ML031130136
| ML031130136 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 04/07/2003 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-03-058 | |
| Download: ML031130136 (5) | |
Text
FENOC Fiss.,&
=
eucr 0Cea OflT 7 Qar v.y_
Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-03-058 April 7, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66
-- Unit2 -Docket-No..50A12.LicenseNo. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of March, 2003.
M. B. Bezillen Vice-President DTJ/cmg Enclosures cc:
NRC Regional Office King of Prussia, PA
}
I
. 1 I
t *
~4-1
- I
.- I I
- l r w
/ ;
1 e X
{
,X I.
4 j
1
UNIT SHUTDOWNS DOCKET NO.
50-334 UNIT NAME BVPS Unit #1 DATE April 1, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 REPORTING PERIOD:
March 2003 Date Type Duration Reason Method of Cause I Corrective Actions No.
(Y1M/D)
F. Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments 2
03/03/08 S
576.0 C
1 The Unit was shut down for its planned 15'i refueling outage.
(1) Reason (2) Method A - Equipment Failure (Explain)
I - Manual B - Maintenance or Test 2 - Manual Tnip I Scram C - Refueling 3 -Automatic Trip I Scram D - Regulatory Restriction 4 -Continuation E - Operator Traini ng I Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit began the report period continuing to increase power from approximately 39% output beginning at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on 2/28/03 to approximately 58% output at 0250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> on 3/1/03. The Unit was operating at reduced output because only one Main Feedwater Pump operation was possible following loss of the "D" 4KV Bus (tripped on overcurrent during start of the second Main Feedwater Pump on-2/27fO3-during-Unit-startup following-a-reactor trip -on-2/24/03 when-the-"C"Main-Steahf-Isolation Valve failed closed). A reduction in output was begun at 1411 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.368855e-4 months <br /> on 311/03 due to elevated motor inboard bearing temperatures on the running "A7 Main Feedwater Pump. The reduction was halted at approximately 55% output at 1433 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.452565e-4 months <br /> on 3/1/03 when motor bearing temperatures were lowered and stabilized following placement of additional ventilation to cool the motors. The Unit remained operating at approximately 55% output while evaluation of the bus trip from 2/27/03 continued. At 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> on 3/7/03, the Unit reduced output from approximately 55% to 48% in order to begin performing planned Main Steam Safety Valve testing prior to the beginning of the 15"i refueling outage. An output of approximately 48% was achieved at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> on 3/7/03. At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on 3/7/03, the Unit began to shut down for its planned 15 1 refueling outage. The Unit was removed from service at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on 3/8/03. Mode 2 was entered at 0017 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> and Mode 3 was entered at 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> on 3/8/03. The Unit continued to cool down and depressurize, entering Mode 4 at 0338 hours0.00391 days <br />0.0939 hours <br />5.588624e-4 weeks <br />1.28609e-4 months <br /> and Mode 5 at 1135 hours0.0131 days <br />0.315 hours <br />0.00188 weeks <br />4.318675e-4 months <br /> on 3/8/03. The Unit entered Mode 6 at 0608 hours0.00704 days <br />0.169 hours <br />0.00101 weeks <br />2.31344e-4 months <br /> on 3/14/03 and remained in this refueling mode for the remainder of the report period.
OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
REPORT DATE:
COMPLETED BY:
TELEPEONE:
50-334 BVPS UNIT #1 04/01/03 DAVID T. JONES (724) 682-4962 la.
REPORTING PERIOD:
MARCH 2003
- 1.
DESIGN ELECTRICAL RATING (Net MWe):
835
- 2.
MAX. DEPENDABLE CAPACITY (Net MWe):
821 x,*
- Notes:
Rated thermal power at
- BVPS-1 was uprated from 2652 MWt*
- to 2689 MWt on 10/20/01.
Net
- MDC was also uprated from
- 810 MWe to 821 MWe.
3a.
3.
4.
5.
6.
7.
8.
9.
10.
11.
THIS MONTH HOURS IN REPORTING PERIOD:
744.0 NO. OF HRS. REACTOR WAS CRITICAL:
168.3 SERVICE HOURS GENERATOR ON LINE:
168.0 UNIT RESERVE SHUTDOWN HOURS:
0.0 NET ELECTRICAL ENERGY GEN. (MWH):
68757.0 GROSS ELECT. ENERGY GEN. (MWE):
78037.0 GROSS THERMAL ENERGY GEN. (MWE):
242589.0 UNIT AVAILABILITY FACTOR (%):
22.6 UNIT CAPACITY FACTOR (MDC) (M):
11.3 UNIT FORCED OUTAGE RATE (%):
0.0 YEAR TO DATE 2160.0 1531.5 1525.2 0.0 1182118.0 1258418.0 3814009.0 70.6 66.7 3.7 CUMULATIVE 235944.0 162123.0 159637.2 0.0 119838125.0 127928008.0 394085318.5 69.1 64.5 15.6
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-412 BVPS Unit #2 April 1, 2003 David T. Jones (724) 682-4962 REPORTING PERIOD:
March 2003 No.
Date Type Duration Reason Method of Cause ICorrective Actions (YIMID)
F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments NONE.
(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 -Automatic Trip I Scram D - Regulatory Restriction 4 -Continuation E - Operator Training / Ucense Examination 5 -Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 1 00% output for the entire report period.
OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
REPORT DATE:
COMPLETED BY:
TELEPHONE:
50-412 BVPS UNIT #2 04/01/03 DAVID T. JONES (724) 682-4962 la.
REPORTING PERIOD:
MARCH 2003
- 1.
DESIGN ELECTRICAL RATING (Net MWe):
- 2.
MAX. DEPENDABLE CAPACITY (Net MWe):
- Notes: Rated thermal power at
- BVPS-2 was uprated from 2652 MWt*
- to 2689 Mwt on 10/30/01.
Net
- MDC was also uprated from
- 820 EWe to 831 MWe.
836 831 3a.
3.
4.
5.
6.
7.
8.
9.
10.
11.
HOURS IN REPORTING PERIOD:
NO. OF HRS.
REACTOR WAS CRITICAL:
SERVICE EOURS GENERATOR ON LINE:
UNIT RESERVE SHUTDOWN HOURS:
NET ELECTRICAL ENERGY GEN.
(MWH):
GROSS ELECT.
ENERGY GEN.
(MWH):
GROSS THERMAL ENERGY GEN.
(MWH):
UNIT AVAILABILITY FACTOR (%):
UNIT CAPACITY FACTOR (MDC) (%):
UNIT FORCED OUTAGE RATE (%):
THIS MONTH 744.0 744.0 744.0 0.0 628381.0 660934.0 1997749.0 100.0 101.6 0.0 YEAR TO DATE 2160.0 2160.0 2160.0 0.0 1826680.0 1919323.0 5799731.0 100.0 101.8 0.0 CUMULATIVE 134727.0 111715.1 110986.5 0.0 87009083.0 91951368.0 280399342.0 82.4 77.7 9.6