Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-1 Task

Title:

Perform an RCS Dilution Task Number: 00401401 01 WA

Reference:

004 A4.12 (3.8,3.3)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

.I Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1.
2.

The unit is in Mode 3 with preparations in progress for a reactor startup this shift.

Chemistry has reported current boron concentration as 870 ppm. Per an ECP prepared by Reactor Engineering, boron concentration must be adjusted to 850 ppm before rod withdrawal begins.

NOTE: Any boron concentration values can be used for this JPM by adjusting the values in the JPM IAW the REM Figures. Ensure that sufficient latitude exists for interpolation between exponential curves when determining critical tasks.

Task Standard:

Reduce RCS boron concentration by the specified amount through dilution IAW plant procedures.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

NRC H-1 Page 1 of 9 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Required Materials:

None General

References:

1.

S2.OP.SO.CVC-0006, Boron Concentration Control

2.

S2.RE.RA.ZZ-0012, cFigures Applicability:

EO RO 4

SRO 4

Initiating Cue:

The unit is in Mode 3 with preparations in progress for a reactor startup this shift.

Time Critical Task:

No Validation Time:

15 minutes Simulator Setup:

1.
2.

Any HSB IC with Tavg approx. 547 O F.

CVCS Makeup Control Mode Select in AUTO with boron flow setpoint at approximately 7 gpm and primary water flow setpoint at approximately 70 gpm.

NRC H-1 Page 2 of 9 NUREG-1021, Revision 9

Appendix C Job Performance Measure FOXTI ES-C-1 EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

STEE NO.

1 -

2 NRC H-1 STEP

(* = Critical Step)

(# = Sequential Step)

Operator obtains S2.0P-S0.CVC-0006 DEPRESS the Makeup Control Mode Select STOP PB.

ENSURE following valves in AUTO:

2CV179, PRI WTR FLOW 2CV181,MAKEUP FLOWPATH (2CV185, MAKEUP FLOWPATH) 2CV172, BORIC ACID FLOW OBTAIN Primary Water Flow setpoint for desired dilution rate from REM, Fig. 102.

STANDARD NOTE: Category I1 procedure use requirements apply Presses the STOP pushbutton, STOP PB light illuminates (2CV185, MAKEUP FLOWPATH only if ALT DIL is used)

Verifies AUTO light illuminated for listed valves CUE: Accomplish the dilution over the next 30 minutes period I

Page 3 of 9 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEI NO, 5 -

6 7

STEP

(* = Critical Step)

(# = Sequential Step)

ADJUST 2CV179 setpoint to value obtained in previous step.

DETERMINE amount of Primary Water required for dilution fiom REM, Fig. 101 Set Primary Water Flow Register to number of gallons as follows:

DEPRESS LIMIT 1 keypad IF desired value is not displayed, THEN DEPRESS CLR keypad and enter desired value DEPRESSENT keypad STANDARD Adjusts 2CV179 setpoint to 45-67gpm (calculation is 49 gpm)

Determines 1400-2000 gals. required (calculation is 1472)

Sets Primary Water Flow Register to 1400-2000 gals EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-1 Page 4 of 9 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

8 9

10 STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE at least one Primary Water Pump in AUTO DEPRESS Makeup Control Mode Select DILUTE PB (or ALT DIL if chosen)

DEPRESS Makeup Control Mode Select START PB STANDARD Verifies one PW Pump AUTO light is illuminated.

DILUTE PB illuminated (or ALT DIL if chosen)

START PB illuminated EVAL s/u COMMENTS (Req'd for UNSAT Evaluation) 8 NRC H-1 Page 5 of 9 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

11 -

12 STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE following actions occur:

2CV172 CLOSES PW Pump selected to AUTO, STARTS 2CV181 OPENS (2CV185 OPENS) 0 2CV179 MODULATES to setpoint flow Primary Water Flow Register indicates desired flow IFVCTlevel increases to 78%,

THEN ENSURE letdown diverts to CVCS HUT When the dilution is complete, DEPRESS Makeup Control Mode Select STOP PB STANDARD (2CV185, MAKEUP FLOWPATH only if ALT DIL is used)

Verifies proper response CUE: Assume the Primary Water Flow Register has reached the setpoint STOP PB illuminated EVAL s/u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-1 Page 6 of 9 NUREG-102 1, Revision 9

Appendix C Job Perfonnance Measure Form ES-C-1 Worksheet STEI NO.

13 STEP

(* = Critical Step)

(# = Sequential Step)

EVAL s/u ENSURE following actions occur:

PW Pump selected for AUTO, STOPS.

2CV181 CLOSES (2CV185 CLOSES) 2CV179 CLOSES COMMENTS (Reqd for UNSAT Evaluation)

STANDARD (2CV185, MAKEUP FLOWPATH only if ALT DIL is used)

Verifies the green light illuminates for the PW Pump in AUTO and 2CV181, 2CV185 and 2CV179 CLOSE I

I NRC H-1 Page 7 of 9 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-1 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-1 Page 8 of 9 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET INITIAL CONDITIONS:

0 The unit is in Mode 3 with preparations in progress for a reactor startup this shift.

0 Chemistry has reported current boron concentration as' 870 ppm. Per an ECP prepared by Reactor Engineering, boron concentration must be adjusted to 850 ppm before rod withdrawal begins.

INITIATING CUE:

You are the RO. Perform the necessary calculations and adjust RCS boron concentration to 850 ppm over a 30 minutes period.

NRC H-1 Page 9 of 9 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-2 Task

Title:

Take Corrective Action For High Activity In The Reactor Coolant Task Number: 1140270401 WA

Reference:

004 A2.09 (3.0,3.9)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

.I Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1.
2.

The unit is at 100% power.

An alarm has actuated on 2RP1 Radiation Alarm Annunciator Panel.

Task Standard:

Shift charging pumps and increase letdown flow rate LAW plant procedures.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None General

References:

1.

S2.0P-AR.ZZ-O015(Q), 2RP1 Radiation Alarm NRC H-2 Page 1 of20 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1

2.
3.
4.

Worksheet S2.OP-AB.R4D-OOOl(Q), Abnormal Radiation S2.0P-AB.RC-O002(Q), High Activity in Reactor Coolant System S2.0P-SO.CVC.O002(Q), Charging Pump Operation (5.6) ita-ility :

EO RO 4

SRO 4

Initiating Cue:

You are the RO and are directed to respond to the alarm.

Time Critical Task:

No Validation Time:

15 minutes Simulator Setup:

1.
2.

Any full power steady state IC.

Place 23 CCP in service, with 21 and 22 CCPs in standby. Align letdown flow through 45 gpm orifice.

NRC H-2 Page 2 of 20 m

G 102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP

(* = Critical Step)

(# = Sequential Step)

DETERMINE the affected channel by observing indicators, annunciators on 2RP 1, RMS Computer, and the Annunciator CRT.

IF -

the alarming Monitor is

valid, AB.RAD-OOOl(Q), Abnormal Radiation.

THEN GO TO S2.0P-STANDARD

~

Checks 2RP1, RMS computer, and annunciator CRT. Observes RADIATION ALARM PROCESS in alarm on 2 W 1. Determines that 2R3 1, Letdown Line Failed Fuel monitor in high alarm.

Refers to S2.OP-AB.RAD-0001.

EVAL s / u -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-2 Page 3 of 20 NUREG-102 1, Revision 9

Amendix C Job Performance Measure Form ES-C-1 Worksheet STEI NO.

3 -

STEP

(* = Critical Step)

(# = Sequential Step)

Is the alarm, warning, or rising indication valid?

(EVALUATE the following):

Chemistry Sampling Rising activity on related Radiation Monitors Maintenance activities in vicinity of radiation detector Transfer of radioactive resins or other materials in affected area No indication of failure or fault on affected Radiation Monitor Radioactive release from Salem or Hope Creek

~

STANDARD Observes increased activity on containment area radiation monitors.

NOTE: May ask Chemistry for RCS activity sample.

EVAL S I U -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-2 Page 4 of 20 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEI NO.

4 -

5 6

NRC H-2 STEP

(* = Critical Step)

(# = Sequential Step)

ANNOUNCE the following on Plant PA system:

Affected Radiation Monitor Location of Radiation number and name Monitor area with elevated indication NOTIFY OSKRS to REFER to Event Classification Guide, ODCM and Technical Specifications.

INITIATE the applicable attachment for affected Radiation Monitor.

STANDARD Makes PA announcement that Unit 2 Letdown Line Failed Fuel radiation monitor 2R3 1 is in high alarm.

~

~~

Notifies CRS.

CUE: CRS acknowledges communication.

Initiates Attachment 1 for 2R3 1 monitor alarm.

Page 5 of 20

~

EVAL s/u COMMENTS (Reqd for UNSAT Evaluation)

NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 STEl NO.

7 -

8 NRC H-2 STEP

(* = Critical Step)

(# = Sequential Step)

IF 2R3 1, Letdown Line-Failed Fuel, is the affected monitor, THEN GO TO S2.0P-AB.RC-O002(Q), High Activity in the Reactor Coolant.

