATING CUE:

BVPS-1 NRC JPM P1 The Unit Supervisor directs you to place the Train B wide range hydrogen analyzer in service and obtain a containment hydrogen sample using 1 OM-46.4.G. Steps 1 - 3 of the procedure are complete. Report your results when completed.

NUREG 1021, Revision 9

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 Facility:

BVPS UNIT 1 Task No: 0241 -024-01 -043 Task

Title:

Reset TDAFW PumD TriD Throttle Valve JPM No: 2005 NRC JPM P2 WA

Reference:

061 A2.04 (3.413.8) 2.1.30 (3.9/3.4)

Examinee:

NRC Examiner:

N/A Facility Evaluator:

Date:

Method of Testina:

Simulated Performance:

X Actual Performance Classroom:

Simu Iator:

Plant:

X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When YOU complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Handouts:

Initiating Cue:

Time Critical Task:

Validation Time:

The Unit is at 50% power.

1 FW-P-2, Steam Driven Auxiliary Feedwater Pump has tripped on overspeed. The Turbine Bldg. Operator has verified that the trip throttle valve is closed and no start signals exist for the pump.

TV-1 MS-105A and TV-1 MS-105B are closed. MOV-1 MS-105 is open.

TDAFW pump trip throttle valve is reset IAW 1 OM-24.4.V.

None 1 OM-24.4.V, [l FW-P-21 Trip Throttle Valve Resetting, Rev. 4 1 OM-24.4.V, [l FW-P-21 Trip Throttle Valve Resetting, Rev. 4 The Unit Supervisor directs you to reset the Turbine Driven AFW Pump trip throttle valve in accordance with 1 OM-24.4.V.

NO 15 minutes BVPS-1 NRC JPM P2 NUREG-1021. Revision 9

Appendix C Page 2 of 7 JOB PERFORMANCE MEASURE Form ES-C-1 2005 NRC P2

~

(Denote Critical Steps with a check mark)

START TIME:

Performance Stem 1 Close or Verifv Closed [TV-1 MS-l05A], Turb Steam Sup A Trn (Step IV.A.1.a)

Standard:

Comments:

Trip Vlv.

No action required. (Valve is closed per the Initial Conditions.)

Performance Step: 2 Standard:

Close or Verify Closed [TV-1 MS-l05B], Turb Steam Sup B Tm Trip No action required per the JPM Initial Conditions.

(Step IV.A.1.b)

Vlv.

Comments:

Performance Step: 3 (Step IV.A.l.c)

Standard:

Open or Verify Open [MOV-1 MS-1051, AFW Turb Steam Is01 Vlv.

No action required per the JPM Initial Conditions.

Comments:

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 3 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 4 Performance Step: 4 Press the Manual Emergency Trip Lever to verify that the Overspeed Trip Mechanism is tripped.

(Step 1V.A. 2)

Standard:

Candidate locates the trip mechanism and indicates it is in the tripped position.

CUE: The overspeed trip mechanism is tripped.

Comments:

Evaluator Note:

Figure 1 depicts the overspeed trip device mechanism and may be referred to by the Candidate to assist in explaining the actions in the following steps.

Performance Step: 5 (Step IV.A.3)

Verify that [l MS-4651, 1 FW-T-2 Inlet Stm IsoI, is unlatched.

Standard:

Candidate indicates that the valve is unlatched.

CUE: 1 MS-465 is unlatched.

Com men ts:

4 Performance Step: 6 Turn [l MS-4651, 1 FW-T-2 Inlet Stm Isol, handwheel in the clockwise direction until the sliding nut and trip lever rise to the upper limit of travel.

(Step IV.A.4)

Standard:

Candidate simulates turning 1 MS-465 in the clockwise direction until the sliding nut and trip lever reach the upper limit.

CUE: The sliding nut and trip lever are at their upper limit.

