IR 07100004/2011014
| ML20234E959 | |
| Person / Time | |
|---|---|
| Site: | 07100004, Prairie Island |
| Issue date: | 12/31/1987 |
| From: | Guldemond W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20234E946 | List: |
| References | |
| 50-282-87-16, 50-306-87-15, NUDOCS 8801110271 | |
| Download: ML20234E959 (2) | |
Text
_ _ _ _ _ _ - - _ - - _ _ - - - _ _ - - - - - - - - - _ - - - - - - - ----------- -------
- - - - - - - - - - - - - - - -.
,
.
..
,
Docket No. 50-282 Northern States Power Company Docket No. 50-306 14, 1987 As a result of the inspection conducted on October 4 through November f
t and in accordance with the " General Policy and Procedures for NRC Actions," 10 CFR Part 2, Appendix C (1987), the following violations we identified:
Technical Specification 3.7.A.1 requires that the reactor shall n 1.
maintained critical or above 200from the grid to the plant 4KV sa
.'
Technical Speficiation 3.7.B requires that the reactor shall be pl A
the cold shutdown condition if the requirements of specification 3.7
,
l can not be satisfied, one of the two paths from the 28, 1987, Contrary t6 the above, on Octobergrid to Safeguards 4KV bu
.
'
in cold l
minutes and action was not initiated to place the reactot l;
'
shutdown.
This is a Severity Level IV violation (Supplement I)
10 CFR 50, Appendix B, Criterion V, states, in part that " Activities affecting quality shall be prescribed by documen
'
2.
instructions, procedures..."
while removing electrical 19, 1987, Contrary to the above, on Octobercabling, craft personnel failed
!
QC hold points at cable cuts and cut the wrong cable.
i This is a Severity Level IV violation (Supplement I).
"
Technical Specification Paragraph 6.5 states in part that " Detailed written procedures, including the applicable check 3.
Subparagraph 6.5.F deals with Security Procedures.
followed.
5.1.1, Revision 0, entitled " Security Policies and Procedures" requires in Step 6.2.8 that "when escorting visitors Security Procedure SAW:
a Vital Area the escort SHALL... Use their badge to open the Vita Area door... The visitor can then place their ba open."
Contrary to the above, during the week of Novem j
.
!
Operator Licensing Examiners (visitors) to badge in first.
8801110271 871231 PDR ADOCK 05000282 G
- _ - _ _ _ _ - _ _ _
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
..
'
This is a Severity Level V violation (Supplement III).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or (1) corrective action explanation in reply, including for each violation:taken and the results
,
l further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
9h
'
DECs1im
W/G. Guldep6nd, Chief Dated Frojects 9fanch 2 l
l l
l l
'
,
l I
l l
l l'
l'