INITIATE Attachment 1, Continuous Action Summary.

STANDARD Refers to S2.OP-AB.RC-O002(Q),

High Activity in the Reactor Coolant.

Refers to Attachment 1.

EVAL s/u COMMENTS (Reqd for UNSAT Evaluation)

Page 6 of 20 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEl NO.

9 -

STEP

(* = Critical Step)

(# = Sequential Step)

IF AT ANY TIME, Reactor Coolant activity is rising, approaching OR exceeded Technical Specification limits OR as directed by Station Management, THEN as applicable:

0 REDUCE Reactor Power IAW Power Operation, to attempt to establish equilibrium.

COMMENCE Power Reduction IAW S2.0P-AELLOAD-0001 (Q), Rapid Load Reduction AND COOLDOWN plant to Tavg

<5000F.

S2.0P-IO.ZZ-O004(Q),

REDUCE Reactor Power

), Power Operation, at rate and to power level specified by Assistant Mngr-Ops /

Mngr - Salem Ops.

IAW S2.0P-IO.ZZ-O004(Q STANDARD CUE: If asked, Manager - Salem Operations directs maintain current power level while chemistry determines severity of problem and proposes course of action.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-2 Page 7 of 20 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet 3TE1 NO.

10 -

11 12 13 STEP

(* = Critical Step)

(# = Sequential Step)

REQUEST Shift Chemistry Technician initiate confirmatory sample analysis of suspected rise in RCS activity. (Gamma Scan)

REQUEST Radiation Protection initiate surveys to determine if any Plant areas have abnormal radiation levels due to rise in RCS activity.

NOTIFY Primary NEOs that high activity in RCS is suspected.

Do results of confirmatory sample analysis confirm high or increasing activity in RCS?

Contacts Shift Chemistry, requests RCS activity sample.

Contacts Radiation Protection, requests radiation surveys.

Informs Primary NEOs of suspected high RCS activity.

CUE: Chemistry reports preliminary scan of RCS sample indicates elevated RCS activity.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-2 Page 8 of 20 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S I U STEl NO.

14 -

COMMENTS (Reqd for UNSAT Evaluation) 15 16 STEP

(* = Critical Step)

(# = Sequential Step)

STANDARD NOTIFY OS/CRS to refer to the following:

Technical Specifications Event Classification Guide NC.NA-AP.ZZ-O071(Q),

Fuel Integrity Program Informs CRS that procedure directs review of TS, Event Classification Guide and Fuel Integrity Program procedure.

Is reactor coolant activity below Technical Specification Limits?

CUE: Chemistry reports RCS sample activity level 0.65 uCi/gm Dose Equivalent I-13 1, NOTE: RCS activity is less than TS limit. Continues with procedure.

EVALUATE, with assistance from Shift Chemistry Technician, maximizing Letdown flow and CVCS demineralizer lineup for maximum RCS purification.

CUE: Chemistry requests maximum letdown flowrate.

NOTE: If necessary, as CRS, direct the applicant to align charging and letdown to maximize letdown.

NRC H-2 Page 9 of 20 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL s / u STEl NO.

17 -

COMMENTS (Reqd for UNSAT Evaluation) 18 19 20 -

STEP

(* = Critical Step)

(# = Sequential Step)

IF 23 Charging Pump in operation, TRANSFER to a Centrifugal Charging Pump 0002(Q), Charging Pump Operation.

IAW S2.OP-S0,CVC-ENSURE Centrifugal Charging Pump Auxiliary Oil Pump controller is selected to AUTO ENSURE OPEN:

0 2CV139, CHARGING MINIFLOW 0 2CV140, CHARGING MINIFLOW PLACE 23 Charging Pump in MANUAL.

STANDARD Refers to S2.0P-SO.CVC-O002(Q),

Charging Pump Operation, Section 5.6, Transfer From 23 Charging Pump to a Centrifugal Charging Pump.

CUE: Charging Pump Auxiliary Oil Pump controller is in AUTO.

Determines 2CV139 and 2CV140 are open.

Places 23 Charging Pump in MANUAL.

NRC H-2 Page 10 of 20 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEl NO.

21 -

22 23 24 NRC H-2 STEP

(* = Critical Step)

(# = Sequential Step)

IF 2CV55 is available, THEN A. ENSURE 2CV55 in MANUAL.

B. PLACE 2CA2015, CONTROL AIR SUPPLY TO CV55 BYPASS VALVE, in BYPASS.

C. CLOSE 2CV55 D. START a Centrifugal Charging.

STANDARD Verifies 2CV55 is in MANUAL.

Directs NE0 to place 2CA2015 in BYPASS.

CUE: NE0 reports 2CA2015 has been placed in BYPASS.

Closes 2CV55.

Starts 21 or 22 Centrifugal Charging Pump.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

Page 11 of 20 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEl NO.

25 -

26 NRC H-2 STEP

(* = Critical Step)

(# = Sequential Step)

E. ENSURE Centrifugal Charging Pump lube oil pressure is. 10 psig at Lube Oil Filter Strainer Out let Pressure Gauge (2PL8486 for 21 or 2PL8487 for 22) as applicable.

F. ENSURE Auxiliary Oil Pump is no longer operating.

STANDARD CUE: When equipment operator is asked, inform ROPO that lube oil pressure on running centrifugal charging pump is 19 psig.

CUE: Auxiliary Oil Pump is no longer operating, EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

Page 12 of 20 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEl NO.

27 -

28 29 NRC H-2 STEP

(* = Critical Step)

(# = Sequential Step)

G. Simultaneously PERFORM the following:

Slowly DECREASE 23 Charging Pump speed demand.

0 ADJUST 2CV55 to maintain desired flow.

H. WHEN23 Charging Pump Speed Demand is at MINIMUM, STOP 23 Charging Pump.

I. ADJUST 2CV55 to obtain desired flow.

STANDARD Decreases 23 Chg Pump speed demand.

Adjusts 2CV55 to maintain desired flow.

Stops 23 Charging Pump after reducing speed demand to minimum.

Adjusts flow by throttling 2CV55 to support maximizing letdown flow.

Page 13 of 20 EVAL S I U -

COMMENTS (Reqd for UNSAT Evaluation)

I NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEl NO.

30 -

31 STEP

(* = Critical Step)

(# = Sequential Step)

J.

normal charging flow is required for current RCS conditions, THEN PLACE 2 C m 5,

CONTROL AIR SUPPLY TO CV55 BYPASS VALVE, in NORMAL.

IS. IF Pressurizer level 2 1 1 be maintained within normal band, THEN:

1. PLACE Master Flow Controller in AUTO.

2CV55 in AUTO.

2. PLACE STANDARD Directs NE0 to place 2CA2015 in NORMAL.

CUE: NE0 reports 2CA2015 has been placed in NORMAL.

Places Master Flow Controller in AUTO.

Places 2CV55 in AUTO.

NOTE: May leave controllers in manual until letdown flow has been maximized.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-2 Page 14 of 20 NLTREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEl NO.

32 -

33 STEP

(* = Critical Step)

(# = Sequential Step)

L. ENSURE Seal Injection Flow 6-12 gpm to each Reactor Coolant Pump not to exceed 40 gpm total Seal Injection Flow.

~

~~

M, THROTTLE 2CC78, SEAL WTR HX CC THROT VALVE, to maintain Seal Water Heat Exchanger outlet temperature 95-100°F on 2TI120 STANDARD Verifies total seal injection flow less than 40 gpm and individual pump injection flows between 6 and 12 gpm. Adjusts if necessary.

Directs NE0 to report heat exchanger CCW outlet temperature.

CUE: NE0 reports outlet temperature steady at 97°F.

EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

NRC H-2 Page 15 of 20 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S I U

~

COMMENTS (Reqd for UNSAT Evaluation)

STEl NO.

34 -

NRC H-2 STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE Service Water supply to lube oil heat exchanger by checking associated Aux Alarm point change of state:

Point #0793,21 CHG PMP LUBE OIL CLR CONTR VA 2SW185, OFFNORPOS Point #0804,22 CHG PMP LUBE OIL CLR CONT VA 2SW 199/0FFNORPOS STANDARD Verifies appropriate point state for the running centrihgal charging P-P, Page 16 of 20 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEl NO.

35 -

STEP

(* = Critical Step)

(# = Sequential Step)

Raise Letdown flow to maximum as follows:

A. Take manual control of HX OUTLET VALVE, AND CONTROL Letdown pressure at

=300 psig while performing the

1. OPEN one 75 gpm 2CV18, NON-REGEN following:

orifice:

2CV4 (75 GPM ORIFICE) 2CV5 (75 GPM ORIFICE)

2. OPEN 2CV3,45 GPM ORIFICE
3. ENSURE Letdown flow through Mix Bed is 1130 gpm.

STANDARD Places 2CV 18 in MANUAL.

Adjusts valve to maintain -300 psig letdown pressure while aligning letdown orifices.

Opens 2CV4 OR 2CV5.

Opens 2CV3.

Verifies letdown flow rate 5 130 am.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-2 Page 17 of 20 NUREG-1021, Revision 9

  1. / STEF NO.