Comments:

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2

.( Performance Step: 7 Reset the Overspeed Trip Mechanism by performing the following:

Candidate simulates the following steps to reset the trip mechanism:

(Step IV.A.5)

Standard:

Hold the overspeed trip connecting rod to the left.

Verify the overspeed tappet washer flat side directly faces the overspeed trip lever.

Release the connecting rod and allow the spring tension to maintain the reset condition.

Verify the flat side of the washer is flush against the vertical side of the overspeed trip lever.

. Verify the trip lever is engaged with the trip hook CUE: The overspeed trip mechanism is reset.

Comments:

.( Performance Step: 8 Slowly Open [l MS-4651, 1 FW-T-2 Inlet Stm Isol, by turning the Candidate simulates turning the handwheel counterclockwise.

CUE: 1MS-465 is open.

(Step IV.A.6) handwheel counterclockwise.

Standard:

Com men ts :

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P2 Performance Step: 9 (Step IV.A.6)

Standard:

Verify that the pump does NOT accelerate in an uncontrolled manner.

Candidate indicates that the pump is not accelerating uncontrollably.

NOTE:

The Candidate may explain that the pump will accelerate due to residual steam pressure in the steam supply line when 1 MS-465 is opened.

Comments:

Performance Step: 10 (Step IV.A.7)

Standard:

WHEN Open, THEN adjust [l MS-4651, 1 FW-T-2 Inlet Stm Isol, 114 turn off of the backseat.

Candidate simulates turning 1 MS-465 until 1/4 of a turn off the backseat.

CUE: 1MS-465 is 1/4 of a turn off its backseat.

NOTE:

If requested, inform the Candidate that another Operator will perform a concurrent verification of the valve position.

Comments:

Performance Step: 11 (Step IV.A.8)

Standard:

Notify the Unit 1 Control Room Operator that [l FW-P-21, Steam Driven Auxiliary Feedwater Pump, is available.

Candidate informs the Control Room of the pump status.

CUE: As Control Room Operator, acknowledge report that the TD AFW pump is available.

Com men ts:

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Terminating Cue:

When the Candidate notifies the Control Room that 1 FW-P-2 is available, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM P2 NUREG-1021, Revision 9

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2005 NRC P2 JPM No.:

2005 NRC P2 Examinee's Name:

Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result: Satisfactory/Unsatisfactory Examiner's signature:

BVPS-1 NRC JPM P2 NUREG-1021. Revision 9

Appendix C Page 7 of 7 Form ES-C-1 JPM CUE SHEET 2005 NRC P2 INITIAL CONDITIONS:

The Unit is at 50% power.

1 FW-P-2, Steam Driven Auxiliary Feedwater Pump has tripped on overspeed. The Turbine Bldg. Operator has verified that the trip throttle valve is closed and no start signals exist for the pump.

TV-1 MS-105A and TV-1 MS-105B are closed. MOV-1 MS-105 is open.

INITIATING CUE:

BVPS-1 NRC JPM P2 The Unit Supervisor directs you to reset the Turbine Driven AFW Pump trip throttle valve in accordance with 1 OM-24.4.V.

NUREG-1021, Revision 9

Appendix C JOB PERFORMANCE MEASURE Form ES-C-1 Facility:

BVPS Unit 1 Task No: 0361 -01 9-01 -01 3 Task

Title:

BV-1 Actions To Establish Station Blackout Cross-tie to Unit 2 JPM No: 2005 NRC JPM P3 WA

Reference:

055 EA1.06 (4. U4.5) 055 EA2.03 (3.914.7) 055 G2.1.30 (3.913.4)

Examinee:

NRC Examiner:

Facility Evaluator:

N/A Date:

Method of Testina:

Simulated Performance:

X Actual Performance:

Classroom:

Simulator:

Plant:

X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When vou comDlete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Task Standard:

Required Materials:

General

References:

Handouts:

Tools:

Initiating Cue:

Time Critical Task:

A tornado strike has caused a partial loss of the switchyard. Unit 2 is without normal and emergency AC power. The Unit 2 Control Room has requested Unit 1 to establish a station blackout cross-tie from 4KV Bus 1 DF.