36 NRC H-2 STEP

(* = Critical Step)

EVAL COMMENTS

(# = Sequential Step)

STANDARD S I U (Reqd for UNSAT Evaluation)

RETURN 2CV18 to AUTO.

Places 2CV18 back in AUTO.

TERMINATING CUE: 2CV18 in AUTO. Task is complete.

Page 18 of 20 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-2 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-2 Page 19 of 20 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

The unit is at 100% power.

An alarm has actuated on 2W1 Radiation Alarm Annunciator Panel.

INITIATING CUE:

You are the RO and are directed to respond to the alarm.

NRC H-2 Page 20 of 20 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-3 Task

Title:

Task Number: 1150100501 WA

Reference:

Perform Actions For A Transfer To Cold Leg Recirculation EPE 01 1 EA1.11 (4.1,4.1)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

.I Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A LBLOCA has occurred. All ECCS equipment functioned as designed. The vital buses are powered from the switchyard. The transition to LOCA-3 (from LOCA-1) was just made following actuation of the RWST LO Level alarm.

The simulator operator will be the EOP reader.

Task Standard:

Transfer to cold leg recirculation in accordance with EOPs.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None General References :

NRC H-3 Page 1 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet

1.

2-EOP-LOCA-3, Transfer to Cold Leg Recirculation Applicability:

EO RO d

SRO d

Initiating Cue:

You are the RO/PO. Transfer to cold leg recirculation in accordance with LOCA-3. This task is time critical. IAW the procedure you should close SJ69 within 3 minutes and complete the shift to cold leg recirculation within 11.7 minutes, as evidenced by closing SJ30, SJ1 and SJ2. The clock starts with the reading of the first step.

Time Critical Task:

Yes. See initiating cue.

Validation Time:

9 minutes Simulator Setup:

1.
2.
3.
4.

Run LBLOCA malfunction from any full power steady state IC.

Follow procedures (TRIP-1, LOCA-1, LOCA-3) to align plant as expected up to point where RWST LOW level alarm received.

Freeze simulator at point where RWST LOW level alarm in. Snapshot simulator for use on subsequent administration of this JPM.

Generate a marked-up copy of LOCA-1 for use by the applicant(s).

NRC H-3 Page 2 of 10 NUREG-1 02 1, Revision 9

Appendix C Job Perfonnance Measure Form ES-C-1 Worksheet STEP NO.

1 2

3 4

STEP

(

  • = Critical Step)

Operator obtains 2-EOP-LOCA-2 Is Containment Recirc Sump level >62%?

Depress SUMP AUTO ARMED PBs on 21 and 22SJ44 Bezels Remove lockouts for the following valves:

0 2SJ67 2SJ68 2SJ69 STANDARD NOTE: Category I1 procedure use requirements apply NOTE: Provide applicant with marked UP COPY of 2-EOP-LOCA-2 Evaluator: Log start time for evaluation of critical time requirements:

Verifies either Ch. A or B Sump Level indication is >62%.

WHITE indicating light energizes and valves stroke OPEN. The RED OPEN indicating light energizes when each valve reaches full stroke.

On RP-4 position the valve lockout switches to:

2SJ67 - RECIRC OVERRIDE 2SJ68 - RECIRC OVERRIDE 2SJ69 - VALVE OPERABLE CLOSED CLOSED EVAL s/u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-3 Page 3 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP 11 STEP

(

  • = Critical Step)

~~

Are 21 and 22SJ 44 Open?

Start 21 and 22 RHR P U P 9

Reset EMERGENCY LOADING for each SEC 10 Reset 230V CONTROL CENTERS stop 22 cs PUMP STANDARD

~

~~

~~

Verifies both valves open Verifies both RHR Pumps are running SJ69 closed indication Verifies GREEN SI RESET PB illuminated on safeguards bezel.

Verifies WHITE EMERGENCY LOADING RESET PB on each DG bezel is illuminated Verifies WHITE 230V CONTROL CENTER RESET PB on each DG is illuminated.

Depress GREEN STOP PB for 22 CS PUMP and observe that RED START PB light extinguishes.

I COMMENTS I

NRC H-3 Page 4 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL STANDARD S / U STEP NO.

COMMENTS (Reqd for UNSAT Evaluation) 12 13 14 15 16 NRC H-3 STEP

(

  • = Critical Step)

Close 2 1 and 22RH 19 CONN VALVES)

(RHR HX DISCH X-Stop 23 CHARGING PUMP Select appropriate flowpath transition step fi-om TABLE B Is any 4KV Vital Bus energized by DG?

Are at least three SW PUMPS running?

Depress GREEN CLOSE PB on 21 and 22RH19 and observe that RED OPEN PB light extinguishes and GREEN illuminates.

Evaluator: Log stop time for evaluating completion of time critical task:

(e minutes) 23 Charging Pump tagged 00s Determines that all 4KV Vital Buses are energized and proceeds to Step 1 1, per TABLE B.

Determines that 4KV Vital Buses are being fed fi-om the switchyard based on breaker position and/or the Mimic Bus.

Verifies three SW PUMPS are running based on RED START LIGHT illuminated and/or amperage.

Page 5 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S / U STEP

  • = Critical Step)

COMMENTS (Reqd for UNSAT Evaluation) 18 Are at least two CCW PUMPS running?

19 Open21 and22CC16 (CCW to RHR HX OUTLET VALVES)

STANDARD 20 Close 2SJ67 and 2SJ68 (SI PUMP MINIFLOW VALVES)

Determines 21 and 22 CCW HXs in service by observing CCW outlet temperature and verifying SW flowhalve alignment.

21 Verifies two CCW PUMPS running by observing RED START PB illuminated and/or running amps.

Verifies 21 and 22CC16 OPEN by observing RED OPEN PB illuminated.

NOTE: Normally AUTO ARMED to open at RWST LO LEVEL SETPT.

Close 2RH1 and 2RH2 (COMMON SUCTION VALVES)

Depresses GREEN CLOSE PB on 2SJ67 and 2SJ68, observes RED OPEN PB light extinguish and GREEN CLOSE light illuminate.

Verifies GREEN CLOSE PB light on 2RH1 and 2RH2 are illuminated.

NRC H-3 Page 6 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S / U I

I STEP COMMENTS (Reqd for UNSAT Evaluation)

STEP

(

I NO* I

  • = Critical Step) 22 24 23 Open 22SJ45 (RHR DISCHARGE TO CHARGING PUMPS VALVE) 25 Open 2 1 SJ45 (RHR DISCHARGE TO SI PUMPS VALVE)

Open 21 and 22SJ113 (SI-VALVES)

CHG PUMPS X-OVER start:

21 and22 21 and 22 SI PUMPS CHARGING PUMPS 1

26 1 ;;;yeLockoutfor STANDARD Depresses RED OPEN PB on 22SJ45, observes GREEN CLOSE PB extinguish and RED OPEN PB illuminate.

Depresses RED OPEN PB on 21SJ45, observes GREEN CLOSE PB extinguish and RED OPEN PB illuminate.

Verifies RED OPEN PB illuminated on 21 and 22SJ113.

NOTE: Normally AUTO ARMED to open at RWST LO LEVEL SETPT.

Verifies RED START PB illuminated and/or running amps on 21 and 22 SI and CHARGING PUMPS.

Removes SJ30 LOCKOUT using switch on Rp-4 NRC H-3 Page 7 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

27 28 STEP

(

  • = Critical Step)

Isolate the RWST as follows:

0 CLOSE2SJ30 CLOSE2SJl CLOSE2SJ2 Place controllers for recirculation valves 2 1 and 22RH29 in MANUAL and CLOSE the valves.

STANDARD For 2SJ30: Depress the GREEN CLOSE PB, observe the RED OPEN PB light extinguish and the GREEN CLOSE PB illuminate.

For 2SJ1 and @SJ2: Select MANUAL by depressing the BLUE PB, depress the GREEN CLOSE PB, observe the RED CLOSE PB light extinguish and the GREEN CLOSE PB illuminate.

Evaluator: Log stop time for evaluating completion of time critical task (Cll. 7 minutes)

On each valve, select MANUAL by depressing the BLUE PB, depress the GREEN CLOSE PB, observe the RED OPEN PB light extinguish and the GREEN CLOSE PB illuminate.

TERMINATING CUE:

21 and 22RH29 closed EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-3 Page 8 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-3 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-3 Page 9 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

A LBLOCA has occurred. All ECCS equipment fimctioned as designed. The vital buses are powered from the switchyard. The transition to LOCA-3 (from LOCA-1) was just made following actuation of the RWST LO Level alarm. The simulator operator will be the EOP reader.

INITIATING CUE:

You are the RO/PO. Transfer to cold leg recirculation in accordance with LOCA-3. This task is time critical. IAW the procedure you should close SJ69 within 3 minutes and complete the shift to cold leg recirculation within 11.7 minutes, as evidenced by closing SJ30, SJl and SJ2. The clock starts with the reading of the firststep.

NRC H-3 Page 10 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-4 Task

Title:

Take Corrective Action For A Reactor Coolant Pump Abnormality (Spurious Isolation of RCP Mtr Brg CCW)

Task Number: 1140290401 K/A

Reference:

003 A1.05 (3.4,3.5)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

.I Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The unit is in Hot Standby at normal operating pressure and temperature.

The Reactor Trip Breakers are open. Alarms have just actuated on Overhead Annunciator Window D.

Task Standard:

Trip RCPs following loss of cooling water flow and verify establishment of natural circulation flow.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None NRC H-4 Page 1 of 10 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet General

References:

1.

S2.OP-AR.ZZ-0004, Overhead Annunciators Window D

2.
3.

S2.OP-AB.0004, Natural Circulation S2.OP-AB.RCP-0001, Reactor Coolant Pump Abnormality Applicability:

EO RO 4

SRO d

Initiating Cue:

You are the RO/PO. Take actions to address the alarm on Overhead Annunciator Window D. Implement response procedures as required.

Time Critical Task(s):

1. Implement S2.OP-AB.RC-0001 within 5 minutes of start of JPM.
2. Trip RCPs within 6 minute after determining cooling water flow is lost or within 1 minute after motor bearing temperature exceeds 175OF.

Validation Time:

xxxxx minutes Simulator Setup:

1.
2.
3.
4.
5.

Reset to a hot standby IC.

Activate malfunction VL0052 at 0% to fail the RCP Motor Bearing Cooling Water Outlet Valve 2CC136 closed.

Freeze simulator when CCW low flow alarm received.

Place simulator in RUN after applicant has read and understood initiating cue.

Insert Malfunction Malf MS0302, PT-507 fails to xxxx, after ALL RCPs are tripped.

NRC H-4 Page 2 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

1 2

3 STEP

(* = Critical Step)

(# = Sequential Step)

Operator obtains Procedure AR.ZZ-0004 for Overhead Annunciators Window D. Refers to steps for RCP BRG CLG WTR FLO LO alarm, Check open following CCW inlet and outlet valves on RCP bearing cooling lines:

2CC117 2CC118 2CC136 2CC187 If CCW Flow cannot be established within 5 minutes or any RCP motor bearing temperature reaches 175OF, THEN GO OOOl(Q), RCP Abnormality.

TO S2.0P-AB.RCP-STANDARD NOTE: Category I1 procedure use requirements apply NOTE: Operator may choose to go directly to S2.OP-AB.RCP-000 1, RCP Abnormality Evaluator: Log start time for evaluation of critical time requirements:

Observes 2CC136 is closed. If requested to operate locally, evaluator waits 2 minutes, then cues applicant that valve will not operate locally.

Notes the time of D-20,2 1,22,23 alarms per BETA CRT.

EVAL s/u -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-4 Page 3 of 10 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet 5

STEP NO.

Implements S2.0P-AP.RC-0001.

4 6

STEP Initiate Attachment 1 Continuous Action SU~EKWY of Al.RC-0001.

(* = Critical Step)

(# = Sequential Step)

Monitor RCP bearing temperatures (T0413A, T0414A, T0415A, and TO41 6A).

STANDARD Places RCP bearing temperature points on Plant Computer CRT Note: Should enter AB.RCP-0001 not less than 5 minutes after start of JPM or immediately after exceeding 175°F upper motor bearing temperature.

Entering earlier is at examinees discretion.

Enters S2,OP-AB.RCP-0001.

Note: Time Critical Step Initiates Attachment 1.

EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

NRC H-4 Page 4 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP

. NO.

7 -

STEP

(* = Critical Step)

(# = Sequential Step)

IF AT ANY TIME, any of the following validated conditions occurs, go to Att. 2, Stopping Reactor Coolant Pumps:

Component Cooling water flow is lost to Component Cooling Water flow not restored within 5 minutes of initial loss:

RCPs.

- OHA-D-20,21 RCP BRG CLG WTR FLO LO CLG WTR FLO LO CLG WTR FLO LO CLG WTR FLO LO Motor bearing temp

>175F

- OHA-D-21,22 RCP BRG

- OHA-D-22,23 RCP BRG

- OHA-D-23,24 RCP BRG STANDARD Should validate the condition based on D-20,2 1,22,23 alarms and rising bearing temperatures.

Should implement Attachment 2 immediately after noting that >5 minutes have elapsed.

All RCPs should be stopped not less than one minute after Motor Bearing Temperature exceeds 175°F.

Mark the time if Motor Bearing Temp. exceeds 175°F:

EVAL s/u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-4 Page 5 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

8 9

10 11 12 STEP

(* = Critical Step)

(# = Sequential Step)

EVAL S / U I

STANDARD COMMENTS (Reqd for UNSAT Evaluation)

~

If reactor trip breakers are open, then stop all reactor coolant pumps.

If reactor trip breakers are open and all RCPs are stopped and RHR is not in service, then go to AELRC-0004, Natural Circulation.

Stops all RCPs using control board handswitches.

Note: Insert Malf MS0302, PT-507 fails to xxxx over 30 seconds, after RCPs have been tripped.

Implements S2.OP-AELRC-0004.

Initiate Al3.RC-0004,, Continuous Action Summary.

Initiates Attachment 1.

Start 3 Rod Drive Vent Fans.

Starts additional Rod Drive Vent Fans as needed.

Start 1 Shield Vent Fan.

NRC H-4 Verifies RED running light lit on running Shield Vent Fan.

Page 6 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

13 14 NRC H-4 STEP

(* = Critical Step)

(# = Sequential Step)

Start 2 Nozzle Support Vent Fans in the proper combination:

21 and22 21 and24 23 and24 22and23 or or or Start at least 3 CFCUs in high speed..

Verifies 2 Nozzle Support Vent Fans are running in the proper combination.

Verifies at least 3 CFCUs in high speed operation.

Note: Maximum of 4 CFCUs in high speed at one time.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

Page 7 of 10 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

15 STEP

(* = Critical Step)

(# = Sequential Step)

Check natural circulation occurring as indicated by all of the following:

0 RCS subcooling >OOF 0 SG pressures stable or dropping RCSWRHotLeg temps stable or dropping CET temperatures stable or dropping RCS WR Cold Leg temps at saturation temp for SG pressure

~~

STANDARD EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

Determines that WR Hot Leg and CET temperatures are increasing. Takes manual control of steam dumps or atmospheric dumps and lowers CET and WR Hot Leg temperatures.

Terminating Cue:

Operator opens Steam Dumps in manual and observes hot leg and CET temperature decrease NRC H-4 Page 8 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-4 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-4 Page 9 of 10 NUREG-1021, Revision 9

Appendix C Job Perfox%mce Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

The unit is in Hot Standby at normal operating pressure and temperature. The Reactor Trip Breakers are open. Alarms have just actuated on Overhead Annunciator Window D.

INITIATING CUE:

You are the ROPO. Take actions to address the alarm on Overhead Annunciator Window D. Implement response procedures as required.

NRC H-4 Page 10 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1822 Job Perfomance Measure No.: NRC H-5 Task

Title:

Respond to High Containment Sump Level (CFCU Leak)

Task Number: 1150370501 WA

Reference:

E15 EA1.l (2.9,3.0)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

.I Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A large break LOCA has occurred. Operators have implemented the EOPs.

The CRS just directed a transition to FRCE-2, Response to High Containment Sump Level.

Task Standard:

Identify and isolate leaking containment fan cooler unit.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None General

References:

1.

2-EOP-TRIP-1, Reactor Trip or Safety Injection NRC H-5 Page 1 of 6

=G-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet 2-EOP-FRCE-2, Response to High Containment Sump Level

2.

Applicability:

EO RO 4

SRO d

Initiating Cue:

You are the licensed operator assigned to perform FRCE-2, Response to High Containment Sump Level.

Time Critical Task(s):

None Validation Time:

8 minutes Simulator Setup:

1.

Reset to IC-1.

2.
3.

Enter Malfunctions RCOOOlA and SW0218, severity 2500, no ramp.

Run simulator until containment sump level is >75%. Ensure containment pressure >4psi. If an RWST LO level alarm is reached then perform LOCA-3 until the FRP implementation step is reached.

Freeze simulator and snap IC into a temporary location.

4.

NRC H-5 Page 2 of 6 NCTREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 STEP NO.

STEP

(* = Critical Step)

(# = Sequential Step)

STANDARD EVAL S / U COMMENTS (Reqd for UNSAT Evaluation)

Provide candidate with the Tear-Off Sheet 1

IS SW flow to 21-25 CFCUs normal?

Checks SW flow on all CFCUs and determines that #23 is not normal 2

Identirjr and stop the affected CFCU Stops 23 CFCU 3

Close SW58 (Inlet Valve) on affected CFCU Closes 23SW58 4

Close SW72 (Outlet Closes 23SW72 Valve) on affected CFCU NRC H-5 5

Page 3 of 6 Is 2FP147 (CIV) open?

Checks RP-5 and answers NO NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S / U STEP NO.

COMMENTS (Reqd for UNSAT Evaluation) 6 7

8 STEP

(* = Critical Step)

(# = Sequential Step)

Is CCW Surge Tk Level dropping in an uncontrolled or unexplained manner?