Station cross-tie has been established in accordance with EOP Attachment A-1.14.

Cubicle Pictures 1 OM-53A.1.A-1.14, BV-1 Actions To Establish Station Blackout Cross-tie To BV-2, Issue 1 C, Rev. 2 1 OM-53A.1.A-1.14, BV-1 Actions To Establish Station Blackout Cross-tie To BV-2, Issue 1 C, Rev. 2 Racking Tool and Gear (Simulated)

Key No. 30 (Simulated)

The Unit Supervisor directs you to perform EOP Attachment A-1.14, Steps 11 and 12 to establish a station blackout cross-tie to Unit 2.

NO Validation Time:

20 minutes BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 2 of 9 Form ES-C-1 JOB PERFORMANCE MEASURE 2005 NRC P3 (Denote Critical Steps with a check mark)

START TIME:

NOTE:

Remind Candidate to simulate all actions and NOT to reach inside any switchgear or relay panel cabinets.

Relay Panels and Bus UV cubicles are NOT to be opened. Provide Candidates with a picture of cabinet internals as appropriate.

NOTE:

.( Performance Step: 1 To Defeat Diesel Generator Trips, perform the following:

Open Knife Switch 3-771 (Loss of Field) on left inside [PNL-REL-211, (Relay Room)

Candidate locates Relay Room Panel 21 [PNL-REL-211 (Step 11.a)

Standard:

Standard:

Candidate locates and opens Knife Switch 3-771 (Loss of Field).

CUE: Knife Switch 3-771 is open.

NOTE:

Refer to attached picture.

Com men ts :

4 Performance Step: 2 To Defeat Diesel Generator Trips, perform the following:

Open Knife Switch 2-688 (Rev Pwr) on left inside [PNL-REL-221, (Relay Room)

Candidate locates Relay Room Panel 22 [PNL-REL-221.

Candidate locates and opens Knife Switch 2-688 (Reverse Power).

CUE: Knife Switch 2-688 is open.

NOTE:

Refer to attached picture.

(Step 11.a)

Standard:

Standard:

Comments:

BVPS-1 NRC JPM P3 NUREG-1021! Revision 9

Appendix C Page 3 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 d Performance Step: 3 To defeat 4KV emergency bus undervoltage trip, open 125 VDC control breaker in Cubicle F8A (1 DF bus).

Candidate locates 4KV Bus 1 DF, Cubicle F8A.

Candidate locates and opens 125VDC control power breaker.

CUE: 125VDC control power breaker is open.

(Step 11.b)

Standard:

Standard:

Comments:

d Performance Step: 4 To defeat 480V emergency bus undervoltage trip, open 125 VDC circuit breaker Bus U/V DC (1 P bus)

Candidate locates 480V Bus 1 P.

Candidate locates and opens 125 VDC circuit breaker Bus UIV DC CUE: 125VDC circuit breaker is open.

(Step 11.c)

Standard:

Standard:

Comments:

d Performance Step 5:

Open [ACB-1 D3] 480V Substation 1-2 Bus 1 D And 480V Substation 1-4 Bus 1 H Breaker.

Candidate locates and opens ACB-1 D3 using the control switch.

CUE: ACB-1 D3 is open.

(Step 12.a)

Standard:

Com men ts:

~

~~

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 4 of 9 PERFORMANCE INFORMATION Form ES-C-1 2005 NRC P3 Performance Step: 6 (Step 12.b)

Standard:

Open [ACB-1 D13], Air Conditioning Chilled Water Unit [ l VS-E-3CI.

Candidate locates and opens ACB-1 D13 using the control switch or local pushbutton.

CUE: ACB-1013 is open.

Comments:

NOTE:

Prior to racking in breaker, Candidate may verbalize donning flash suit and 4KV switching gloves. Candidate may open ACB-1 A8 cubicle door to demonstrate actions to be taken or provide the Candidate with a 4KV breaker diagram (attached).