Is DMST Level dropping in an uncontrolled or unexplained manner as determined by Unit 1 indication?

Is PWST Level dropping in an uncontrolled or unexplained manner?

STANDARD Checks level and answers NO CUE: NO Checks indication and answers NO TERMINATING CUE: PWST level checked.

NRC H-5 Page 4 of 6 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-5 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-5 Page 5 of 6 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

A large break LOCA has occurred. Operators have implemented the EOPs. The CRS just directed a transition to FRCE-2, Response to High Containment Sump Level.

INITIATING CUE:

You are the licensed operator assigned to perform FRCE-2, Response to High Containment Sump Level.

NRC H-5 Page 6 of 6 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-6 Task

Title:

Task Number: 0450040101 WA

Reference:

062 A4.07 (3.1,3.1)

Synchronize And Load The Generator Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

4 Plant:

MAD TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The main turbine is operating at approximately 1800 rpm, with excitation applied.

Turbine control is in OPER AUTO 500 kV Breaker 1-9 (32X) is isolated and tagged.

Task Standard:

xxxxxxx Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completec in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None General

References:

NRC H-6 Page 1 of 13 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet

1.

S2.OP-SO.TRB-0001 Turbine Generator Startup Operations Applicability:

EO RO 4

SRO d

Initiating Cue:

Starting with Step 5.5.2 of S2.OP-SO.TRB-0001, synchronize the main generator to the grid.

Time Critical Task(s):

None Validation Time:

15 minutes Simulator Setup:

1.
2.
3.
4.
5.

Reset to IC for generator ready to sync. Turbine must be at 1800 rpm with controls in OPER AUTO and generator excitation applied.

Enter Malfunction EL0308, Generator Fails To Load Automatically.

Perform S2.OP-SO.TRB-0001 through Step 5.5.1, completion of, Section 1.0 and 2.0.

Tag the 500 kV 1-9 Breaker.

Leave turbine speed at a point where minor adjustment is required to get the synchroscope rotating at the correct speed.

NRC H-6 Page 2 of 13 NUREG-102 1, Revision 9

Appendix C Job Performance Measure FOITII ES-C-1 STEP NO.

1 2

3 NRC H-6 STEP

(* = Critical Step)

(# = Sequential Step)

Candidate reviews procedure ENSURE 500KV 9-10 (30X) Breaker selected to 9-10 LOCAL At 2RP6, SELECT NO. 2 UNIT SCOPE TRANSFER Switch to either REGULAR SCOPE or SPARE SCOPE position.

STANDARD Provide copy of S2.OP-SO.TRB-0001, marked up through completion of Step 5.5.1 Category 1 procedure use requirements apply Verifies 500KV 9-10 (30X) Breaker selected to LOCAL Selects REGULAR (Scope on 1RP4)

EVAL s / u -

COMMENTS (Reqd for UNSAT Evaluation)

Page 3 of 13 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet

~~

STEP NO.

4 5

STEP

(* = Critical Step)

(# = Sequential Step)

MONITOR selected synchroscope while performing the following:

DEPRESS SCOPE TEST pushbutton on 500KV BREAKER Bezel.

0 ENSURE synchroscope hand indicates 12 o'clock.

ENSURE INCOM KV and RUN KV Voltmeters both respond by moving upscale.

RELEASE SCOPE TEST pushbutton.

SECTIONS 1-9 (32X)

ENSURE MN GEN SYNC PERM BYPASS key lock switch is in NORMAL STANDARD 0

Presses and holds the SCOPE TEST button.

Verifies the scope hand indicates 12 o'clock.

0 Verifies the INCOM KV and RUN KV Voltmeters move upscale.

0 Releases the SCOPE TEST button.

Verifies switch in NORMAL EVAL s / u COMMENTS (Req'd for UNSAT Evaluation)

NRC H-6 Page 4 of 13 NLTREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

6 -

7 STEP

(* = Critical Step)

(# = Sequential Step)

IF 500KV 1-9 (32X)

Breaker is available, THEN:

500KV 1-9 (12X)

Breaker is NOT available, THEN:

SELECT Mimic Bus 500 KV BUS SEC (30X).

- ENSUREMimic Bus pushbutton back light is yellow.

(1OX) bezel MIMIC BUS INTLK CLS SEL back light is illuminated.

SYNCH POT ON.

9-10 BREAKER

- ENSURE 9-10 SELECT9-10 STANDARD CUE: The 1-9 Breaker is NOT available.

0 Presses the 500 KV BUS SEC 9-10 BREAKER on Mimic Bus Verifies the button illuminates yellow Verifies the 9-10 MIMIC BUS INTERLOCK CLOSE SEL is illuminated.

0 Presses the 9-10 SYNCH POT 01 button and verifies the button illuminates.

~~

EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

NRC H-6 Page 5 of 13 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

8 9

10 NRC H-6 STEP

(* = Critical Step)

(# = Sequential Step)

If Voltage Regulator Voltage Matching Circuit is available, then select VOLTAGE MATCHING ON Maintain Generator Voltage 3-5KV greater than RUN KV (Line Voltage).

STANDARD Selects VOLTAGE MATCHING ON Monitors Incoming and Running voltagl Adjusts Voltage as necessary EVAL s/u COMMENTS (Reqd for UNSAT Evaluation)

IF INCOM KV IS >5KV above RUN KV then Select VOLTAGE MATCHING OFF ADJUST Generator Output Voltage to 3-5 KV>RUN KV Page 6 of 13 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

11 12 13 14 15 STEP

(* = Critical Step)

(# = Sequential Step)

ADJUST turbine speed so that synchroscope is rotating in FAST direction at a rate of 1 revolution in every 25 to 30 seconds.

REQUEST Systems Operator permission to load Main Generator.

~

~ _ _ _ _

NOTIFY Hope Creek OS/CRS that Unit 2 Generator is to be synchronized to the grid.

IF turbine is in OPER AUTO, THEN:

ENSURE GV TRACKING METER at 0% (nulled)

STANDARD Adjusts speed to attain correct rate CUE: You have permission to load Main Generator.

CUE: Hope Creek CRS acknowledges.

Checks meter and adjusts, as necessary EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-6 Page 7 of 13 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

16 17 NRC H-6 STEP

(* = Critical Step)

(# = Sequential Step)

IF MAIN GEN SYNC PERMISSIVE green indicating light is not illuminating each time synchroscope indicator is near 12 oclock position, OR is illuminated at any other position of synchroscope, THEN:

When synchroscope is 1 to 2 minutes before 12 oclock, PRESS CLOSE pushbutton on selected breaker:

STANDARD Determines the green indicating light is operating properly.

Presses the 9-10 500 KV Breaker button at the proper time and verifies the button illuminates.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation) 1-9 500 KV Breaker 0

OR 9-10 500 KV Breaker Page 8 of 13 NIJREG-102 1, Revision 9

Appendix C Job Performance Measure FOIIII ES-C-1 Worksheet SELECT SYNCH POT OFF for selected breaker:

1-9 500 KV Breaker OR 0

9-10 S C K V Breaker STEP NO.

~~

Presses the SYNCH POT OFF for the 9-10 breaker and verifies the button illuminates.

18 STEP

(* = Critical Step)

(# = Sequential Step)

STANDARD EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

NRC H-6 Page 9 of 13 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

19 -

20 NRC H-6 STEP

(* = Critical Step)

(# = Sequential Step)

If load does not increase to 40-60 MW within 15 secs.,

then either:

Select Load Rate 4%/min and raise SETTER 1% above REFERENCE for each 10 MW (not to exceed 4%) utilizing the REF PB.

OR Select TURB MANUAL and raise turbine load to 40-60 MW utilizing the GVA PB NotifL OS/CRS When turbine OPER AUTO is available select OPER AUTO under OS/CRS direction IF turbine is in TURB MANUAL.....

STANDARD Recognizes generator did not load and raises load to >O MW, by either method.

NOTE: TURB MANUAL is very sensitive. Use of that method may result in a large load swing.

Turbine is in AUTO Page 10 of 13 EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

~~~

NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

21 22 23

~

24 25 NRC H-6 STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE turbine LOAD CONTROL light is illuminated.

ENSURE REFERENCE and SETTER Displays agree.

ENSURE VOLTAGE MATCHING OFF Bezel illuminated LOG time of generator synchronization in Narrative Log.

NOTIFY Electric System Operator that Salem Unit 1 is available for loading.

Verifies the Turbine LOAD CONTROL light is illuminated.

Verifies the REFERENCE and SETTER Displays agree.

Verifies VOLTAGE MATCHING OFF CUE: The time has been logged.

CUE: The Electric System Operator acknowledges.

TERMINATING CUE: Electric System Operator has been notified.

~~

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

Page 11 of 13 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-6 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-6 Page 12 of 13 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

The main turbine is operating at approximately 1800 rpm, with excitation applied.

Turbine control is in OPER AUTO 500 kV Breaker 1-9 (32X) is isolated and tagged.

INITIATING CUE:

Starting with Step 5.5.2 of S2.OP-SO.TRBOOO1, synchronize the main generator to the grid.

NRC H-6 Page 13 of 13 NLTREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-7 Task

Title:

Align Control Area Ventilation For "Accident - Pressurized Air" (Manually Actuate CR Accident Pressurized Mode Operation)

Task Number: 0880080101 WA

Reference:

037.A1.01 (3.2,3.5)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

4 Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The unit is operating normally at 100% power.

Task Standard:

Identify the failure to automatically shift to CR Accident Pressurized Mode Operation and take manual actions to properly align control area ventilation.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None General

References:

1.

S2.OP-AR.ZZ-0001, "Overhead Annunciators - Window A NRC H-7 Page 1 of 12 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet

2.

S2.OP-AB.RAD-0001, L6Abn~rmal Radiation

3.

S2.OP-S0.CAV-0001, L C C ~ n t r ~ l Area Ventilation Operation Applicability:

EO RO

.(

SRO d

Initiating Cue:

You are the RO/PO. Respond to RMS TRBL alarm (Window OHA A-6).

Time Critical Task(s):

None Validation Time:

xxxxx minutes Simulator Setup:

1.
2.

Reset to 100% power IC.

Defeat Auto CR Pressurized Mode (may need to use overrides to place 2R1B monitor in block, defeat some alarms, and to hold manual mode actuation switch in normal position).

Defeat auto start of 21 and 22 EACS Supply Fans.

Prevent Damper 2CAA14 from closing on Pressurized Mode actuation.

Drive Unit 2 Control Area Intake Rad Monitors 2RlB-1 and 1RlB-2 into high alarm (Malf RM0207A????).

3.
4.
5.

NRC H-7 Page 2 of 12 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

3 STEP

(* = Critical Step)

(# = Sequential Step)

DETERMINE the affected channel by observing indicators, annunciators on 2RP1, RMS Computer, and the Annunciator CRT.

IF 2RlB-1 (Unit 2 Control Room Intake Duct) is the cause of the alarm AND high radiation is indicated, THEN GO TO S2.0P-AB.RAD-0001 (Q),

Abnormal Radiation.

Is the alarm, warning, or rising indication valid?

STANDARD EVAL s / u Refers to Alarm Procedure S2.0P-AR.ZZ-0001 for OHA A-6, RMS TRBL.

Checks 2RP1, RMS computer, and annunciator CRT. Determines 2RlB-1 AND 1RlB-2 are both in alarm.

Goes to S2.OP-AB.RAD-0001, Abnormal Radiation.

NOTE: May attempt to determine if monitors are operable by performing source check.

CUE: Chemistry reports sample of control area intake shows high activity.

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-7 Page 3 of 12 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S / U STEP NO.

COMMENTS (Reqd for UNSAT Evaluation)

STEP

(* = Critical Step)

(# = Sequential Step)

ANNOUNCE the following on Plant PA system:

Affected Radiation Monitor number and name Locationof Radiation Monitor area with elevated indication NOTIFY OSKRS to REFER to Event Classification Guide, ODCM and Technical Specifications.

INITIATE the applicable attachment for affected Radiation Monitor.

STANDARD Makes PA announcement that Unit 2 Control Area Intake radiation monitors 2RlB-1 and 1RlB-2 are in high alarm.

Notifies CRS.

CUE: CRS acknowledges communication, Initiates Attachment 1 for 2RlB-1 monitor alarm.

NRC H-7 Page 4 of 12 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

7 8

STEP

(* = Critical Step)

(# = Sequential Step)

IF 2RlB-1 or 2RlB-2, Control Room Intake Duct, is the affected monitor, THEN COORDINATE with Unit 1 NCO to ensure Control Room Ventilation is aligned to ACCIDENT PRESSURIZED mode IAW the following procedures:

S2.OP-S0.CAV-OOOl(Q), Control Room Ventilation Operation OOOl(Q), Control Room Ventilation Operation S1.OP-S0.CAV-PRESS ACCIDENT PRESSURIZED pushbutton at 2FW2 STANDARD Refers to S2.OP-SO.CAV-O001(Q),

Control Room Ventilation Operation.

Determines that ventilation did NOT automatically align to ACCIDENT PRESSURIZED mode. Refers to Section 5.6, Manual Initiation of ACCIDENT PRESSURIZED Mode Operation.

Depresses pushbutton.

EVAL s/u -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-7 Page 5 of 12 NUREG-1 021, Revision 9

Appendix C Job Perfonnance Measure Form ES-C-1 Worksheet AREA ISOLATION Train A RESET/OPERATE AND CONTROL AREA ISOLATION Train B RESET/OPERATE red lamps are illuminated.

~

STEP NO.

9 -

10 NRC H-7 STEP

(* = Critical Step)

(# = Sequential Step)

STANDARD ENSURE red ACCIDENT PRESSURIZED lamp illuminates.

Verifies red lamp illuminated.

EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

Page 6 of 12 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 STEP NO.

11 NRC H-7 STEP

(* = Critical Step)

(# = Sequential Step)

~

~ _ _ _ _ _

IF manual initiation of ACCIDENT PRESSURIZED mode operation is NOT initiated due to an accident, THEN NOTIFY Unit 1 m

o PERFORM the following:

a. ENSURE Unit 1 CAACS is aligned to ACCIDENT PRESSURIZED mode of operation IAW Control Area Ventilation Operation, Exhibit 1 for Component Positions.
b. CLOSE the following Chilled Water Isolation Valves at 1RP2:

1CH30 1CH151 Verification of 1CH30 and lCHl5 1 positions.

S 1.OP-S0.CAV-0001 (Q),

c. PERFORM Independent STANDARD Directs Unit 1 NCO to perform actions.

CUE: Unit 1 NCO acknowledges.

EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

Page 7 of 12 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

12 -

13 STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE the following lamps illuminated on 2W2:

P2UnitEACSIN OPERATION 0 P 1 Unit EACS IN OPERATION 0

PlUnitEACS INTAKE DAMPERS OPEN CLOSE the following Chilled Water Isolation Valves at 2RP2:

0 1CH150 & 2CH30 lCHll7 & 2CH151 STANDARD Verifies lamps illuminated.

Closes valves. Confirms closed indication.

NOTE: Closing these valves will isolate chilled water to the Penetration Area Cooling Unit and PASS Sampling systems.

EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

NRC H-7 Page 8 of 12 NLTREG-102 1, Revision 9

Appendix C Job Perfonnance Measure Form ES-C-1 Worksheet STEP NO.

14 STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE the following damper and component alignments:

Components are aligned IAW Exhibit 1 based on the initiating unit and train(s).

IF any component listed on Exhibit 1 is NOT in the ACCIDENT PRESSURIZED position, THEN NOTIW Maintenance Controls AND REFER TO Step 3.28, Attachment 3, and Exhibits 2 and

4.

STANDARD Determines that Damper 2CAA14 (listed on S2.OP-SO.CAV-0001 (Q) Exhibit 1 Page 1 of 2) failed to CLOSE in ACCIDENT PRESSURIZED Mode.

Notifies Maintenance Controls to reposition damper.

CUE: Maintenance Controls acknowledges.

EVAL S I U -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-7 Page 9 of 12 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

15 16 17 STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE the following damper and component alignments:

CAACS fans, EACS fans, and Chilled Water System components are aligned IAW Exhibit

2.

~~

PERFORM Independent Verification:

1CH150 & 2CH30 1CH117&

CLOSED 2CH151 CLOSED RECORD charcoal filter hours IAW SC.0P-AP.ZZ-0004(Q), Cyclic Data Monitoring Program.

STANDARD Observes that neither 21 or 22 EACS Fan started (listed on S2.OP-S0.CAV-OOOl(Q) Exhibit 2, Page 1 of 2 as Items 6 and 7). Manually starts 21 or 22 EACS Fan.

Requests independent verification.

CUE: CRS acknowledges. Another operator has been directed to perform an independent verification.

TERMINATING CUE: Begins addressing charcoal filter hour logging.

EVAL s/u -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-7 Page 10 of 12 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-7 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-7 Page 11 of 12 NLTREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

The unit is operating normally at 100% power.

INITIATING CUE:

You are the RO/PO. Respond to RMS TRBL alarm (Window OHA A-6).

NRC H-7 Page 12 of 12 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-8 Task

Title:

Perform Actions For Component Cooling Water Restoration (Start a CCW Pump IAW APPX-1)

Task Number: 1150420501 WA

Reference:

EPE 007.EA1.04 (3.6,3.7)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

.I Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A reactor trip/SI with a loss of off-site power occurred a few minutes ago. It appears that a DBA LOCA has occurred. 2A and 2C 4kV Vital Buses are energized from their respective EDG. 2B 4kV Vital Bus tripped on an electrical fault.

Task Standard:

Start a CCW Pump IAW APPX-1.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None NRC H-8 Page 1 of6 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet General

References:

1.

2-EOP-TRIP-1, Reactor Trip or Safety Injection

2.

2-EOP-APPX-1, XXXXX Applicability:

EO RO 4

SRO

.(

InitiatinP Cue:

You are the 3rd NCO. The CRS has directed you to start one CCW Pump IAW 2-EOP-APPX-1.

Time Critical Task(s):

None Validation Time:

10 minutes Simulator Setup:

1.
2.
3.
4.

Reset to 100% power IC. Ensure 23 CCW Pump is running.

Initiate design basis LOCA with loss of offsite power. Set up 4 kV Vital Bus 2B to trip on electrical fault.

Perform steps of EOP-TRIP-1, up to the CCW Pump Operation Evaluation block.

Snap an IC for future use.

NRC H-8 Page 2 of 6 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 STEP STEP

(* = Critical Step)

NO.

(# = Sequential Step)

STANDARD 1

EVAL s/u Determines no vital busses powered from station power transformers and takes RN path.

I/

Check 4 kV Bus Status.

Check at least one vital bus energized by station power transformer.

2 I

I I

I Check ECCS and AFW Pump Status.

Determines all ECCS and AFW Pumps running on 2A and 2C Vital Buses.

3 4

Check one CCW Pump running.

running.

Observes that no CCW pumps are Select a CCW Pump start Selects Step 8,2B Vital Bus deenergized.

strategy.

5 If 2A and 2C Vital Buses energized, then start 23 Check23CCW Pump available CUE: 23 CCW Pump was running befor the accident and is available.

ccw Pump as follows:

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-8 Page 3 of 6 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 STEP NO.

6 -

7 8

9 10 11 STEP

(* = Critical Step)

(# = Sequential Step)

Block2CSEC Reset2C SEC Stop 22 CS Pump Start 23 CCW Pump 0

Reset Containment spray 0

Close 22CS2,22CS Pump Discharge Valve STANDARD EVAL s / u Blocks 2C SEC on 2W1 Resets 2C SEC on 2W1 CUE: If necessary, as CRS, acknowledge that 22 CS Pump will be stopped.

22 CS Pump stopped.

23 CCW Pump running.

Resets Train A and Train B Containment Spray.

22CS2 closed.

TERMINATING CUE: Repeat back message form the operator on the status oj this evolution, then state JPM is complete.