.( Performance Step: 7 With Key 30, [1 D5] SBO Bkr, remove padlock from [ACB-1 DEI], Unit 1 To Bus 1 D Cross-tie.

(Step 12.c.l)

Standard:

Candidate obtains Key No. 30.

CUE: Use of the key is simulated.

Candidate locates ACB-1 D5 and removes padlock using Key 30 Standard:

CUE: Padlock is removed.

Comments:

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2005 NRC P3 4 Performance Step: 8 Verify DC Control Power - OFF (Step 12.c.2)

Standard:

Candidate locates and opens DC control power breaker.

CUE: Control power breaker is off.

Com men ts :

d Performance Step: 9 (Step 12.c.3, 4 & 5)

Standard:

Standard:

Standard:

Verify charging springs are discharged by pulling the manual close lever.

Candidate locates and then holds down the manual trip button.

Candidate locates and pulls the manual close lever.

Candidate releases the manual trip button.

CUE: Charging springs are discharged.

Comments:

Performance Step: 10 (Step 12.c.6)

Standard:

Verify that the breaker mechanical indicator is in the OPEN position.

Candidate locates and verifies the mechanical flag indicates open CUE: Mechanical flag is in the open position.

Comments:

BVPS-1 NRC JPM P3 NUREG-1021. Revision 9

Appendix C Page 6 of 9 PERFORMANCE IN FORMATION Form ES-C-1 2005 NRC P3

.( Performance Step: 11 Rack the breaker to the CONNECT position.

(Step 12.c.7)

Standard:

Candidate turns the lock release lever to the left, inserts racking tool and turns clockwise until reaching the connect position.

CUE: Breaker is in the connect position.

Comments:

Performance Step: 12 (Step 12.c.8)

Verify charging spring motor disconnect toggle switch - ON Standard:

Candidate locates and verifies the charging spring motor disconnect switch is on.

CUE: Charging spring motor disconnect switch is on.

Comments:

4 Performance Step: 13 Close DC control power breaker.

(Step 12.c.9)

Standard:

Candidate locates and closes the DC control power breaker CUE: DC control power breaker is closed and the closing springs are charged.

Comments:

BVPS-1 NRC JPM P3 NUREG-1021~

Revision 9

Appendix C Page 7 of 9 PERFORMANCE INFORMATION Form ES-C-1 2005 NRC P3 t Performance Step: 14 Manually close [ACB-1 D5], Unit 2 To Bus 1 D Cross-tie using Candidate locates and closes ACB-1 D5 using the control switch Candidate verifies red light is on.

CUE: Breaker is closed.

NOTE: Ensure the breaker door is shut and fastened.

(Step 12.c.10) breaker control switch.

Standard:

Standard:

Com men ts:

Terminating Cue:

When the Candidate completes the actions to close breaker ACB-1 D5, the evaluation for this JPM is complete.

STOP TIME:

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 8 of 9 PERFORMANCE INFORMATION Form ES-C-1 2005 NRC P3 JPM No.:

Examinee's Name:

2005 NRC P3 Examiner's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

~~

Result: Satisfactory/Unsatisfactory Examiner's signature:

Date:

BVPS-1 NRC JPM P3 NUREG-1021, Revision 9

Appendix C Page 9 of 9 JPM CUE SHEET Form ES-C-1 INITIAL CONDITIONS:

A tornado strike has caused a partial loss of the switchyard Unit 2 is without normal and emergency AC power. The Unit 2 Control Room has requested Unit 1 to establish a station blackout cross-tie from 4KV Bus 1 DF.

INITIATING CUE:

BVPS-1 NRC JPM P3 The Unit Supervisor directs you to perform EOP Attachment A-1.14, Steps 11 and 12 to establish a station blackout cross-tie to Unit 2.

NUREG-1021 Revision 9