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-8 Page 4 of 6 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-8 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-8 Page 5 of 6 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEE'S CUE SHEET INITIAL CONDITIONS:

A reactor trip/SI with a loss of off-site power occurred a few minutes ago. It appears that a DBA LOCA has occurred. 2A and 2C 4kV Vital Buses are energized from their respective EDG. 2B 4kV Vital Bus tripped on an electrical fault.

INITIATING CUE:

You are the 3rd NCO. The CRS has directed you to start one CCW Pump IAW 2-EOP-APPX-1.

NRC H-8 Page 6 of 6 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-9 Task

Title:

Take Corrective Action For A Control Room Evacuation (Locally Close a MSIV (MS167) and Operate the Assoc ARV (MS10))

Task Number: 1140130401 WA

Reference:

APE 068 AA1.01 (4.3,4.5)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

J Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1.
2.
3.

A Control Room Evacuation has taken place due to a noxious fumes problem.

A manual trip was initiated from 100% power.

S2.OP-AB.CR-0001 is being utilized to control the plant.

Task Standard:

Locally close MSIV and operate Atmospheric Relief Valve Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

Adjustable Wrench Flashlight NRC H-9 Page 1 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet General

References:

1.

S2.OP-AB.CR-0001, Control Room Evacuationyy Applicability:

EO RO d

SRO d

Initiating Cue:

Beginning at Step 7 (Proceed to the Inner Pen Area), perform the actions of S2.OP-AB.CR-0001, Attachment 7. The previous steps have already been completed.

Time Critical Task(s):

None Validation Time:

10 minutes Simulator Setup:

Not Applicable. JPM is performed locally in plant.

NRC H-9 Page 2 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet

(* = Critical Step)

(# = Sequential Step) 1 Evaluator provide a marked 000 1, Attachment 7 UP COPY of S2.0P-AB.CR-Proceed to 21 SG Press Control Panel, 683-2A.

Close 21MS18A/S, A / S to SV587 STANDARD EVAL s / u Reviews the procedure.

NOTE: This is a Category I procedure.

Work Standards require that the operator refer to the procedure at each step of the task. Individual step documentation shall be complete prior to proceeding to the next step.

Closes 21MS18A/S, A/S to SV587 in Panel 683-2A or, after the panel has been located, the Evaluator may elect to provide a CUE: Assume that the valve has been closed COMMENTS (Reqd for UNSAT Evaluation)

NRC H-9 Page 3 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

2 -

3 STEP

(* = Critical Step)

(# = Sequential Step)

Proceed to 21 Mn Stm &

Trb Bypass Stm Gen Press Cont Pnl684-2A:

PLACE local E/P bypass Line Selector Valve in LOCAL position Operate hand sender in E/P line to ensure that PL-8907 indicates zero Proceed to 21 SG Press Control Panel, 683-2C.

Close 23MS 18A/S, A/S to SV585 STANDARD 2 1 MS 10 selector valve to LOCAL PL-8907 should read zero Closes 23MS18A/S, A/S to SV585 in Pnl 683-2C or, after the panel has been located, the Evaluator may elect to provide a CUE: Assume that the valve has been closed.

EVAL s/u -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-9 Page 4 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

4 5

STEP

(* = Critical Step)

(# = Sequential Step)

At 23MS 18, open the drain cock on the pressure regulator.

At 21MS 18, open the drain cock on the pressure regulator.

STANDARD Locates and opens drain cock on 23MS 18 pressure regulator.

CUE: Assume that the drain cock on 2 1MS 1 8 pressure regulator has also been opened.

Locates and opens drain cock on 2 1MS 18 pressure regulator.

CUE; Assume that the drain cock on 2 1MS 1 8 pressure regulator has also been opened.

EVAL S / U COMMENTS (Reqd for UNSAT Evaluation)

NRC H-9 Page 5 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

6 STEP

(* = Critical Step)

(# = Sequential Step)

Proceed to 23 Mn Stm &

Trb Bypass Stm Gen Press Cont Pnl684-2C:

PLACE local E/P bypass Line Selector Valve in LOCAL position Operate hand sender in E/P line to ensure that PL-8909 indicates zero STANDARD 23MS10 selector valve to LOCAL PL-8909 should read zero EVAL S I U -

COMMENTS (Reqd for UNSAT Evaluation)

NRC H-9 Page 6 of 10 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

7 NRC H-9 STEP

(* = Critical Step)

(# = Sequential Step)

Fail open 21MS171, MS ISOL VLV; at No. 2 Unit Main Steam Vent VLV Control Panel 688-2A by:

0 Close 2CA13 18, SUP TO PNL 688-2A 0

Close 2CA1319, SUP TO PNL 688-2A 0

Open drain-cock of pressure regulator for SV275 (inside Panel 688-2A)

STANDARD Closes 2CA1318, SUP TO PNL 688-2A Closes 2CA1319, SUP TO PNL 688-2A Opens drain cock for pressure regulator CUE: 21MS167 closed. At this point, assume all other actions of Attachment 7 have been completed and you are ready to make your report to the HSD Panel operator IAW Step 25.

Page 7 of 10 EVAL s / u COMMENTS (Reqd for UNSAT Evaluation)

NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S / U I

STEP COMMENTS (Reqd for UNSAT Evaluation)

(* = Critical Step)

(# = Sequential Step) sTEpl NO.

9 OPERATE hand sender in E/P line to increase pressure indicated on PL-8907.

STANDARD CUE: Since we are presently located in the Inner Pen Area, utilizing the controls of 21 or 23MS10, demonstrate how you would have throttled open 22 or 24MS 10 if the steps had actually taken us to the Outer Pen.

Operates hand sender to raise air pressure.

TERMINATING CUE: Reports 21MS10 open.

NRC H-9 Page 8 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-9 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-9 Page 9 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

1.
2.
3.

A Control Room Evacuation has taken place due to a noxious fumes problem.

A manual trip was initiated fiom 100% power.

S2.OP-AB.CR-0001 is being utilized to control the plant.

INITIATING CUE:

Beginning at Step 7 (Proceed to the Inner Pen Area), perform the actions of S2.OP-AB.CR-000 1, Attachment 7. The previous steps have already been completed.

NRC H-9 Page 10 of 10 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-10 Task

Title:

Perform Actions For A Loss Of All AC Power (Locally Isolate Seal Injection)

Task Number: 1150140501 KIA

Reference:

EPE 055 EA2.03 (3.9,4.7)

Method of testing:

Simulated Performance:

Actual Performance:

Classroom:

Simulator:

.I Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A loss of all AC power has occurred. The unit was operating normally at full power prior to the event.

Task Standard:

Locally isolate seal injection per Step 27 of LOPA-1.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

None General

References:

1.

EOP-LOPA-1, Loss of All AC Power NRC H-10 Page 1 of 7 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Applicability:

EO RO d

SRO

.(

Initiating Cue:

You are directed to locally isolate RCP Seal Cooling per Step 27 of EOP-LOPA-1.

Time Critical Task(s):

None Validation Time:

xxxxx minutes Simulator Setup:

None NRC H-10 Page 2 of 7 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S / U STEP E COMMENTS (Reqd for UNSAT Evaluation) 3 STEP

(* = Critical Step)

(# = Sequential Step)

Provide a copy of LOPA-1, Sheet 2.

Locally close CV83, SEAL WATER FILTER INLET Locally close CV89, SEAL WATER FILTER INLET STANDARD Refers to LOPA-1, Sheet 2, Step 27.

Locates CV83 in 84 R elevation Aux Bldg in Seal Water Injection Filter Valve Room. Closes valve by depressing and holding motor operator declutch lever and turning handwheel in clockwise direction.

Locates CV89 in 84 R elevation Aux Bldg in Seal Water Injection Filter Valve Room, Closes valve by depressing and holding motor operator declutch lever and turning handwheel in clockwise direction.

NRC H-10 Page 3 of 7 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

4 -

5 6

STEP

(* = Critical Step)

(# = Sequential Step)

Locally close CV95, SEAL WATER FILTER BYPASS.

Locally close CV116, SEAL WATER TO VCT VALVE.

Locally close CV13 1, RCP T H E W BARRIER VALVE.

STANDARD Locates CV95 in 84 ft elevation Aux Bldg in Seal Water Injection Filter Valve Room. Closes valve by depressing and holding motor operator declutch lever and turning handwheel in clockwise direction.

Locates CV116 in 78 ft elevation Mech Pen Area SG B D HX Area. Closes valve by depressing and holding motor operator declutch lever and turning handwheel in clockwise direction.

Locates CV13 1 in 78 ft elevation Mech Pen Area SG B D HX Area. Closes valve by depressing and holding motor operator declutch lever and turning handwheel in clockwise direction.

EVAL s/u COMMENTS (Reqd for UNSAT Evaluation)

NRC H-10 Page 4 of 7 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 STEP

(* = Critical Step)

(# = Sequential Step)

L EVAL COMMENTS STANDARD S / U (Reqd for UNSAT Evaluation)

STEP NO.

7 NOTIFY Control Room that RCP Seal Cooling has been isolated.

Informs control room that RCP Seal Cooling has been isolated.

TERMINATING CUE: Control room has been informed that RCP Seal Cooling has been isolated.

NRC H-10 Page 5 of 7 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-10 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

~~

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-10 Page 6 of 7 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

A loss of all AC power has occurred. The unit was operating normally at full power prior to the event.

INITIATING CUE:

You are directed to locally isolate RCP Seal Cooling per Step 27 of EOP-LOPA-1.

NRC H-10 Page 7 of 7 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: SALEM 1&2 Job Performance Measure No.: NRC H-11 Task

Title:

Perform an Authorized Release of Radioactive Liquid Waste to the Circ Water System from 21 CVCS Monitor Tank Task Number: 0685030101 WA

Reference:

068 A4.02 (3.2,3.1)

Method of testine:

Simulated Perfonnance:

Actual Performance:

Classroom:

Simulator:

4 Plant:

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The unit is at 100% power. A discharge of the 21 CVCS Monitor Tank has been directed. Recirculation of the monitor tank has been completed.

Chemistry has authorized a maximum allowable release rate of 225 gpm.

Task Standard:

Discharge 21 CVCS Monitor Tank to Unit 1 CW via Unit 2 Service Water using #21 CCW Heat Exchanger.

Evaluation Criteria:

1.

All critical steps completed.

2.
3.
4.

All sequential steps completed in order.

All time-critical steps completed within allotted time.

JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

Personnel Protective Equipment NRC H-11 Page 1 of 10 NUREG-1 02 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet General

References:

1.

S2.OP-S0.W-0001, Release of Radioactive Liquid Waste From 21 CVCS Monitor Tank Applicability:

EO RO 4

SRO 4

Initiating Cue:

You have been directed to perform a release of 21 CVCS Monitor Tank to Unit 1 Circ Water via Unit 2 Service Water using #21 CCW Heat Exchanger. All initial conditions have been satisfied.

Time Critical Task(s):

None Validation Time:

15 minutes Simulator Setup:

Not Applicable. JPM is performed locally in plant.

NRC H-11 Page 2 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EVAL S / U STEP NO. -

COMMENTS (Reqd for UNSAT Evaluation) 1 STEP

(* = Critical Step)

(# = Sequential Step)

~~

Operator obtains S2.0P-S0.W-0001, Rev 20, Release of Radioactive Liquid Waste from 21 CVCS Monitor Tank.

Verify Service Water flow through 21 CCW HX.

~

STANDARD Proper procedure obtained Determines flow thru 21 CCW HX.

CUE: When SW flowmeter is located, inform operator that it indicates >500 Determines Circulating Water Pumps are running.

CUE:

NRC H-11 Page 3 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

2 3

STEP

(* = Critical Step)

(# = Sequential Step)

ENSURE CLOSED the following valves:

2WL115, WASTE DISCHARGE HDR X-CONN VLV 2WL49, WMT PMP DISCHARGE STOP 2WL156, WASTE DISCHARGE HDR FLUSH VLV 2WL185, WMHT DISCH V 2WL5 1, LIQUID RELEASE STOP VALVE 2WL53, WMT PMP RECIRC WMTS ISOL V 2WL56, WMT TO WHUT STOP VLV

- OVBD UNLOCK and OPEN 2WL50, LIQUID WASTE OVERBOARD STOP VALVE.

STANDARD

~~~

_ _ _ _ ~

Locates and verifies valves closed.

Locates and opens valve.

~~

~

EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

NRC H-11 Page 4 of 10 NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 STEP NO.

4 -

5 NRC H-11 STEP

(* = Critical Step)

(# = Sequential Step)

UNLOCK and OPEN 21SW222, WASTE DISPOSAL OVERBOARD VLV TO 21 DISCHARGE HDR.

Veri@ 2R18 operability.

STANDARD Locates and opens valve.

Requests NCO to verify 2R18 operable.

CUE: NCO reports 2R18 verified operable.

EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

Page 5 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEI NO.

6 STEP

(* = Critical Step)

(# = Sequential Step)

Align 2R18 Monitor Return to 21 MT Pump on Recirc as follows:

a. ENSUREOPEN 2WL471,2R18 INLET ISOLATION VALVE
b. ENSUREOPEN 2WL472,2R18 OUTLET ISOLATION VALVE
c. ENSUREOPEN 2WL390, OUTLET VLV
d. OPEN 21WR165,2R18 MONITOR RETURN
e. ENSUREOPEN 21WR170,2R18 MONITOR RETURN ISOL VLV STANDARD Locates and opens valves.

CUE: 21WR165,2R18 MONITOR RETURN does NOT open on demand.

NRC H-11 Page 6 of 10 EVAL S I U COMMENTS (Reqd for UNSAT Evaluation)

NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP NO.

7 -

8 NRC H-1 1 STEP

(* = Critical Step)

(# = Sequential Step)

Notify the Control RoodCRS that the 2R18 Monitor cannot be placed into service as required by Prerequisite 2.3 because the 21WR165 valve cannot be opened.

STANDARD Notifies the Control RoodCRS that procedure step cannot be completed as written.

CUE: As CRS, Inform the candidate that to stop further actions and return to the control room. JPM is complete.

CUE: If the candidate continues without notifying the Control RoodCRS of the inability to open 21WR165, terminate the JPM when the Independent Verification step is reached.

Locates valve and verifies locked closed.

ENSURE LOCKED CLOSED 21SW468,21 SW RM CLR RETURN HDR ENSURE LOCKED OPEN 21SW472,21 SW RM CLR RET HDR ISOL VLV.

X-TIE ISOL VLV.

Page 7 of 10 EVAL s / u -

COMMENTS (Reqd for UNSAT Evaluation)

NUREG-102 1, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet STEP STEP

(* = Critical Step)

NO.

(# = Sequential Step)

~

EVAL S / U

~~

~

STANDARD COMMENTS (Reqd for UNSAT Evaluation) 9 Independent Verification performed IAW Attachment 2, step 4.1.1.

CUE: Independent Verification completed with no problems noted.

TERMINATING CUE: 2WR165 failed to open as required OR Independent Verification step completed.

NRC H-11 Page 8 of 10 NUREG-102 1, Revision 9

~

Appendix C Job Performance Measure Form ES-C-1 Worksheet VERIFICATION OF COMPLETION Job Performance Measure Number:

NRC H-11 Examinee:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question:

Examinee Response:

Result:

SAT UNSAT Examiners Signature and Date:

NRC H-1 1 Page 9 of 10 NUREG-1021, Revision 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXAMINEES CUE SHEET INITIAL CONDITIONS:

The unit is at 100% power. A discharge of the 21 CVCS Monitor Tank has been directed. Recirculation of the monitor tank has been completed. Chemistry has authorized a maximum allowable release rate of 225 gpm.

INITIATING CUE:

You have been directed to perform a release of 21 CVCS Monitor Tank to Unit 1 Circ Water via Unit 2 Service Water using #21 CCW Heat Exchanger. All initial conditions have been satisfied.

NRC H-11 Page 10 of 10 NUREG-102 1, Revision 9